Synthetic ramen bridge incorporating prestress and its construction method
The present invention relates to a synthetic Rahmen bridge incorporating a prestress and a construction method thereof. The synthetic Rahmen bridge comprises: a steel girder; a pair of corner joint blocks disposed in a gap where the steel girder is disposed; and a middle point block interposed between the pair of the corner joint blocks, wherein the corner joint block has an abutment stress unit having a structure where it gets higher or lower from an end portion at one side to an end portion at the other side and the middle point block has a pier stress unit having a structure where it gets higher from both ends to a central portion. In addition, the construction method of a synthetic Rahmen bridge comprises the following steps of: a) burying anchors in abutment concrete and pier concrete and the top portion thereof to make construction; b) joining and installing an abutment portion steel post and a pier steel post to the anchors on the top portion of the abutment concrete and the pier concrete; c) joining and installing the steel girder in the upper part of the abutment portion steel post and the pier portion steel post; d) installing a sheath pipe of the abutment stress unit and a sheath pipe of the pier stress unit within the corner joint blocks and the middle point block; e) placing concrete in order to form upper concrete by integrating the steel girders into the corner joint blocks and the middle point block; and f) applying a stress to the abutment stress unit and the pier stress unit in order to prevent excessive sagging caused by long-term performance.
본 발명은 프리스트레스를 도입한 합성형 라멘교 및 이의 시공방법에 관한 것으로, 상기 합성형 라멘교의 구성은, 강재거더와, 상기 강재거더가 배치된 간격 사이에 위치하는 한 쌍의 우각부블록과, 상기 한 쌍의 우각부블록 사이에 위치하는 중간지점블록을 포함하는 합성형 라멘교에 있어서, 상기 우각부블록은 일측 단부로부터 타측 단부로 갈수록 높이가 증가하거나 낮아지는 구조를 갖는 교대긴장유닛이 배치되며, 상기 중간지점블록은 양단부로부터 중앙부로 갈수록 높이가 증가하는 구조를 갖는 교각긴장유닛이 배치되는 구성으로 이루어진다. 또한, 합성형 라멘교의 시공방법은, a) 교대콘크리트와 교각콘크리트 및 그 상단에 앵커를 매입하여 시공하는 단계; b) 교대콘크리트와 교각콘크리트 상단의 앵커에 교대부 강재포스트와 교각부 강재포스트를 결합 설치하는 단계; c) 강재거더를 교대부 강재포스트와 교각부 강재포스트의 상부에 결합 설치하는 단계; d) 교대긴장유닛의 쉬스관과 교각긴장유닛의 쉬스관을 우각부블록과 중간지점블록 내에 시공하는 단계; e) 강재거더와 우각부블록 및 중간지점블록을 일체화하여 상부콘크리트를 형성하기 위해 콘크리트를 타설하는 단계; 및 f) 장기공용에 따른 과다처짐을 방지하기 위해 교대긴장유닛과 교각긴장유닛에 긴장력을 도입하는 단계;를 포함하여 이루어진다.
Synthetic ramen bridge incorporating prestress and its construction method
The present invention relates to a synthetic Rahmen bridge incorporating a prestress and a construction method thereof. The synthetic Rahmen bridge comprises: a steel girder; a pair of corner joint blocks disposed in a gap where the steel girder is disposed; and a middle point block interposed between the pair of the corner joint blocks, wherein the corner joint block has an abutment stress unit having a structure where it gets higher or lower from an end portion at one side to an end portion at the other side and the middle point block has a pier stress unit having a structure where it gets higher from both ends to a central portion. In addition, the construction method of a synthetic Rahmen bridge comprises the following steps of: a) burying anchors in abutment concrete and pier concrete and the top portion thereof to make construction; b) joining and installing an abutment portion steel post and a pier steel post to the anchors on the top portion of the abutment concrete and the pier concrete; c) joining and installing the steel girder in the upper part of the abutment portion steel post and the pier portion steel post; d) installing a sheath pipe of the abutment stress unit and a sheath pipe of the pier stress unit within the corner joint blocks and the middle point block; e) placing concrete in order to form upper concrete by integrating the steel girders into the corner joint blocks and the middle point block; and f) applying a stress to the abutment stress unit and the pier stress unit in order to prevent excessive sagging caused by long-term performance.
본 발명은 프리스트레스를 도입한 합성형 라멘교 및 이의 시공방법에 관한 것으로, 상기 합성형 라멘교의 구성은, 강재거더와, 상기 강재거더가 배치된 간격 사이에 위치하는 한 쌍의 우각부블록과, 상기 한 쌍의 우각부블록 사이에 위치하는 중간지점블록을 포함하는 합성형 라멘교에 있어서, 상기 우각부블록은 일측 단부로부터 타측 단부로 갈수록 높이가 증가하거나 낮아지는 구조를 갖는 교대긴장유닛이 배치되며, 상기 중간지점블록은 양단부로부터 중앙부로 갈수록 높이가 증가하는 구조를 갖는 교각긴장유닛이 배치되는 구성으로 이루어진다. 또한, 합성형 라멘교의 시공방법은, a) 교대콘크리트와 교각콘크리트 및 그 상단에 앵커를 매입하여 시공하는 단계; b) 교대콘크리트와 교각콘크리트 상단의 앵커에 교대부 강재포스트와 교각부 강재포스트를 결합 설치하는 단계; c) 강재거더를 교대부 강재포스트와 교각부 강재포스트의 상부에 결합 설치하는 단계; d) 교대긴장유닛의 쉬스관과 교각긴장유닛의 쉬스관을 우각부블록과 중간지점블록 내에 시공하는 단계; e) 강재거더와 우각부블록 및 중간지점블록을 일체화하여 상부콘크리트를 형성하기 위해 콘크리트를 타설하는 단계; 및 f) 장기공용에 따른 과다처짐을 방지하기 위해 교대긴장유닛과 교각긴장유닛에 긴장력을 도입하는 단계;를 포함하여 이루어진다.
Synthetic ramen bridge incorporating prestress and its construction method
프리스트레스를 도입한 합성형 라멘교 및 이의 시공방법
YOO HYUNG SIG (author)
2021-05-28
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Efficiency-improved Ramen Bridge Construction Method and Ramen Bridge Constructed by It
European Patent Office | 2024
|European Patent Office | 2023
|Bridge prestress device and bridge prestress construction method
European Patent Office | 2022
|