A platform for research: civil engineering, architecture and urbanism
Construction method of bridge drainage catchment box and bridge drainage catchment box
The present invention relates to a method for constructing a water collection hole for bridge drainage and a water collection hole for bridge drainage. An objective of the present invention is to collect water in the road surface of a bridge slab and guide and drain the collected water to a drain pipe connected beneath the bridge slab by being embedded in the bridge slab and collecting water in the road surface of the bridge slab, and to prevent concrete from penetrating the bridge slab during concrete pouring for the bridge slab. The method for constructing a water collection hole for bridge drainage according to the present invention comprises: a first step of installing a water collection hole (100) for bridge drainage, which includes a water collection part (11) provided at the upper side, a grating (20) combined with the water collection part, a drain pipe part (12) formed in a double pipe shape at the bottom of the water collection part, a connection pipe (30) connected to the bottom of the drainage pipe unit to be able to slide, and a cap (40) combined with the bottom of the drainage pipe unit to prevent concrete from penetrating into the drainage pipe unit and the connection pipe; a second step of constructing a bridge slab through pouring and curing of concrete in the mold; a third step of demolding the mold after the second step; a fourth step of opening the inside of the connection pipe by cutting the cap of the water collection hole for the bridge drainage; and a fifth step of connecting the drain pipe to the connection pipe after the connection pipe of the water collection hole for the bridge drainage is lowered beneath the drain pipe part through the fourth step.
본 발명은 교량 배수용 집수구의 시공 방법 및 교량 배수용 집수구에 관한 것으로, 교량 슬래브 안에 매립되어 교량 슬래브의 노면에 있는 물을 집수하여 교량 슬래브의 하부에서 연결되는 배수관으로 유도 배수하고, 교량 슬래브의 콘크리트 타설 시 콘크리트가 내부에 침투하는 것을 방지하는 것을 목적으로 한다. 본 발명에 의한 교량 배수용 집수구의 시공 방법은, 교량 슬래브(2)의 시공을 위한 거푸집(3)에, 상측의 집수부(11)와 상기 집수부에 결합되는 그레이팅(20)과 상기 집수부의 저부에 이중관 형태로 형성되는 배수관부(12)와 상기 배수관부의 내부에 저부로 슬라이딩 가능하게 연결되는 연결관(30) 및 상기 배수관부의 저부에 결합되어 콘크리트가 상기 배수관부와 연결관 안에 침투하지 않도록 하는 캡(40)을 포함하는 교량 배수용 집수구(100)를 설치하는 제1단계; 상기 거푸집에 콘크리트를 타설 및 양생을 거쳐 교량 슬래브를 시공하는 제2단계와; 상기 제2단계 이후 상기 거푸집을 탈형하는 제3단계와; 상기 교량 배수용 집수구의 캡을 커팅하여 상기 연결관의 내부를 개방하는 제4단계와; 상기 제4단계를 통해 저부가 개방된 교량 배수용 집수구의 연결관을 상기 배수관부의 아래로 하강시킨 후 상기 연결관에 배수관을 연결하는 제5단계를 포함한다.
Construction method of bridge drainage catchment box and bridge drainage catchment box
The present invention relates to a method for constructing a water collection hole for bridge drainage and a water collection hole for bridge drainage. An objective of the present invention is to collect water in the road surface of a bridge slab and guide and drain the collected water to a drain pipe connected beneath the bridge slab by being embedded in the bridge slab and collecting water in the road surface of the bridge slab, and to prevent concrete from penetrating the bridge slab during concrete pouring for the bridge slab. The method for constructing a water collection hole for bridge drainage according to the present invention comprises: a first step of installing a water collection hole (100) for bridge drainage, which includes a water collection part (11) provided at the upper side, a grating (20) combined with the water collection part, a drain pipe part (12) formed in a double pipe shape at the bottom of the water collection part, a connection pipe (30) connected to the bottom of the drainage pipe unit to be able to slide, and a cap (40) combined with the bottom of the drainage pipe unit to prevent concrete from penetrating into the drainage pipe unit and the connection pipe; a second step of constructing a bridge slab through pouring and curing of concrete in the mold; a third step of demolding the mold after the second step; a fourth step of opening the inside of the connection pipe by cutting the cap of the water collection hole for the bridge drainage; and a fifth step of connecting the drain pipe to the connection pipe after the connection pipe of the water collection hole for the bridge drainage is lowered beneath the drain pipe part through the fourth step.
본 발명은 교량 배수용 집수구의 시공 방법 및 교량 배수용 집수구에 관한 것으로, 교량 슬래브 안에 매립되어 교량 슬래브의 노면에 있는 물을 집수하여 교량 슬래브의 하부에서 연결되는 배수관으로 유도 배수하고, 교량 슬래브의 콘크리트 타설 시 콘크리트가 내부에 침투하는 것을 방지하는 것을 목적으로 한다. 본 발명에 의한 교량 배수용 집수구의 시공 방법은, 교량 슬래브(2)의 시공을 위한 거푸집(3)에, 상측의 집수부(11)와 상기 집수부에 결합되는 그레이팅(20)과 상기 집수부의 저부에 이중관 형태로 형성되는 배수관부(12)와 상기 배수관부의 내부에 저부로 슬라이딩 가능하게 연결되는 연결관(30) 및 상기 배수관부의 저부에 결합되어 콘크리트가 상기 배수관부와 연결관 안에 침투하지 않도록 하는 캡(40)을 포함하는 교량 배수용 집수구(100)를 설치하는 제1단계; 상기 거푸집에 콘크리트를 타설 및 양생을 거쳐 교량 슬래브를 시공하는 제2단계와; 상기 제2단계 이후 상기 거푸집을 탈형하는 제3단계와; 상기 교량 배수용 집수구의 캡을 커팅하여 상기 연결관의 내부를 개방하는 제4단계와; 상기 제4단계를 통해 저부가 개방된 교량 배수용 집수구의 연결관을 상기 배수관부의 아래로 하강시킨 후 상기 연결관에 배수관을 연결하는 제5단계를 포함한다.
Construction method of bridge drainage catchment box and bridge drainage catchment box
교량 배수용 집수구의 시공 방법 및 교량 배수용 집수구
YUN JONG HEE (author) / JO HYUN MO (author)
2023-12-05
Patent
Electronic Resource
Korean
Bridge Drainage Facility Catchment Upper Connection Type Construction Method
European Patent Office | 2024
|