A platform for research: civil engineering, architecture and urbanism
Construction method of floor tiles that can improve construction quality and shorten the period
The present invention relates to a method for constructing floor tiles and, more specifically, to a tile construction method for building floors, which can simply construct tiles, which are continuously constructed up, down, left, and right on the bottom surface of a building, on the bottom surface by using remitar. The tile construction method for building floors comprises the steps of: fixing horizontal level points at regular intervals on a foundation floor; applying remitar between the horizontal level points to fix horizontal level lines; filling the entire foundation floor with dry-mixed remitar, based on the fixed horizontal level lines; curing the remitar after spraying water on the dry-mixed remitar; and applying a tile adhesive to the cured dry-mixed remitar. Therefore, the tile construction method can be simple and convenient, thereby reducing the construction period, easily and horizontally the tiles on the bottom surface of the building, and obtaining uniform construction quality.
본 발명은 바닥 타일 시공방법에 관한 것으로, 상세하게는, 레미탈(remitar)을 이용하여 간편하게 건축물 바닥면에 상하좌우로 연속적으로 시공되는 타일을 바닥면에 수평으로 시공할 수 있는 건축물 바닥용 타일 시공방법에 관한 것이다. 본 발명은 기초 바닥에 일정 간격으로 수평 레벨점을 고정하는 단계, 상기 수평 레벨점 사이에 레미탈을 도포하여 수평 레벨선을 고정하는 단계, 고정된 수평 레벨선을 기준으로 상기 기초 바닥의 전체에 건비빔된 레미탈을 채워 매립하는 단계, 상기 건비빔된 레미탈에 물을 분사한 후 양생하는 단계, 및 양생이 완료된 건비빔된 레미탈에 타일용 접착체를 도포하는 단계를 포함함으로써 시공이 간편하고 단순하여 시공 기간을 단축시킬 수 있을 뿐만 아니라, 건축물 바닥면에 타일을 간편하게 수평으로 시공하고, 균일한 시공 품질을 얻을 수 있다
Construction method of floor tiles that can improve construction quality and shorten the period
The present invention relates to a method for constructing floor tiles and, more specifically, to a tile construction method for building floors, which can simply construct tiles, which are continuously constructed up, down, left, and right on the bottom surface of a building, on the bottom surface by using remitar. The tile construction method for building floors comprises the steps of: fixing horizontal level points at regular intervals on a foundation floor; applying remitar between the horizontal level points to fix horizontal level lines; filling the entire foundation floor with dry-mixed remitar, based on the fixed horizontal level lines; curing the remitar after spraying water on the dry-mixed remitar; and applying a tile adhesive to the cured dry-mixed remitar. Therefore, the tile construction method can be simple and convenient, thereby reducing the construction period, easily and horizontally the tiles on the bottom surface of the building, and obtaining uniform construction quality.
본 발명은 바닥 타일 시공방법에 관한 것으로, 상세하게는, 레미탈(remitar)을 이용하여 간편하게 건축물 바닥면에 상하좌우로 연속적으로 시공되는 타일을 바닥면에 수평으로 시공할 수 있는 건축물 바닥용 타일 시공방법에 관한 것이다. 본 발명은 기초 바닥에 일정 간격으로 수평 레벨점을 고정하는 단계, 상기 수평 레벨점 사이에 레미탈을 도포하여 수평 레벨선을 고정하는 단계, 고정된 수평 레벨선을 기준으로 상기 기초 바닥의 전체에 건비빔된 레미탈을 채워 매립하는 단계, 상기 건비빔된 레미탈에 물을 분사한 후 양생하는 단계, 및 양생이 완료된 건비빔된 레미탈에 타일용 접착체를 도포하는 단계를 포함함으로써 시공이 간편하고 단순하여 시공 기간을 단축시킬 수 있을 뿐만 아니라, 건축물 바닥면에 타일을 간편하게 수평으로 시공하고, 균일한 시공 품질을 얻을 수 있다
Construction method of floor tiles that can improve construction quality and shorten the period
시공품질을 높이고 기간을 단축시킬수 있는 바닥 타일 시공방법
HA SANG UN (author)
2022-11-29
Patent
Electronic Resource
Korean
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Steel structure construction method that can shorten the construction period
European Patent Office | 2023
|VE to Shorten Construction Period
TIBKAT | 2015
|Construction method for building floor tiles using Remital
European Patent Office | 2022
|Laying construction method for building ground decorative floor tiles
European Patent Office | 2020
|European Patent Office | 2024
|