A platform for research: civil engineering, architecture and urbanism
Mound Leveling Method for Oceanic Construction
The present invention relates to a construction method of a mound constructed on the seabed for construction of an oceanic structure such as a breakwater. A mound leveling device capable of automating a leveling operation is used for the construction. The mound leveling device comprises: a body frame (10) extending long in a front-rear direction; an outrigger (60) and a rail member (19) installed on the body frame (10); a moving device (30) installed on the rail member (19); a power generating device (35) for driving the moving device (30); a blade (40) installed in front of the moving device (30); a hydraulic cylinder for driving the expansion and contraction of the outrigger (60); and an elevating driving unit (44) for adjusting the relative height of the blade (40) with respect to the moving device (1). The construction is performed by the steps of: dropping ripraps lower than a reference level in a section to generate a foundation riprap layer; temporarily mounting the mound leveling device (1); adjusting the deployment length of the outrigger (60) to stationarily mount the rail member (19) of the temporarily mounted mound leveling device (1) so as to be horizontal; dropping the ripraps higher than the reference level in front of the mobile device (1); moving the moving device (1) to level the riprap to the reference level; and repeating the operation by moving the mound leveling device (1) to a next working section.
본 발명은 방파제와 같은 해양구조물의 시공을 위해 해저면에 구축되는 마운드의 시공 방법에 관한 것이다. 상기 시공에는 평탄화 작업을 자동화할 수 있는 마운드 평탄화 장치가 사용된다. 상기 장치는: 전후방향으로 길게 연장되는 바디프레임(10); 상기 바디프레임(10)에 설치되는 아우트리거(60)와 레일부재(19); 상기 레일부재(19)에 설치되는 이동장치(30); 상기 이동장치(30)를 구동하는 동력발생장치(35); 상기 이동장치(30)의 전방에 설치된 블레이드(40); 상기 아우트리거(60)의 신축을 구동하는 유압실린더; 상기 이동장치(1)에 대해 상기 블레이드(40)의 상대적인 높이를 조절하는 승강구동부(44)를 구비한다. 상기 시공은, 기초사석층을 조성하기 위한 구간에 기준레벨보다 낮게 사석을 투하하고, 상기 마운드 평탄화 장치(1)를 가거치하고, 상기 아우트리거(60)의 전개 길이를 조절하여 가거치된 마운드 평탄화 장치(1)의 레일부재(19)가 수평을 이루도록 정거치하고, 상기 이동장치(1)의 전방에 기준레벨보다 높게 사석을 투하하고, 상기 이동장치(1)를 이동시켜 사석을 기준레벨로 평탄화 하고, 마운드 평탄화 장치(1)를 다음 작업 구간으로 이동시켜 상기 작업을 반복하는 방식으로 이루어진다.
Mound Leveling Method for Oceanic Construction
The present invention relates to a construction method of a mound constructed on the seabed for construction of an oceanic structure such as a breakwater. A mound leveling device capable of automating a leveling operation is used for the construction. The mound leveling device comprises: a body frame (10) extending long in a front-rear direction; an outrigger (60) and a rail member (19) installed on the body frame (10); a moving device (30) installed on the rail member (19); a power generating device (35) for driving the moving device (30); a blade (40) installed in front of the moving device (30); a hydraulic cylinder for driving the expansion and contraction of the outrigger (60); and an elevating driving unit (44) for adjusting the relative height of the blade (40) with respect to the moving device (1). The construction is performed by the steps of: dropping ripraps lower than a reference level in a section to generate a foundation riprap layer; temporarily mounting the mound leveling device (1); adjusting the deployment length of the outrigger (60) to stationarily mount the rail member (19) of the temporarily mounted mound leveling device (1) so as to be horizontal; dropping the ripraps higher than the reference level in front of the mobile device (1); moving the moving device (1) to level the riprap to the reference level; and repeating the operation by moving the mound leveling device (1) to a next working section.
본 발명은 방파제와 같은 해양구조물의 시공을 위해 해저면에 구축되는 마운드의 시공 방법에 관한 것이다. 상기 시공에는 평탄화 작업을 자동화할 수 있는 마운드 평탄화 장치가 사용된다. 상기 장치는: 전후방향으로 길게 연장되는 바디프레임(10); 상기 바디프레임(10)에 설치되는 아우트리거(60)와 레일부재(19); 상기 레일부재(19)에 설치되는 이동장치(30); 상기 이동장치(30)를 구동하는 동력발생장치(35); 상기 이동장치(30)의 전방에 설치된 블레이드(40); 상기 아우트리거(60)의 신축을 구동하는 유압실린더; 상기 이동장치(1)에 대해 상기 블레이드(40)의 상대적인 높이를 조절하는 승강구동부(44)를 구비한다. 상기 시공은, 기초사석층을 조성하기 위한 구간에 기준레벨보다 낮게 사석을 투하하고, 상기 마운드 평탄화 장치(1)를 가거치하고, 상기 아우트리거(60)의 전개 길이를 조절하여 가거치된 마운드 평탄화 장치(1)의 레일부재(19)가 수평을 이루도록 정거치하고, 상기 이동장치(1)의 전방에 기준레벨보다 높게 사석을 투하하고, 상기 이동장치(1)를 이동시켜 사석을 기준레벨로 평탄화 하고, 마운드 평탄화 장치(1)를 다음 작업 구간으로 이동시켜 상기 작업을 반복하는 방식으로 이루어진다.
Mound Leveling Method for Oceanic Construction
해양구조물 구축을 위한 기초사석층의 시공 및 고르기 방법
YUN TAI YOUNG (author)
2021-08-27
Patent
Electronic Resource
Korean
RUBBLE MOUND LEVELING SYSTEM AND RUBBLE MOUND LEVELING METHOD
European Patent Office | 2023
|RUBBLE MOUND LEVELING SYSTEM AND RUBBLE MOUND LEVELING METHOD
European Patent Office | 2023
|