METHOD OF REPLACING BRIDGE DECK SLAB AND PRESTRESSED CONCRETE GIRDER ASSEMBLY USED THEREIN
The present invention relates to a method to replace an existing deck slab of a bridge including the existing deck slab, while re-using an existing first support girder and an existing second support girder mounted in a pier to be arranged in a longitudinal direction, comprising: an existing deck slab removing step of separating and removing the existing deck slab from the first support girder and the second support girder; a connection concrete forming step of filling an empty space between the first support girder and the second support girder with cast-in-place concrete to form connection concrete; a second tendon installing step of installing a second tendon connecting the first support girder and the second support girder on a rafter of a neutral axis of the first support girder and the second support girder; a first prestressing step of introducing compressed prestressing to the rafter of the neutral axis of the first support girder and the second support girder above the pier by tensioning some of the second tendons; and a new deck slab installing step of installing a new deck slab above the first support girder and the second support girder after the first prestressing step. Moment acting on a span central portion and a continuous point portion is distributed to induce balancing, thereby enabling use of the previously installed existing support girder without separate performance improvement.
본 발명은 교각에 교축 방향으로 배열되게 거치된 기존의 제1지지거더와 기존의 제2지지거더를 재사용하면서 이들의 상측에 기존 바닥판이 구비된 교량의 기존 바닥판의 교체 방법으로서, 기존 바닥판을 상기 제1지지거더와 상기 제2지지거더로부터 분리 제거하는 기존바닥판 제거단계와; 상기 제1지지거더와 상기 제2지지거더의 사이의 빈 공간에 현장타설 콘크리트로 채워 연결콘크리트를 형성하는 연결콘크리트 형성단계와; 상기 제1지지거더와 상기 제2지지거더를 연결하는 제2긴장재를 상기 제1지지거더와 상기 제2지지거더의 중립축 상연에 설치하는 제2긴장재 설치단계와; 상기 제2긴장재 중 일부 이상을 긴장하여 상기 교각 상측의 상기 제1지지거더와 상기 제2지지거더의 중립축 상연에 압축 프리스트레스를 도입하는 제1프리스트레스 도입단계와; 상기 제1프리스트레스 도입단계 이후에, 상기 제1지지거더와 상기 제2지지거더의 상측에 신설 바닥판을 설치하는 신설바닥판 설치단계를; 포함하여 구성되어, 지간중앙부와 연속지점부에 작용하는 모멘트가 분산되어 균형을 유지하게 유도하여, 기존 기 설치된 지지 거더를 별도의 성능개선 없이 사용할 수 있게 하는 교량의 기존 바닥판의 교체 방법을 제공한다.
METHOD OF REPLACING BRIDGE DECK SLAB AND PRESTRESSED CONCRETE GIRDER ASSEMBLY USED THEREIN
The present invention relates to a method to replace an existing deck slab of a bridge including the existing deck slab, while re-using an existing first support girder and an existing second support girder mounted in a pier to be arranged in a longitudinal direction, comprising: an existing deck slab removing step of separating and removing the existing deck slab from the first support girder and the second support girder; a connection concrete forming step of filling an empty space between the first support girder and the second support girder with cast-in-place concrete to form connection concrete; a second tendon installing step of installing a second tendon connecting the first support girder and the second support girder on a rafter of a neutral axis of the first support girder and the second support girder; a first prestressing step of introducing compressed prestressing to the rafter of the neutral axis of the first support girder and the second support girder above the pier by tensioning some of the second tendons; and a new deck slab installing step of installing a new deck slab above the first support girder and the second support girder after the first prestressing step. Moment acting on a span central portion and a continuous point portion is distributed to induce balancing, thereby enabling use of the previously installed existing support girder without separate performance improvement.
본 발명은 교각에 교축 방향으로 배열되게 거치된 기존의 제1지지거더와 기존의 제2지지거더를 재사용하면서 이들의 상측에 기존 바닥판이 구비된 교량의 기존 바닥판의 교체 방법으로서, 기존 바닥판을 상기 제1지지거더와 상기 제2지지거더로부터 분리 제거하는 기존바닥판 제거단계와; 상기 제1지지거더와 상기 제2지지거더의 사이의 빈 공간에 현장타설 콘크리트로 채워 연결콘크리트를 형성하는 연결콘크리트 형성단계와; 상기 제1지지거더와 상기 제2지지거더를 연결하는 제2긴장재를 상기 제1지지거더와 상기 제2지지거더의 중립축 상연에 설치하는 제2긴장재 설치단계와; 상기 제2긴장재 중 일부 이상을 긴장하여 상기 교각 상측의 상기 제1지지거더와 상기 제2지지거더의 중립축 상연에 압축 프리스트레스를 도입하는 제1프리스트레스 도입단계와; 상기 제1프리스트레스 도입단계 이후에, 상기 제1지지거더와 상기 제2지지거더의 상측에 신설 바닥판을 설치하는 신설바닥판 설치단계를; 포함하여 구성되어, 지간중앙부와 연속지점부에 작용하는 모멘트가 분산되어 균형을 유지하게 유도하여, 기존 기 설치된 지지 거더를 별도의 성능개선 없이 사용할 수 있게 하는 교량의 기존 바닥판의 교체 방법을 제공한다.
METHOD OF REPLACING BRIDGE DECK SLAB AND PRESTRESSED CONCRETE GIRDER ASSEMBLY USED THEREIN
교량 바닥판의 교체 방법 및 이에 사용되는 프리스트레스트 콘크리트 거더 조립체
JANG SHIN CHAN (author)
2016-10-06
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
British Library Conference Proceedings | 2002
|Concrete deck for girder bridge using prestressed force and band stirrups
European Patent Office | 2018
Prestressed box girder deck for B.C. suspension bridge
Engineering Index Backfile | 1964
|CONCRETE DECK FOR GIRDER BRIDGE USING PRESTRESSED FORCE AND BAND STIRRUPS
European Patent Office | 2016
|