Bottom-up thermal power plant chimney removal method
The present invention relates to a bottom-up thermal power plant funnel removal method. More specifically, the present invention relates to a bottom-up thermal power plant funnel removal method to remove a funnel by fixing a funnel from below the funnel by using lifting jacks, cutting the funnel, and withdrawing the cut blocks. The bottom-up thermal power plant funnel removal method comprises: a lifting beam attachment welding step of attaching lifting beams to the outer surface of a funnel for lifting the funnel; a lifting jack installation step of installing lifting jacks beneath the funnel for lifting the funnel, and raising the lifting jacks so that the lifting beams on the outer surface of the funnel can be mounted on the upper mounting surface of the lifting jacks; a funnel cutting step of cutting the funnel at a portion spaced below the lifting beam; a lifting jack upward movement step for raising the lifting jack to a predetermined height and fixing the lifting jack; a cut block withdrawing step of withdrawing the funnel block cut in the funnel cutting step to the outside; a lifting jack downward movement step of lowering the lifting jack to seat the funnel; another lifting beam attachment welding step for attaching lifting beams to the outer surface of the funnel for lifting; and another lifting jack upward movement step for raising the lifting jack so that the lifting beams on the outer surface of the funnel can be mounted on the upper mounting surface of the lifting jacks.
본 발명은 상향식 화력발전소 연통철거공법데 관한 것이다. 보다 상세하게는, 리프팅잭을 이용하여 연통의 하측에서 연통을 고정하여 연통절단 후 절단블록을 인출하여 연통을 철거하는 상향식 화력발전소 연통철거공법에 관한 것이다. 이를 위해 본 발명은 연통의 외면에 연통을 리프팅 하기 위하여 리프팅빔을 부착하는 리프팅빔부착용접단계; 연통의 하부에 연통을 리프팅하기 위한 리프팅잭을 설치하고, 리프팅잭의 상측 거치면에 연통 외면의 리프팅빔이 거치될 수 있도록 리프팅잭을 상승시키는 리프팅잭설치단계; 리프팅빔의 하방으로 이격된 부분의 연통을 절단하는 연통절단단계; 리프팅잭을 소정높이 상승시킨 후 고정하는 리프팅잭상방운동단계; 연통절단단계에서 절단한 연통블럭을 외부로 인출시키는 절단블럭인출단계; 리프팅잭을 하강시켜 연통을 안착시키는 리프팅잭하방운동단계; 연통의 외면에 연통을 리프팅하기 위하여 리프팅빔을 부착하는 리프팅빔부착용접단계; 리프팅잭의 상측 거치면에 연통 외면의 리프팅빔이 거치될 수 있도록 리프팅잭을 상승시키는 리프팅잭상방운동단계을 포함하는, 상향식 화력발전소 연통철거공법을 제공한다.
Bottom-up thermal power plant chimney removal method
The present invention relates to a bottom-up thermal power plant funnel removal method. More specifically, the present invention relates to a bottom-up thermal power plant funnel removal method to remove a funnel by fixing a funnel from below the funnel by using lifting jacks, cutting the funnel, and withdrawing the cut blocks. The bottom-up thermal power plant funnel removal method comprises: a lifting beam attachment welding step of attaching lifting beams to the outer surface of a funnel for lifting the funnel; a lifting jack installation step of installing lifting jacks beneath the funnel for lifting the funnel, and raising the lifting jacks so that the lifting beams on the outer surface of the funnel can be mounted on the upper mounting surface of the lifting jacks; a funnel cutting step of cutting the funnel at a portion spaced below the lifting beam; a lifting jack upward movement step for raising the lifting jack to a predetermined height and fixing the lifting jack; a cut block withdrawing step of withdrawing the funnel block cut in the funnel cutting step to the outside; a lifting jack downward movement step of lowering the lifting jack to seat the funnel; another lifting beam attachment welding step for attaching lifting beams to the outer surface of the funnel for lifting; and another lifting jack upward movement step for raising the lifting jack so that the lifting beams on the outer surface of the funnel can be mounted on the upper mounting surface of the lifting jacks.
본 발명은 상향식 화력발전소 연통철거공법데 관한 것이다. 보다 상세하게는, 리프팅잭을 이용하여 연통의 하측에서 연통을 고정하여 연통절단 후 절단블록을 인출하여 연통을 철거하는 상향식 화력발전소 연통철거공법에 관한 것이다. 이를 위해 본 발명은 연통의 외면에 연통을 리프팅 하기 위하여 리프팅빔을 부착하는 리프팅빔부착용접단계; 연통의 하부에 연통을 리프팅하기 위한 리프팅잭을 설치하고, 리프팅잭의 상측 거치면에 연통 외면의 리프팅빔이 거치될 수 있도록 리프팅잭을 상승시키는 리프팅잭설치단계; 리프팅빔의 하방으로 이격된 부분의 연통을 절단하는 연통절단단계; 리프팅잭을 소정높이 상승시킨 후 고정하는 리프팅잭상방운동단계; 연통절단단계에서 절단한 연통블럭을 외부로 인출시키는 절단블럭인출단계; 리프팅잭을 하강시켜 연통을 안착시키는 리프팅잭하방운동단계; 연통의 외면에 연통을 리프팅하기 위하여 리프팅빔을 부착하는 리프팅빔부착용접단계; 리프팅잭의 상측 거치면에 연통 외면의 리프팅빔이 거치될 수 있도록 리프팅잭을 상승시키는 리프팅잭상방운동단계을 포함하는, 상향식 화력발전소 연통철거공법을 제공한다.
Bottom-up thermal power plant chimney removal method
상향식 화력발전소 연통철거공법
CHANG MOO YONG (author)
2023-04-05
Patent
Electronic Resource
Korean
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Engineering Index Backfile | 1965
|140 m concrete chimney at Karlshamn's power plant
Engineering Index Backfile | 1968
|FRP Chimney Liners for Power Plant Flue Gas Desulfurization
British Library Online Contents | 2011
|CHIMNEY CONSTRUCTING UNIT AND CHIMNEY CONSTRUCTING METHOD
European Patent Office | 2016
|