A platform for research: civil engineering, architecture and urbanism
I .TEMPORARY PRESTRESS DECK FOR STEEL BRIDGE
According to the present invention, a bridge constructing method includes: an I-bar girder placement step of placing an I-bar girder (300) in a bridge stand or bridge; a step preparation step of preparing a deck (100) manufactured in a rebar concrete structure; a deck installation step of installing the deck (100) in the lower part of the I-bar girder (300) to apply a pre-compression load to the I-bar girder (300); a mold installation step of installing a mold (A) for the installation of a floor panel (1) by using the deck (100) as a worktable; a concrete placement and curing step of placing and curing concrete in the mold (A) to form the floor panel (1); and a deck removal step of removing the deck (100) to apply upward force to the bridge. According to the present invention, the method is capable of applying a load with upward force to an upper structure, combined with the I-bar girder and the floor panel, without an extra hydraulic device or generating device. Moreover, the method is capable of preventing accidents in a field as well as enabling stable high place work.
본 발명에 따른 교량의 시공방법은 교대 또는 교각에 상기 I형 강재거더(300)를 거치하는 I형 강재거더 거치단계; 철근콘크리트 구조로 제작된 데크(100)를 준비하는 데크준비단계; 상기 I형 강재거더(300)에 선행하중이 작용하도록 상기 I형 강재거더(300)의 하부에 상기 데크(100)를 설치하는 데크설치단계; 상기 데크(100)를 작업대로 이용하여 상기 바닥판(1)의 설치를 위한 거푸집(A)을 설치하는 거푸집 설치단계; 상기 거푸집(A)에 콘크리트를 타설하고 양생하여 상기 바닥판(1)을 형성하는 콘크리트 타설 및 양생단계; 및 상기 데크(100)를 제거하여 상기 교량에 상향력을 도입하는 데크제거단계;를 포함하는 것을 특징으로 하는 교량의 시공방법을 제시한다. 본 발명에 따르면 별도의 유압장치나 발전장치 없이 I형 강재거더와 바닥판이 합성된 상부구조물에 상향력의 하중을 도입할 수 있다. 또한, 본 발명의 시공방법을 이용하여 안정적인 고공작업을 수행함은 물론 현장에서의 안전사고를 예방할 수 있다.
I .TEMPORARY PRESTRESS DECK FOR STEEL BRIDGE
According to the present invention, a bridge constructing method includes: an I-bar girder placement step of placing an I-bar girder (300) in a bridge stand or bridge; a step preparation step of preparing a deck (100) manufactured in a rebar concrete structure; a deck installation step of installing the deck (100) in the lower part of the I-bar girder (300) to apply a pre-compression load to the I-bar girder (300); a mold installation step of installing a mold (A) for the installation of a floor panel (1) by using the deck (100) as a worktable; a concrete placement and curing step of placing and curing concrete in the mold (A) to form the floor panel (1); and a deck removal step of removing the deck (100) to apply upward force to the bridge. According to the present invention, the method is capable of applying a load with upward force to an upper structure, combined with the I-bar girder and the floor panel, without an extra hydraulic device or generating device. Moreover, the method is capable of preventing accidents in a field as well as enabling stable high place work.
본 발명에 따른 교량의 시공방법은 교대 또는 교각에 상기 I형 강재거더(300)를 거치하는 I형 강재거더 거치단계; 철근콘크리트 구조로 제작된 데크(100)를 준비하는 데크준비단계; 상기 I형 강재거더(300)에 선행하중이 작용하도록 상기 I형 강재거더(300)의 하부에 상기 데크(100)를 설치하는 데크설치단계; 상기 데크(100)를 작업대로 이용하여 상기 바닥판(1)의 설치를 위한 거푸집(A)을 설치하는 거푸집 설치단계; 상기 거푸집(A)에 콘크리트를 타설하고 양생하여 상기 바닥판(1)을 형성하는 콘크리트 타설 및 양생단계; 및 상기 데크(100)를 제거하여 상기 교량에 상향력을 도입하는 데크제거단계;를 포함하는 것을 특징으로 하는 교량의 시공방법을 제시한다. 본 발명에 따르면 별도의 유압장치나 발전장치 없이 I형 강재거더와 바닥판이 합성된 상부구조물에 상향력의 하중을 도입할 수 있다. 또한, 본 발명의 시공방법을 이용하여 안정적인 고공작업을 수행함은 물론 현장에서의 안전사고를 예방할 수 있다.
I .TEMPORARY PRESTRESS DECK FOR STEEL BRIDGE
공장 제작된 콘크리트 데크를 이용한 I형 강재거더 교량의 시공방법.
JEONG HAE YOUNG (author)
2017-01-25
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2015
|Prefabricated transverse prestress bridge deck slab and bridge
European Patent Office | 2020
|