A platform for research: civil engineering, architecture and urbanism
PRESTRESSED STEEL COMPOSITE GIRDER BRIDGE AND CONSTRCTION METHOD THEREOF
According to the present invention, a construction method of a prestressed steel composite girder bridge comprises: a first step of camber-manufacturing a steel truss including an upper chord member, a lower chord member, and a web member connecting the upper chord member and the lower chord member to be convex upwards; a second step of installing both ends of the camber-manufactured steel truss on a manufacturing bench to separate the steel truss from the ground; a third step of assembling a sheath pipe and a reinforcing bar on the lower chord member of the steel truss installed on the manufacturing bench, and pouring concrete after installing a form to form a lower flange; a fourth step of removing the form after the concrete of the lower flange is hardened, and moving the steel truss to a loading space to load the steel truss; and a fifth step of tensioning a PS strand in the sheath pipe to introduce prestress after the fourth step. The form is fixed on the upper chord member to be supported and the stress by the weight of the steel truss and the poured concrete can be generated only in the steel truss. Therefore, the present invention minimizes the amount of steel used by the optimal cross section of a low height to satisfy stability and improve economic efficiency.
본 발명은 프리스트레스트 강합성 거더 교량 시공방법은 상현재, 하현재 및 상기 상현재와 하현재를 연결하는 복부재를 포함하는 강재트러스를 상측으로 볼록하게 캠버 제작하는 1단계; 상기 캠버 제작된 강재트러스가 지면에서 이격되도록 양 단부를 제작대에 설치하는 2단계; 상기 제작대에 설치된 상기 강재트러스의 하현재에 쉬스관 및 철근을 조립하고, 거푸집을 설치한 후 콘크리트를 타설하여 하부플렌지를 형성하는 3단계; 상기 하부플렌지 콘크리트가 경화한 후 거푸집을 제거하고 상기 강재트러스를 적치공간으로 이동하여 적치하는 4단계; 상기 4단계 후 상기 쉬스관 내부의 PS강연선을 긴장하여 프리스트레스를 도입하는 5단계;를 포함하고, 상기 거푸집은 상기 상현재에 고정되어 지지되게 함으로써 상기 타설된 콘크리트와 강재트러스의 자중에 의한 응력은 상기 강재트러스에만 발생하게 할 수 있다. 따라서 본 발명은 저형고의 최적단면으로 강재 사용량을 최소화하여 안정성이 만족되면서도 경제성이 향상된다.
PRESTRESSED STEEL COMPOSITE GIRDER BRIDGE AND CONSTRCTION METHOD THEREOF
According to the present invention, a construction method of a prestressed steel composite girder bridge comprises: a first step of camber-manufacturing a steel truss including an upper chord member, a lower chord member, and a web member connecting the upper chord member and the lower chord member to be convex upwards; a second step of installing both ends of the camber-manufactured steel truss on a manufacturing bench to separate the steel truss from the ground; a third step of assembling a sheath pipe and a reinforcing bar on the lower chord member of the steel truss installed on the manufacturing bench, and pouring concrete after installing a form to form a lower flange; a fourth step of removing the form after the concrete of the lower flange is hardened, and moving the steel truss to a loading space to load the steel truss; and a fifth step of tensioning a PS strand in the sheath pipe to introduce prestress after the fourth step. The form is fixed on the upper chord member to be supported and the stress by the weight of the steel truss and the poured concrete can be generated only in the steel truss. Therefore, the present invention minimizes the amount of steel used by the optimal cross section of a low height to satisfy stability and improve economic efficiency.
본 발명은 프리스트레스트 강합성 거더 교량 시공방법은 상현재, 하현재 및 상기 상현재와 하현재를 연결하는 복부재를 포함하는 강재트러스를 상측으로 볼록하게 캠버 제작하는 1단계; 상기 캠버 제작된 강재트러스가 지면에서 이격되도록 양 단부를 제작대에 설치하는 2단계; 상기 제작대에 설치된 상기 강재트러스의 하현재에 쉬스관 및 철근을 조립하고, 거푸집을 설치한 후 콘크리트를 타설하여 하부플렌지를 형성하는 3단계; 상기 하부플렌지 콘크리트가 경화한 후 거푸집을 제거하고 상기 강재트러스를 적치공간으로 이동하여 적치하는 4단계; 상기 4단계 후 상기 쉬스관 내부의 PS강연선을 긴장하여 프리스트레스를 도입하는 5단계;를 포함하고, 상기 거푸집은 상기 상현재에 고정되어 지지되게 함으로써 상기 타설된 콘크리트와 강재트러스의 자중에 의한 응력은 상기 강재트러스에만 발생하게 할 수 있다. 따라서 본 발명은 저형고의 최적단면으로 강재 사용량을 최소화하여 안정성이 만족되면서도 경제성이 향상된다.
PRESTRESSED STEEL COMPOSITE GIRDER BRIDGE AND CONSTRCTION METHOD THEREOF
프리스트레스트 강합성 거더 교량 및 그 시공방법
KIM DONGCHANG (author) / LEE SANGJUN (author) / LIM SANGIK (author)
2022-11-16
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
CONSTRUCTION METHOD OF PRESTRESSED STEEL COMPOSITE GIRDER BRIDGE
European Patent Office | 2016
|CONSTRUCTION METHOD OF PRESTRESSED STEEL COMPOSITE GIRDER BRIDGE
European Patent Office | 2016
Externally Prestressed Steel Box Girder Bridge
Trans Tech Publications | 2012
|Externally Prestressed Steel Box Girder Bridge
Tema Archive | 2012
|PRESTRESSED STEEL GIRDER AND COMPOSITE BRIDGE USING THE SAME
European Patent Office | 2018
|