Energy reduction underground retaining wall demolition method
The present invention relates to an energy-saving underground retaining wall demolition method, which comprises: a first step of maintaining a underground retaining wall and removing a underground structure inside the retaining wall; a second step of drilling a floor slab at a position spaced inward from the underground retaining wall from at least one of a wall body forming the underground retaining wall or a CIP arranged behind the wall body to fix a lower pile into the ground; a third step of fixing by erecting an upper pile, to which tensile stress is applied, above the lower pile to be spaced apart from at least one of the wall body or the CIP; a fourth step of installing a support, both ends of which are fixed between at least one of the wall body and the CIP and the upper pile to support the underground retaining wall by the tensile stress applied to the upper pile; a fifth step of removing a portion of the underground retaining wall; a sixth step of backfilling earth; and a seventh step of removing at least one of the support, the upper pile, and the lower pile.
본 발명은 공사기간을 단축시키고 비용을 절감할 수 있도록 구현한 에너지 저감 지하옹벽 철거공법에 관한 것으로, 지하옹벽을 유지하고 지하옹벽 내측의 지하구축물을 제거하는 제1 단계; 지하옹벽을 형성하는 벽체 또는 상기 벽체의 배후에 배치되어 있는 CIP 중 적어도 하나로부터 지하옹벽의 내측으로 이격된 위치의 바닥슬라브를 천공하여 하부 파일을 지중에 고정하는 제2 단계; 상기 하부 파일의 상측에 인장 응력이 적용된 상부 파일을 상기 벽체 또는 상기 CIP 중 적어도 하나와 이격되게 기립하여 고정하는 제3 단계; 상기 상부 파일에 적용된 인장 응력에 의해 지하옹벽을 버티도록 상기 벽체 또는 상기 CIP의 적어도 하나와 상기 상부 파일 사이에서 양단이 고정되는 서포트를 설치하는 제4 단계; 지하옹벽의 일부분을 제거하는 제5 단계;토사를 되메우는 제6 단계; 및 상기 서포트, 상기 상부 파일 및 상기 하부 파일 중 적어도 하나를 제거하는 제7 단계;를 포함한다.
Energy reduction underground retaining wall demolition method
The present invention relates to an energy-saving underground retaining wall demolition method, which comprises: a first step of maintaining a underground retaining wall and removing a underground structure inside the retaining wall; a second step of drilling a floor slab at a position spaced inward from the underground retaining wall from at least one of a wall body forming the underground retaining wall or a CIP arranged behind the wall body to fix a lower pile into the ground; a third step of fixing by erecting an upper pile, to which tensile stress is applied, above the lower pile to be spaced apart from at least one of the wall body or the CIP; a fourth step of installing a support, both ends of which are fixed between at least one of the wall body and the CIP and the upper pile to support the underground retaining wall by the tensile stress applied to the upper pile; a fifth step of removing a portion of the underground retaining wall; a sixth step of backfilling earth; and a seventh step of removing at least one of the support, the upper pile, and the lower pile.
본 발명은 공사기간을 단축시키고 비용을 절감할 수 있도록 구현한 에너지 저감 지하옹벽 철거공법에 관한 것으로, 지하옹벽을 유지하고 지하옹벽 내측의 지하구축물을 제거하는 제1 단계; 지하옹벽을 형성하는 벽체 또는 상기 벽체의 배후에 배치되어 있는 CIP 중 적어도 하나로부터 지하옹벽의 내측으로 이격된 위치의 바닥슬라브를 천공하여 하부 파일을 지중에 고정하는 제2 단계; 상기 하부 파일의 상측에 인장 응력이 적용된 상부 파일을 상기 벽체 또는 상기 CIP 중 적어도 하나와 이격되게 기립하여 고정하는 제3 단계; 상기 상부 파일에 적용된 인장 응력에 의해 지하옹벽을 버티도록 상기 벽체 또는 상기 CIP의 적어도 하나와 상기 상부 파일 사이에서 양단이 고정되는 서포트를 설치하는 제4 단계; 지하옹벽의 일부분을 제거하는 제5 단계;토사를 되메우는 제6 단계; 및 상기 서포트, 상기 상부 파일 및 상기 하부 파일 중 적어도 하나를 제거하는 제7 단계;를 포함한다.
Energy reduction underground retaining wall demolition method
에너지 저감 지하옹벽 철거공법
JUN HYUN SOO (author) / JUNG JAE SEOK (author) / PARK JUNG WOOK (author) / KIM CHOL HO (author) / OH JUNG HWAN (author) / JANG KU HYNE (author) / KIM SUNG MUN (author) / KIM YOU JEONG (author)
2023-02-24
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Demolition method for column reserved in underground diaphragm wall
European Patent Office | 2023
|Construction method of pile box type underground building retaining wall and retaining wall
European Patent Office | 2024
|European Patent Office | 2023
|