RUBBLE MOUND LEVELING SYSTEM AND RUBBLE MOUND LEVELING METHOD
To provide a technique to enable a rough leveling process for a rubble mound without relying on a diver.SOLUTION: A rubble mound leveling system comprises: a leveling member suspended by a wire of a crane of a floating crane ship; an altitude sensor that is fitted to the wire of the crane and senses an altitude; a positioning sensor for positioning a jib point of the crane; and a crane control part to control a wire delivery amount of the crane depending on the altitude sensed by the altitude sensor and a design height of a rubble base to be constructed and control movement of the jib point of the crane depending on a position positioned by the positioning sensor and a position at which the rubble base is constructed. The altitude sensor is fitted to a place located above the sea level when a height of a bottom edge of the leveling member is aligned to the design height of the rubble base.SELECTED DRAWING: Figure 11
【課題】捨石マウンドのあら均し工程を、潜水士に頼らずに行える技術を提供する。【解決手段】起重機船のクレーンのワイヤに吊るされた均し部材と、クレーンのワイヤに取り付けられ、高度をセンシングする高度センサと、クレーンのジブポイントの位置を測位する測位センサと、高度センサによってセンシングされた高度と、構築する捨石基礎の設計高さとに応じてクレーンのワイヤの繰出量を制御し、また測位センサによって測位された位置と、捨石基礎を構築する位置とに応じてクレーンのジブポイントの移動を制御するクレーン制御部と、を備えている。高度センサは、均し部材の下端の高さを、捨石基礎の設計高さに合わせたときに、海面よりも上方に位置する場所に取り付けられている。【選択図】図11
RUBBLE MOUND LEVELING SYSTEM AND RUBBLE MOUND LEVELING METHOD
To provide a technique to enable a rough leveling process for a rubble mound without relying on a diver.SOLUTION: A rubble mound leveling system comprises: a leveling member suspended by a wire of a crane of a floating crane ship; an altitude sensor that is fitted to the wire of the crane and senses an altitude; a positioning sensor for positioning a jib point of the crane; and a crane control part to control a wire delivery amount of the crane depending on the altitude sensed by the altitude sensor and a design height of a rubble base to be constructed and control movement of the jib point of the crane depending on a position positioned by the positioning sensor and a position at which the rubble base is constructed. The altitude sensor is fitted to a place located above the sea level when a height of a bottom edge of the leveling member is aligned to the design height of the rubble base.SELECTED DRAWING: Figure 11
【課題】捨石マウンドのあら均し工程を、潜水士に頼らずに行える技術を提供する。【解決手段】起重機船のクレーンのワイヤに吊るされた均し部材と、クレーンのワイヤに取り付けられ、高度をセンシングする高度センサと、クレーンのジブポイントの位置を測位する測位センサと、高度センサによってセンシングされた高度と、構築する捨石基礎の設計高さとに応じてクレーンのワイヤの繰出量を制御し、また測位センサによって測位された位置と、捨石基礎を構築する位置とに応じてクレーンのジブポイントの移動を制御するクレーン制御部と、を備えている。高度センサは、均し部材の下端の高さを、捨石基礎の設計高さに合わせたときに、海面よりも上方に位置する場所に取り付けられている。【選択図】図11
RUBBLE MOUND LEVELING SYSTEM AND RUBBLE MOUND LEVELING METHOD
捨石マウンド均しシステム、および捨石マウンド均し方法
NODA MASAYUKI (author)
2023-09-27
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
RUBBLE MOUND LEVELING SYSTEM AND RUBBLE MOUND LEVELING METHOD
European Patent Office | 2023
|RUBBLE MOUND CONSTRUCTION SYSTEM AND RUBBLE MOUND CONSTRUCTION METHOD
European Patent Office | 2021
|