A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD OF BRIDGE DECK SLAB ASSEMBLY FOR BRIDGE DECK SLAB AND BRIDGE DECK SLAB
Disclosed is a construction method of a bridge deck. The construction method of a bridge deck comprises: (a) a step of preparing an assembly set including at least one assembly including a base plate, a plurality of bar members arranged on the base plate, and a plurality of upper portion main reinforcement bars; (b) a step of installing the assembly set on a bridge girder; and (c) a step of placing concrete in the base plate of the assembly, wherein the bar members are fixedly arranged with respect to the base plate with a space from each other along a longitudinal direction of the bridge while each of the bar members are alternatively bent in the vertical direction and are extended to a transverse direction of the bridge. The upper portion main reinforcement bar is arranged on the top of the bar member so as to have the longitudinal direction thereof face the transverse direction of the bridge.
교량 바닥판 시공 방법이 개시되며, 상기 교량 바닥판 시공 방법은 (a) 베이스 플레이트, 상기 베이스 플레이트 상에 배치되는 복수의 바 부재 및 복수의 상부 주철근을 포함하는 조립체를 하나 이상 포함하는 조립체 셋트를 준비하는 단계; (b) 상기 조립체 셋트를 교량 거더 상에 설치하는 단계; 및 (c) 상기 조립체의 베이스 플레이트 상에 콘크리트를 타설하는 단계를 포함하되, 상기 복수의 바 부재는, 교량의 종 방향을 따라 상호 간격을 두고 상기 베이스 플레이트에 대하여 고정적으로 배치되되, 그 각각이 위아래로 교번하여 절곡되면서 교량의 횡 방향으로 연장되고, 상기 상부 주철근은 그 길이 방향이 교량의 횡 방향을 향하도록 상기 바 부재의 상부에 배치된다.
CONSTRUCTION METHOD OF BRIDGE DECK SLAB ASSEMBLY FOR BRIDGE DECK SLAB AND BRIDGE DECK SLAB
Disclosed is a construction method of a bridge deck. The construction method of a bridge deck comprises: (a) a step of preparing an assembly set including at least one assembly including a base plate, a plurality of bar members arranged on the base plate, and a plurality of upper portion main reinforcement bars; (b) a step of installing the assembly set on a bridge girder; and (c) a step of placing concrete in the base plate of the assembly, wherein the bar members are fixedly arranged with respect to the base plate with a space from each other along a longitudinal direction of the bridge while each of the bar members are alternatively bent in the vertical direction and are extended to a transverse direction of the bridge. The upper portion main reinforcement bar is arranged on the top of the bar member so as to have the longitudinal direction thereof face the transverse direction of the bridge.
교량 바닥판 시공 방법이 개시되며, 상기 교량 바닥판 시공 방법은 (a) 베이스 플레이트, 상기 베이스 플레이트 상에 배치되는 복수의 바 부재 및 복수의 상부 주철근을 포함하는 조립체를 하나 이상 포함하는 조립체 셋트를 준비하는 단계; (b) 상기 조립체 셋트를 교량 거더 상에 설치하는 단계; 및 (c) 상기 조립체의 베이스 플레이트 상에 콘크리트를 타설하는 단계를 포함하되, 상기 복수의 바 부재는, 교량의 종 방향을 따라 상호 간격을 두고 상기 베이스 플레이트에 대하여 고정적으로 배치되되, 그 각각이 위아래로 교번하여 절곡되면서 교량의 횡 방향으로 연장되고, 상기 상부 주철근은 그 길이 방향이 교량의 횡 방향을 향하도록 상기 바 부재의 상부에 배치된다.
CONSTRUCTION METHOD OF BRIDGE DECK SLAB ASSEMBLY FOR BRIDGE DECK SLAB AND BRIDGE DECK SLAB
교량 바닥판 시공 방법, 교량 바닥판에 적용되는 조립체 및 교량 바닥판
KO YOUNG TAE (author) / LEE GI CHEON (author)
2018-09-14
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Construction method of bridge deck slab, bridge deck slab and bridge
European Patent Office | 2022
|Bridge deck slab pre-tightening system and bridge deck slab pre-tightening construction method
European Patent Office | 2023
|European Patent Office | 2023
|