Steel structure construction method that can shorten the construction period
Disclosed is a construction method for a steel structure, capable of shortening a construction period. The construction method for a steel structure can improve constructability of a steel structure by improving a connection structure of a pillar and a girder of the steel structure and shorten the construction period by enabling rapid construction. The construction method for a steel structure, capable of shortening a construction period, includes: a step of forming a reinforcing assembly by connecting a first reinforcing member, a second reinforcing member, and a third reinforcing member; a step of connecting the reinforcing assembly to a pillar and fixing the reinforcing assembly; a step of installing the pillars on the ground in which foundation construction is completed; a step of arranging a girder in the upper part of the reinforcing assemblies by lifting the girder; and a step of connecting both ends of the girder to the reinforcing assemblies by dropping the girder. A first connection unit is arranged at an end of the reinforcing assembly and formed in a multistage structure. A second connection unit is arranged at both ends of the girder and connected by being engaged with the first connection unit by being formed in the multistage structure corresponding to the first connection unit.
철골 구조물의 기둥과 거더의 결합구조를 개선하여 철골 구조물의 시공성을 향상하고, 나아가 신속한 시공이 가능하여 공기를 단축할 수 있는 공기 단축이 가능한 철골 구조물 시공 방법을 개시한다. 공기 단축이 가능한 철골 구조물 시공 방법은 제1 보강부재, 제2 보강부재 및 제3 보강부재를 결합하여 보강 조립체를 형성하는 단계, 보강 조립체를 기둥에 결합하여 고정하는 단계, 기초공사가 완료된 지면에 기둥들을 설치하는 단계, 거더를 인양하여 보강 조립체들의 상부에 거더를 배치하는 단계 및 거더를 하강시켜 거더의 양 단부를 보강 조립체들에 결합하는 단계를 포함하고, 보강 조립체의 단부에는 다단구조로 형성되는 제1 결합부가 배치되고, 거더의 양 단부에는 제1 결합부에 대응되는 다단구조로 형성되어 제1 결합부에 맞물려 결합되는 제2 결합부가 배치된다.
Steel structure construction method that can shorten the construction period
Disclosed is a construction method for a steel structure, capable of shortening a construction period. The construction method for a steel structure can improve constructability of a steel structure by improving a connection structure of a pillar and a girder of the steel structure and shorten the construction period by enabling rapid construction. The construction method for a steel structure, capable of shortening a construction period, includes: a step of forming a reinforcing assembly by connecting a first reinforcing member, a second reinforcing member, and a third reinforcing member; a step of connecting the reinforcing assembly to a pillar and fixing the reinforcing assembly; a step of installing the pillars on the ground in which foundation construction is completed; a step of arranging a girder in the upper part of the reinforcing assemblies by lifting the girder; and a step of connecting both ends of the girder to the reinforcing assemblies by dropping the girder. A first connection unit is arranged at an end of the reinforcing assembly and formed in a multistage structure. A second connection unit is arranged at both ends of the girder and connected by being engaged with the first connection unit by being formed in the multistage structure corresponding to the first connection unit.
철골 구조물의 기둥과 거더의 결합구조를 개선하여 철골 구조물의 시공성을 향상하고, 나아가 신속한 시공이 가능하여 공기를 단축할 수 있는 공기 단축이 가능한 철골 구조물 시공 방법을 개시한다. 공기 단축이 가능한 철골 구조물 시공 방법은 제1 보강부재, 제2 보강부재 및 제3 보강부재를 결합하여 보강 조립체를 형성하는 단계, 보강 조립체를 기둥에 결합하여 고정하는 단계, 기초공사가 완료된 지면에 기둥들을 설치하는 단계, 거더를 인양하여 보강 조립체들의 상부에 거더를 배치하는 단계 및 거더를 하강시켜 거더의 양 단부를 보강 조립체들에 결합하는 단계를 포함하고, 보강 조립체의 단부에는 다단구조로 형성되는 제1 결합부가 배치되고, 거더의 양 단부에는 제1 결합부에 대응되는 다단구조로 형성되어 제1 결합부에 맞물려 결합되는 제2 결합부가 배치된다.
Steel structure construction method that can shorten the construction period
공기 단축이 가능한 철골 구조물 시공 방법
KIM KEY SIC (author)
2023-07-06
Patent
Electronic Resource
Korean
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
VE to Shorten Construction Period
TIBKAT | 2015
|Construction method of floor tiles that can improve construction quality and shorten the period
European Patent Office | 2022
|European Patent Office | 2024
|An approach to shorten the construction period of high embankment on soft soil improved with PVD
Online Contents | 2009
|An approach to shorten the construction period of high embankment on soft soil improved with PVD
Online Contents | 2009
|