A platform for research: civil engineering, architecture and urbanism
Tunnel steel pipe multi-stage grouting construction method using artificial intelligence-based smart grouting system
The present invention relates to a tunnel steel pipe multi-stage grouting construction method using an artificial intelligence-based smart grouting system, capable of shortening grouting construction time and improving construction quality and construction convenience by grafting an artificial intelligence-based grouting algorithm onto a tunnel steel pipe multi-stage grouting injection technology. The tunnel steel pipe multi-stage grouting construction method using the artificial intelligence-based smart grouting system includes: a step of confirming a tunnel steel pipe multi-stage construction position, boring the construction position, and inserting a steel pipe into the bored construction position; a step of performing caulking work and preparing grouting injection equipment and a material; a step of preparing grouting injection; a step of checking injection target ground through a site wet test before construction, determining a standard injection type by analyzing an injection type using an artificial intelligence-based control algorithm according to the checked injection target ground, and performing the grouting by generating and applying real-time measure information according to the analysis of the injection type while performing the grouting according to the determined standard injection type; a step of stopping the grouting injection when an injection stopping condition is satisfied, by checking the injection stopping condition by using the artificial intelligence-based control algorithm while the grouting is performed; and a step of generating a construction result report capable of comparing and analyzing a grouting construction result and stratum information at the same time based on grouting construction result information and the stratum information on a field in which the grouting injection is completed.
터널 강관다단 그라우팅 주입기술에 인공지능 기반 그라우팅 알고리즘을 접목하여 그라우팅 시공시간 단축, 시공품질향상, 시공 편의성 향상을 도모할 수 있도록 한 인공지능기반 스마트 그라우팅 시스템을 이용한 터널 강관다단 그라우팅 시공방법에 관한 것으로서, 터널 강관다단 시공 위치를 확인하고, 시공 위치에 천공 및 강관을 삽입하며, 코킹 작업을 수행하고, 그라우팅 주입 장비 및 자재를 준비하며, 그라우팅 주입을 준비하고, 시공 전 현장주수시험을 통해 주입 대상 지반을 확인하고, 확인한 주입 대상 지반에 따라 인공지능 기반 제어 알고리즘으로 주입유형을 분석하여 표준주입유형을 결정하고, 결정한 표준주입유형에 따라 그라우팅을 하면서 주입유형 분석에 따른 실시간 조치 정보를 생성 및 적용하여 그라우팅을 진행하며, 그라우팅을 진행하면서 인공지능 기반 제어 알고리즘으로 주입중단 조건을 확인하여, 주입중단 조건을 만족하면 그라우팅 주입을 중단하고, 그라우팅 주입이 종료된 현장의 지층정보와 그라우팅 시공결과 정보를 기초로 지층정보와 그라우팅 시공결과를 동시에 비교 및 분석할 수 있는 시공결과보고서를 생성하는 과정을 통해, 인공지능기반 스마트 그라우팅 시스템을 이용한 터널 강관다단 그라우팅 시공방법을 구현한다.
Tunnel steel pipe multi-stage grouting construction method using artificial intelligence-based smart grouting system
The present invention relates to a tunnel steel pipe multi-stage grouting construction method using an artificial intelligence-based smart grouting system, capable of shortening grouting construction time and improving construction quality and construction convenience by grafting an artificial intelligence-based grouting algorithm onto a tunnel steel pipe multi-stage grouting injection technology. The tunnel steel pipe multi-stage grouting construction method using the artificial intelligence-based smart grouting system includes: a step of confirming a tunnel steel pipe multi-stage construction position, boring the construction position, and inserting a steel pipe into the bored construction position; a step of performing caulking work and preparing grouting injection equipment and a material; a step of preparing grouting injection; a step of checking injection target ground through a site wet test before construction, determining a standard injection type by analyzing an injection type using an artificial intelligence-based control algorithm according to the checked injection target ground, and performing the grouting by generating and applying real-time measure information according to the analysis of the injection type while performing the grouting according to the determined standard injection type; a step of stopping the grouting injection when an injection stopping condition is satisfied, by checking the injection stopping condition by using the artificial intelligence-based control algorithm while the grouting is performed; and a step of generating a construction result report capable of comparing and analyzing a grouting construction result and stratum information at the same time based on grouting construction result information and the stratum information on a field in which the grouting injection is completed.
터널 강관다단 그라우팅 주입기술에 인공지능 기반 그라우팅 알고리즘을 접목하여 그라우팅 시공시간 단축, 시공품질향상, 시공 편의성 향상을 도모할 수 있도록 한 인공지능기반 스마트 그라우팅 시스템을 이용한 터널 강관다단 그라우팅 시공방법에 관한 것으로서, 터널 강관다단 시공 위치를 확인하고, 시공 위치에 천공 및 강관을 삽입하며, 코킹 작업을 수행하고, 그라우팅 주입 장비 및 자재를 준비하며, 그라우팅 주입을 준비하고, 시공 전 현장주수시험을 통해 주입 대상 지반을 확인하고, 확인한 주입 대상 지반에 따라 인공지능 기반 제어 알고리즘으로 주입유형을 분석하여 표준주입유형을 결정하고, 결정한 표준주입유형에 따라 그라우팅을 하면서 주입유형 분석에 따른 실시간 조치 정보를 생성 및 적용하여 그라우팅을 진행하며, 그라우팅을 진행하면서 인공지능 기반 제어 알고리즘으로 주입중단 조건을 확인하여, 주입중단 조건을 만족하면 그라우팅 주입을 중단하고, 그라우팅 주입이 종료된 현장의 지층정보와 그라우팅 시공결과 정보를 기초로 지층정보와 그라우팅 시공결과를 동시에 비교 및 분석할 수 있는 시공결과보고서를 생성하는 과정을 통해, 인공지능기반 스마트 그라우팅 시스템을 이용한 터널 강관다단 그라우팅 시공방법을 구현한다.
Tunnel steel pipe multi-stage grouting construction method using artificial intelligence-based smart grouting system
인공지능기반 스마트 그라우팅 시스템을 이용한 터널 강관다단 그라우팅 시공방법
KIM JIN CHUN (author) / KIM SEOK HYUN (author) / YOO BYUNG SUN (author)
2023-04-13
Patent
Electronic Resource
Korean
European Patent Office | 2023
|European Patent Office | 2023
|Steel pipe simultaneous injection grouting method for tunnel construction
European Patent Office | 2023
|