Cable-Stayed Bridge having Precast Core and Constructing Method thereof
The present invention relates to a cable-stayed bridge having an upper structure using a precast core and a constructing method thereof which use a precast core as a portion of a girder to support a diagonal cable to prevent excessive stress in a segment and a form traveler (F/T) which are previously installed when using the F/T to sequentially and continuously make the segment consisting of the girder and a bottom plate by concrete poured on a site to construct an upper structure to construct a cable-stayed bridge. The constructing method of a cable-stayed bridge constructs a cable-stayed bridge by constructing an upper structure by a method comprising: a process of installing an F/T in front of a preceding segment to allow the F/T to protrude; a process of recovering a precast core and installing the precast core to tightly attach the precast core to a front surface of a girder of the preceding segment; a process of temporarily integrating and coupling the F/T and the precast core; a process of coupling a diagonal cable and the precast core and introducing a first tensile force by the diagonal cable; a process of constructing a new segment by concrete poured on a site and the precast core; a process of introducing a support tensile force of the new segment by additional second tension of the diagonal cable; and a process of releasing the F/T and the precast core from temporary coupling.
본 발명은 폼 트래블러(F/T)를 이용하여, 거더와 바닥판으로 이루어진 세그먼트(segment)를 현장타설 콘크리트에 의해 순차적으로 연속 제작하여 상부구조물을 구축함으로써 사장교를 시공함에 있어서, 프리캐스트 코어(Precast Core)를 거더의 일부분으로 이용하여 사재(斜材) 케이블로 지지하는 구성을 통하여, 이미 설치되어 있는 세그먼트와 F/T에 과도한 응력이 발생하는 것을 방지할 수 있게 되는 "프리캐스트 코어를 이용한 상부구조물을 가지는 사장교 및 그 시공방법"에 관한 것이다. 본 발명에서는 선행 세그먼트의 전방에 F/T를 돌출 설치; 프리캐스트 코어의 인양 및 선행 세그먼트의 거더 전방면 밀착 설치; F/T와 프리캐스트 코어의 임시 일체 결합; 사재 케이블과 프리캐스트 코어의 결합 및 사재 케이블에 의한 1차 긴장력 도입; 현장 타설 콘크리트와 프리캐스트 코어에 의한 신규 세그먼트 구축; 사재 케이블의 추가적인 2차 긴장에 의한 신규 세그먼트의 지지 긴장력 도입; 및 F/T와 프리캐스트 코어의 임시 결합 해제의 과정을 포함하는 방법에 의해 상부구조물을 구축하여 사장교를 시공하는 방법과, 이에 의해 시공된 사장교가 제공된다.
Cable-Stayed Bridge having Precast Core and Constructing Method thereof
The present invention relates to a cable-stayed bridge having an upper structure using a precast core and a constructing method thereof which use a precast core as a portion of a girder to support a diagonal cable to prevent excessive stress in a segment and a form traveler (F/T) which are previously installed when using the F/T to sequentially and continuously make the segment consisting of the girder and a bottom plate by concrete poured on a site to construct an upper structure to construct a cable-stayed bridge. The constructing method of a cable-stayed bridge constructs a cable-stayed bridge by constructing an upper structure by a method comprising: a process of installing an F/T in front of a preceding segment to allow the F/T to protrude; a process of recovering a precast core and installing the precast core to tightly attach the precast core to a front surface of a girder of the preceding segment; a process of temporarily integrating and coupling the F/T and the precast core; a process of coupling a diagonal cable and the precast core and introducing a first tensile force by the diagonal cable; a process of constructing a new segment by concrete poured on a site and the precast core; a process of introducing a support tensile force of the new segment by additional second tension of the diagonal cable; and a process of releasing the F/T and the precast core from temporary coupling.
본 발명은 폼 트래블러(F/T)를 이용하여, 거더와 바닥판으로 이루어진 세그먼트(segment)를 현장타설 콘크리트에 의해 순차적으로 연속 제작하여 상부구조물을 구축함으로써 사장교를 시공함에 있어서, 프리캐스트 코어(Precast Core)를 거더의 일부분으로 이용하여 사재(斜材) 케이블로 지지하는 구성을 통하여, 이미 설치되어 있는 세그먼트와 F/T에 과도한 응력이 발생하는 것을 방지할 수 있게 되는 "프리캐스트 코어를 이용한 상부구조물을 가지는 사장교 및 그 시공방법"에 관한 것이다. 본 발명에서는 선행 세그먼트의 전방에 F/T를 돌출 설치; 프리캐스트 코어의 인양 및 선행 세그먼트의 거더 전방면 밀착 설치; F/T와 프리캐스트 코어의 임시 일체 결합; 사재 케이블과 프리캐스트 코어의 결합 및 사재 케이블에 의한 1차 긴장력 도입; 현장 타설 콘크리트와 프리캐스트 코어에 의한 신규 세그먼트 구축; 사재 케이블의 추가적인 2차 긴장에 의한 신규 세그먼트의 지지 긴장력 도입; 및 F/T와 프리캐스트 코어의 임시 결합 해제의 과정을 포함하는 방법에 의해 상부구조물을 구축하여 사장교를 시공하는 방법과, 이에 의해 시공된 사장교가 제공된다.
Cable-Stayed Bridge having Precast Core and Constructing Method thereof
프리캐스트 코어를 이용한 상부구조물을 가지는 사장교의 시공방법 및 그에 의해 시공되는 사장교
CHUN SUNG BUM (author) / YOON JAH GEOL (author) / PARK TAE KWUN (author) / KWON HYO CHAN (author) / KWAK JI HYUN (author)
2017-02-08
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Cable-Stayed Bridge having Precast Core and Constructing Method thereof
European Patent Office | 2018
CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
European Patent Office | 2020
|Method for constructing superstructure of composite beam cable-stayed bridge
European Patent Office | 2021
|Cable-stayed bridge cable beam anchoring structure and cable-stayed bridge
European Patent Office | 2020
|