A platform for research: civil engineering, architecture and urbanism
METHOD OF MANUFACTURING BRIDGE GIRDER AND TENSIONING APPARATUS USED THEREIN
The present invention relates to a method to manufacture a bridge girder and a device to apply tensile force to the girder. The method includes: a tendon installation step of installing at least two tendons including a first tendon inserted into a sheath tube around a transverse neutral axis from the center of a span of a girder, and a second tendon inserted into the other sheath tube around the transverse neutral axis from the center of the span of the girder; and a tensile force applying step of performing settlement after applying first tensile force to the fist tendon and applying second tensile force to the second tendon at the same time. As the first tensile force and the second tensile force are applied at the same time to the first and second tendons placed at a distance from each other around the transverse neutral axis from the center of the span of the girder, the present invention is capable of accurately applying fixed tensile force while suppressing the transverse displacement of the girder.
본 발명은 교량용 거더의 제작 방법 및 이에 사용되는 거더의 긴장력 도입 장치에 관한 것으로, 거더의 경간 중앙부에서 횡방향 중립축을 기준으로 일측의 쉬스관에 삽입 배치된 제1긴장재와, 상기 거더의 경간 중앙부에서 상기 횡방향 중립축을 기준으로 타측의 쉬스관에 삽입 배치된 제2긴장재를 포함하는 2개 이상의 긴장재를 설치하는 긴장재 설치단계와; 상기 제1긴장재에 제1긴장력을 도입하는 것과, 상기 제2긴장재에 제2긴장력을 도입하는 것을 동시에 행한 후 정착하는 긴장력 도입단계를; 포함하여 구성되어, 거더의 경간 중앙부에서 횡방향 중립축을 기준으로 이격 배치된 제1긴장재와 제2긴장재에 제1긴장력과 제2긴장력을 동시에 도입함으로써, 거더의 횡방향 변위의 발생을 억제하면서 정해진 긴장력을 정확하게 도입할 수 있는 교량용 거더의 제작 방법 및 이에 사용되는 거더의 긴장력 도입 장치를 제공한다.
METHOD OF MANUFACTURING BRIDGE GIRDER AND TENSIONING APPARATUS USED THEREIN
The present invention relates to a method to manufacture a bridge girder and a device to apply tensile force to the girder. The method includes: a tendon installation step of installing at least two tendons including a first tendon inserted into a sheath tube around a transverse neutral axis from the center of a span of a girder, and a second tendon inserted into the other sheath tube around the transverse neutral axis from the center of the span of the girder; and a tensile force applying step of performing settlement after applying first tensile force to the fist tendon and applying second tensile force to the second tendon at the same time. As the first tensile force and the second tensile force are applied at the same time to the first and second tendons placed at a distance from each other around the transverse neutral axis from the center of the span of the girder, the present invention is capable of accurately applying fixed tensile force while suppressing the transverse displacement of the girder.
본 발명은 교량용 거더의 제작 방법 및 이에 사용되는 거더의 긴장력 도입 장치에 관한 것으로, 거더의 경간 중앙부에서 횡방향 중립축을 기준으로 일측의 쉬스관에 삽입 배치된 제1긴장재와, 상기 거더의 경간 중앙부에서 상기 횡방향 중립축을 기준으로 타측의 쉬스관에 삽입 배치된 제2긴장재를 포함하는 2개 이상의 긴장재를 설치하는 긴장재 설치단계와; 상기 제1긴장재에 제1긴장력을 도입하는 것과, 상기 제2긴장재에 제2긴장력을 도입하는 것을 동시에 행한 후 정착하는 긴장력 도입단계를; 포함하여 구성되어, 거더의 경간 중앙부에서 횡방향 중립축을 기준으로 이격 배치된 제1긴장재와 제2긴장재에 제1긴장력과 제2긴장력을 동시에 도입함으로써, 거더의 횡방향 변위의 발생을 억제하면서 정해진 긴장력을 정확하게 도입할 수 있는 교량용 거더의 제작 방법 및 이에 사용되는 거더의 긴장력 도입 장치를 제공한다.
METHOD OF MANUFACTURING BRIDGE GIRDER AND TENSIONING APPARATUS USED THEREIN
교량용 거더의 제작 방법 및 이에 사용되는 거더의 긴장력 도입 장치
PARK YOUNG HA (author) / PARR KI WON (author)
2017-03-16
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
METHOD OF MANUFACTURING BRIDGE GIRDER AND TENSIONING APPARATUS USED THEREIN
European Patent Office | 2017
Post-tensioning prestress construction method for bridge box girder
European Patent Office | 2023
|UPPER STRUCTURE OF ECO BRIDGE AND METHOD OF FORMING GIRDER USED THEREIN
European Patent Office | 2016
|2 APPARATUS AND METHOD FOR STRENGTHENING OF GIRDER BRIDGE BY SECONDARY POST-TENSIONING
European Patent Office | 2020
|METHOD OF REPLACING BRIDGE DECK SLAB AND PRESTRESSED CONCRETE GIRDER ASSEMBLY USED THEREIN
European Patent Office | 2016
|