A platform for research: civil engineering, architecture and urbanism
Construction method of drainage system inspection system construction method
A method for constructing a building drainage facility inspection system is provided. The method for constructing a building drainage facility inspection system comprises: a step of loading drainage facilities onto a transport means; a step of transporting the drainage facilities to a construction site; and a step of installing the drainage facilities in the construction site. The drainage facility comprises: a floor part which has a plurality of installation holes arranged in a grid pattern and levels up; a plurality of hollow drainage members which are located inside the plurality of installation holes; a plurality of flexible members which connect the upper outer peripheries of the plurality of drainage members and the inner peripheries of the plurality of installation holes; embedded drainage pipes vertically spaced from the bottom of the floor part and installed in the ground surface to have a slope set to the bottom of the floor part; a plurality of bellows pipes which connect the bottom of the plurality of drainage members to the top of the inlet drainage pipe; and a plurality of support members which support the floor part and the underground surface, which is spaced apart from the bottom surface of the floor part and on which the embedded drainage pipe is supported. A composite unit (1) is installed in the construction site to perform target monitoring based on imaging the situation of the construction site and a target object. Therefore, the method for constructing a building drainage facility inspection system enables monitoring by transmitting relevant information to a detection means through drainage quantity detection.
건축물 배수설비 점검시스템 구축방법을 제공한다. 건축물 배수설비 점검시스템 구축방법는 배수설비가 이송수단에 적재되는 단계; 상기 배수설비가 건축공사현장으로 이송되는 단계; 및 상기 배수설비가 상기 건축공사현장에 설치되는 단계를 포함하되, 상기 배수설비는, 격자상으로 배치되는 다수의 설치홀이 형성되며, 수평을 이루는 바닥부; 상기 다수의 설치홀의 내측에 위치되는 중공 형상의 다수의 배수 부재; 상기 다수의 배수 부재의 상단측 외측 둘레와, 상기 다수의 설치홀의 내측 둘레를 연결하는 다수의 신축 부재; 상기 바닥부의 하부로부터 상하 간격을 이루며, 상기 바닥부의 하부에 설정된 경사를 이루도록 지중면에 설치되는 매입 배수관; 상기 다수의 배수 부재의 하단과, 상기 매입 배수관 상단을 연결하는 다수의 주름관; 상기 바닥부와, 상기 바닥부의 저면으로부터 이격되어, 상기 매입 배수관이 지지되는 지중면을 지지하는 다수의 지지 부재를 포함하며, 상기 건축공사현장에는 복합유닛(1)이 설치되어 상기 건축공사현장의 상황과 대상물 촬영에 기반하는 대상물 모니터링을 수행한다.
Construction method of drainage system inspection system construction method
A method for constructing a building drainage facility inspection system is provided. The method for constructing a building drainage facility inspection system comprises: a step of loading drainage facilities onto a transport means; a step of transporting the drainage facilities to a construction site; and a step of installing the drainage facilities in the construction site. The drainage facility comprises: a floor part which has a plurality of installation holes arranged in a grid pattern and levels up; a plurality of hollow drainage members which are located inside the plurality of installation holes; a plurality of flexible members which connect the upper outer peripheries of the plurality of drainage members and the inner peripheries of the plurality of installation holes; embedded drainage pipes vertically spaced from the bottom of the floor part and installed in the ground surface to have a slope set to the bottom of the floor part; a plurality of bellows pipes which connect the bottom of the plurality of drainage members to the top of the inlet drainage pipe; and a plurality of support members which support the floor part and the underground surface, which is spaced apart from the bottom surface of the floor part and on which the embedded drainage pipe is supported. A composite unit (1) is installed in the construction site to perform target monitoring based on imaging the situation of the construction site and a target object. Therefore, the method for constructing a building drainage facility inspection system enables monitoring by transmitting relevant information to a detection means through drainage quantity detection.
건축물 배수설비 점검시스템 구축방법을 제공한다. 건축물 배수설비 점검시스템 구축방법는 배수설비가 이송수단에 적재되는 단계; 상기 배수설비가 건축공사현장으로 이송되는 단계; 및 상기 배수설비가 상기 건축공사현장에 설치되는 단계를 포함하되, 상기 배수설비는, 격자상으로 배치되는 다수의 설치홀이 형성되며, 수평을 이루는 바닥부; 상기 다수의 설치홀의 내측에 위치되는 중공 형상의 다수의 배수 부재; 상기 다수의 배수 부재의 상단측 외측 둘레와, 상기 다수의 설치홀의 내측 둘레를 연결하는 다수의 신축 부재; 상기 바닥부의 하부로부터 상하 간격을 이루며, 상기 바닥부의 하부에 설정된 경사를 이루도록 지중면에 설치되는 매입 배수관; 상기 다수의 배수 부재의 하단과, 상기 매입 배수관 상단을 연결하는 다수의 주름관; 상기 바닥부와, 상기 바닥부의 저면으로부터 이격되어, 상기 매입 배수관이 지지되는 지중면을 지지하는 다수의 지지 부재를 포함하며, 상기 건축공사현장에는 복합유닛(1)이 설치되어 상기 건축공사현장의 상황과 대상물 촬영에 기반하는 대상물 모니터링을 수행한다.
Construction method of drainage system inspection system construction method
건축물 배수설비 점검시스템 구축방법
PARK JONG HWAN (author)
2023-06-28
Patent
Electronic Resource
Korean
IPC:
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
E03C
DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER
,
Hausinstallationen für Frisch- oder Abwasser
European Patent Office | 2022
|Composite drainage inspection well and construction method
European Patent Office | 2023
|Multifunctional drainage inspection well and construction method
European Patent Office | 2023
|Drainage pipeline concrete poured inspection well construction method
European Patent Office | 2016
|