A platform for research: civil engineering, architecture and urbanism
Bridge Deck Replacement Construction Method
The present invention relates to a method for replacing and constructing a deck of a bridge, capable of increasing structural safety of a joint part between decks, improving resistance against slip shearing of a deck and a girder, preventing damage such as a crack in placed concrete, and enabling easy and quick construction through an improvement in constructability. To achieve the purpose, in accordance with the present invention, the method for replacing and constructing a deck of a bridge comprises: a deck dismantling step; a residual concrete removal step; a shear connecting material installation step; a deck reinstallation step; a deck joint connection step; a concrete placing and curing step; a waterproofing construction step; and a pavement construction step, wherein the shear connecting material in the shear connecting material installation step is made of mold steel having a predetermined length in a vertical direction, wherein the shear connecting material is installed vertically in an upper part of the girder part and then, fixed through welding.
본 발명은 바닥판 사이의 이음부의 구조적 안전성을 높일 수 있고, 바닥판과 거더의 미끄럼 전단에 저항력을 향상시킬 수 있으며, 타설된 콘크리트의 균열 등의 파손을 방지할 수 있고, 시공성이 향상되어 쉽고 빠르게 시공이 가능한 교량의 바닥판 교체 시공방법에 관한 것이다. 상기의 과제를 해결하기 위한 본 발명에 따른 교량의 바닥판 교체 시공방법은, 바닥판 해체 단계; 잔존콘크리트 제거 단계; 전단연결재 설치 단계; 바닥판 재설치 단계; 바닥판 이음부 연결 단계; 콘크리트 타설 및 양생 단계; 방수 시공 단계; 및 포장 시공 단계로 이루어지고, 상기 전단연결재 설치 단계의 상기 전단연결재는, 수직 방향으로 소정 길이를 가지는 형강으로 이루어지고, 상기 전단연결재는, 상기 거더부의 상부에 수직으로 설치된 다음, 용접을 통해 고정되는 것을 특징으로 한다.
Bridge Deck Replacement Construction Method
The present invention relates to a method for replacing and constructing a deck of a bridge, capable of increasing structural safety of a joint part between decks, improving resistance against slip shearing of a deck and a girder, preventing damage such as a crack in placed concrete, and enabling easy and quick construction through an improvement in constructability. To achieve the purpose, in accordance with the present invention, the method for replacing and constructing a deck of a bridge comprises: a deck dismantling step; a residual concrete removal step; a shear connecting material installation step; a deck reinstallation step; a deck joint connection step; a concrete placing and curing step; a waterproofing construction step; and a pavement construction step, wherein the shear connecting material in the shear connecting material installation step is made of mold steel having a predetermined length in a vertical direction, wherein the shear connecting material is installed vertically in an upper part of the girder part and then, fixed through welding.
본 발명은 바닥판 사이의 이음부의 구조적 안전성을 높일 수 있고, 바닥판과 거더의 미끄럼 전단에 저항력을 향상시킬 수 있으며, 타설된 콘크리트의 균열 등의 파손을 방지할 수 있고, 시공성이 향상되어 쉽고 빠르게 시공이 가능한 교량의 바닥판 교체 시공방법에 관한 것이다. 상기의 과제를 해결하기 위한 본 발명에 따른 교량의 바닥판 교체 시공방법은, 바닥판 해체 단계; 잔존콘크리트 제거 단계; 전단연결재 설치 단계; 바닥판 재설치 단계; 바닥판 이음부 연결 단계; 콘크리트 타설 및 양생 단계; 방수 시공 단계; 및 포장 시공 단계로 이루어지고, 상기 전단연결재 설치 단계의 상기 전단연결재는, 수직 방향으로 소정 길이를 가지는 형강으로 이루어지고, 상기 전단연결재는, 상기 거더부의 상부에 수직으로 설치된 다음, 용접을 통해 고정되는 것을 특징으로 한다.
Bridge Deck Replacement Construction Method
교량의 바닥판 교체 시공방법
KIM SEONG HYEOK (author) / PARK MI SUK (author)
2023-12-27
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Bridge deck replacement with lightweight exodermic bridge deck panels
British Library Conference Proceedings | 2000
|Construction method of bridge deck slab, bridge deck slab and bridge
European Patent Office | 2022
|CONSTRUCTION METHOD OF BRIDGE DECK SLAB ASSEMBLY FOR BRIDGE DECK SLAB AND BRIDGE DECK SLAB
European Patent Office | 2018
|BRIDGE DECK WATERPROOFING STRUCTURE AND BRIDGE DECK WATERPROOFING CONSTRUCTION METHOD
European Patent Office | 2024
|