Method for constructing bridge inspection facility using form tie
The present invention relates to a bridge inspection facility construction method using a form tie. More specifically, the method includes the following steps of: inserting both ends of a sheath pipe into through holes formed on a sheathing board respectively such that the hollow sheath pipe with a tie bolt housed therein is provided between sheathing boards spaced apart from each other to construct a mold for the concrete-molding of a pier coping, and nut-coupling both ends of a tie bolt exposed to the outside of the sheathing boards through opening parts at both ends of the sheath pipe to maintain a predetermined distance between the sheathing boards; placing concrete between the sheathing boards; when the curing of the concrete placed between the sheathing boards is completed, releasing the nut-coupling of the tie bolt to remove the sheathing boards, and then, withdrawing the tie bolt housed in the sheath pipe from the sheath pipe; inserting a steel rod into the sheath pipe; and nut-coupling a fixing bracket with the steel rod in a state in which both ends of the steel rod exposed to the outside through the opening parts at both ends of the sheath pipe are penetrating fixing holes formed on the fixing bracket with which a bridge inspection facility is fixed and combined. According to the present invention, the form tie, which is installed to maintain a distance between molds when the concrete construction of a pier coping is performed, is used to substantially fix and install the fixing bracket, with which the bridge inspection facility is combined, on the steel rod traversing the inside of the concrete-molded pier coping.
본 발명은 폼타이를 이용한 교량점검시설 시공방법에 관한 것으로서, 보다 상세하게는, 교각 코핑의 콘크리트 성형을 위한 거푸집 시공을 위해 타이볼트가 내부에 수용된 중공의 쉬스관이 서로 이격하여 대응하는 거푸집널 사이에 마련되도록 쉬스관의 양단부가 거푸집널에 형성된 통공의 내측에 각각 삽입되고, 쉬스관의 양단 개구부를 통해 거푸집널의 외측으로 노출된 타이볼트의 양단부가 각각 너트 체결되어 거푸집널 사이를 일정 간격으로 유지시키는 단계와, 거푸집널 사이에 콘크리트가 타설되는 단계와, 거푸집널 사이에 타설된 콘크리트의 양생이 완료되면, 타이볼트의 너트 체결을 해제하여 거푸집널을 탈형한 후, 쉬스관에 수용된 타이볼트를 쉬스관에서 뽑아내는 단계와, 쉬스관의 내부에 강봉이 삽입되는 단계 및 쉬스관의 양측 개구부를 통해 외부로 각각 노출된 강봉의 양단부가 교량점검시설이 고정 결합되는 고정브라켓에 형성된 고정홀을 관통한 상태로 고정브라켓이 강봉에 너트 체결되는 단계를 포함하는 폼타이를 이용한 교량점검시설 시공방법에 관한 것이다. 본 발명에 따르면, 교각 코핑의 콘크리트 시공시 거푸집의 간격유지를 위해 설치되는 폼타이를 이용하여 콘크리트 성형된 교각 코핑의 내부를 가로지르는 강봉에 교량점검시설이 결합된 고정브라켓을 견고히 고정설치할 수 있다.
Method for constructing bridge inspection facility using form tie
The present invention relates to a bridge inspection facility construction method using a form tie. More specifically, the method includes the following steps of: inserting both ends of a sheath pipe into through holes formed on a sheathing board respectively such that the hollow sheath pipe with a tie bolt housed therein is provided between sheathing boards spaced apart from each other to construct a mold for the concrete-molding of a pier coping, and nut-coupling both ends of a tie bolt exposed to the outside of the sheathing boards through opening parts at both ends of the sheath pipe to maintain a predetermined distance between the sheathing boards; placing concrete between the sheathing boards; when the curing of the concrete placed between the sheathing boards is completed, releasing the nut-coupling of the tie bolt to remove the sheathing boards, and then, withdrawing the tie bolt housed in the sheath pipe from the sheath pipe; inserting a steel rod into the sheath pipe; and nut-coupling a fixing bracket with the steel rod in a state in which both ends of the steel rod exposed to the outside through the opening parts at both ends of the sheath pipe are penetrating fixing holes formed on the fixing bracket with which a bridge inspection facility is fixed and combined. According to the present invention, the form tie, which is installed to maintain a distance between molds when the concrete construction of a pier coping is performed, is used to substantially fix and install the fixing bracket, with which the bridge inspection facility is combined, on the steel rod traversing the inside of the concrete-molded pier coping.
본 발명은 폼타이를 이용한 교량점검시설 시공방법에 관한 것으로서, 보다 상세하게는, 교각 코핑의 콘크리트 성형을 위한 거푸집 시공을 위해 타이볼트가 내부에 수용된 중공의 쉬스관이 서로 이격하여 대응하는 거푸집널 사이에 마련되도록 쉬스관의 양단부가 거푸집널에 형성된 통공의 내측에 각각 삽입되고, 쉬스관의 양단 개구부를 통해 거푸집널의 외측으로 노출된 타이볼트의 양단부가 각각 너트 체결되어 거푸집널 사이를 일정 간격으로 유지시키는 단계와, 거푸집널 사이에 콘크리트가 타설되는 단계와, 거푸집널 사이에 타설된 콘크리트의 양생이 완료되면, 타이볼트의 너트 체결을 해제하여 거푸집널을 탈형한 후, 쉬스관에 수용된 타이볼트를 쉬스관에서 뽑아내는 단계와, 쉬스관의 내부에 강봉이 삽입되는 단계 및 쉬스관의 양측 개구부를 통해 외부로 각각 노출된 강봉의 양단부가 교량점검시설이 고정 결합되는 고정브라켓에 형성된 고정홀을 관통한 상태로 고정브라켓이 강봉에 너트 체결되는 단계를 포함하는 폼타이를 이용한 교량점검시설 시공방법에 관한 것이다. 본 발명에 따르면, 교각 코핑의 콘크리트 시공시 거푸집의 간격유지를 위해 설치되는 폼타이를 이용하여 콘크리트 성형된 교각 코핑의 내부를 가로지르는 강봉에 교량점검시설이 결합된 고정브라켓을 견고히 고정설치할 수 있다.
Method for constructing bridge inspection facility using form tie
폼타이를 이용한 교량점검시설 시공방법
KWON O KWEN (author) / KIM HYUNG TAE (author)
2021-10-13
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Bridge inspection facility construction method and bridge inspection facility constructed thereby
European Patent Office | 2020
|