CONSTRUCTION METHOD OF PRESTRESSED STEEL COMPOSITE GIRDER BRIDGE
Disclosed is a construction method capable of reducing an amount of a steel material used by reducing a stress burden to a steel girder and improving stress efficiency by additionally applying a compressive force to lower casing concrete when manufacturing a prestressed steel composite girder bridge. To achieve this, provided is the construction method of the prestressed steel composite girder bridge including: a step of forming a steel girder assembly; a step of fixating a temporary reinforcing steel plate to an upper flange of the steel girder assembly; a step of installing casing concrete with an anchorage device and a PC steel material in a lower flange of the steel girder assembly; a step of separating the temporary reinforcing steel plate from the steel girder assembly; a step of applying prestress by applying tension to the PC steel material; and a step of placing the steel girder assembly on an abutment and piers. According to the present invention, the stress efficiency can be improved by reducing the amount of the steel material used and additionally applying the compressive force.
프리스트레스트 강합성 거더교의 제작 시 강재 거더의 응력부담을 절감하여 강재량을 감소시키고 하부 케이싱 콘크리트에 추가의 압축력을 도입, 긴장효율을 증대시키는 시공방법이 개시된다. 이를 위하여 강재 거더 조립체를 생성하는 단계와, 강재 거더 조립체의 상부플랜지에 임시보강강판을 고정시키는 단계와, 상기 강재 거더 조립체의 하부플랜지에 정착구와 PC 강재가 구비된 케이싱 콘크리트를 설치하는 단계와, 상기 임시보강강판을 강재 거더 조립체로부터 분리하는 단계와, 상기 PC 강재를 긴장시켜 프리스트레스를 도입하는 단계, 및 강재 거더 조립체를 교대 및 교각위에 거치시키는 단계를 포함하는 프리스트레스트 강합성 거더교의 시공방법을 제공한다. 본 발명에 따르면, 강재량을 절감하고 압축력을 추가 도입하여 긴장효율을 증대시킬 수 있다.
CONSTRUCTION METHOD OF PRESTRESSED STEEL COMPOSITE GIRDER BRIDGE
Disclosed is a construction method capable of reducing an amount of a steel material used by reducing a stress burden to a steel girder and improving stress efficiency by additionally applying a compressive force to lower casing concrete when manufacturing a prestressed steel composite girder bridge. To achieve this, provided is the construction method of the prestressed steel composite girder bridge including: a step of forming a steel girder assembly; a step of fixating a temporary reinforcing steel plate to an upper flange of the steel girder assembly; a step of installing casing concrete with an anchorage device and a PC steel material in a lower flange of the steel girder assembly; a step of separating the temporary reinforcing steel plate from the steel girder assembly; a step of applying prestress by applying tension to the PC steel material; and a step of placing the steel girder assembly on an abutment and piers. According to the present invention, the stress efficiency can be improved by reducing the amount of the steel material used and additionally applying the compressive force.
프리스트레스트 강합성 거더교의 제작 시 강재 거더의 응력부담을 절감하여 강재량을 감소시키고 하부 케이싱 콘크리트에 추가의 압축력을 도입, 긴장효율을 증대시키는 시공방법이 개시된다. 이를 위하여 강재 거더 조립체를 생성하는 단계와, 강재 거더 조립체의 상부플랜지에 임시보강강판을 고정시키는 단계와, 상기 강재 거더 조립체의 하부플랜지에 정착구와 PC 강재가 구비된 케이싱 콘크리트를 설치하는 단계와, 상기 임시보강강판을 강재 거더 조립체로부터 분리하는 단계와, 상기 PC 강재를 긴장시켜 프리스트레스를 도입하는 단계, 및 강재 거더 조립체를 교대 및 교각위에 거치시키는 단계를 포함하는 프리스트레스트 강합성 거더교의 시공방법을 제공한다. 본 발명에 따르면, 강재량을 절감하고 압축력을 추가 도입하여 긴장효율을 증대시킬 수 있다.
CONSTRUCTION METHOD OF PRESTRESSED STEEL COMPOSITE GIRDER BRIDGE
임시보강강판에 의해 추가 프리스트레스가 도입된 프리스트레스트 강합성 거더교의 시공방법
HA SEUNG UK (author)
2016-07-08
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
CONSTRUCTION METHOD OF PRESTRESSED STEEL COMPOSITE GIRDER BRIDGE
European Patent Office | 2016
CONSTRUCTION METHOD OF PRESTRESSED COMPOSITE GIRDER BRIDGE
European Patent Office | 2015
PRESTRESSED STEEL COMPOSITE GIRDER BRIDGE AND CONSTRCTION METHOD THEREOF
European Patent Office | 2022
|