A platform for research: civil engineering, architecture and urbanism
The present invention provides a method for constructing an existing tile floor. According to the present invention, the method for constructing an existing tile floor comprises: a tile floor arranging step (100) comprising a protrusion arranging step (110), a ponding state checking and treating step (120), and a stepped part checking step (130); a tile floor flattening step (200) comprising a gap sealing step (210) and a floor grinding step (220); a tile floor designing step (300) comprising a floor pretreating step (310) and a floor decorating step (320); and a tile floor finishing step (400) comprising a fixation step (410) and a coating step (420). The method for constructing an existing tile floor can reduce construction waste and can provide the floor visually excellent. The method for constructing an existing tile floor can remarkably reduce usage of water and can be environmentally friendly. Moreover, the method for constructing an existing tile floor can improve durability.
본 발명은 기존 타일바닥을 재시공하기 위한 방법을 제시하는 것으로서, 돌출부분 정리단계(110), 물고임 상태 확인 후 조치단계(120) 및 단차 부분 확인 단계(130)로 구성된 타일바닥 정리단계(100); 공백실링단계(210) 및 바닥연마단계(220)로 구성된 타일바닥 평탄화단계(200); 바닥의 전처리 단계(310) 및 바닥의 장식화 단계(320)로 구성된 타일바닥 도안화단계(300); 고착화 단계(410) 및 코팅 단계(420)로 구성된 타일바닥 마감단계(400); 로 구성되며, 건설폐기물이 감소, 시각적으로도 뛰어난 바닥을 제공할 수 있으며, 물의 사용량이 현저히 감소하게 되며, 환경친화적이 되며, 내구성이 더 향상되는 장점을 갖는 타일 시공방법에 관한 것이다.
The present invention provides a method for constructing an existing tile floor. According to the present invention, the method for constructing an existing tile floor comprises: a tile floor arranging step (100) comprising a protrusion arranging step (110), a ponding state checking and treating step (120), and a stepped part checking step (130); a tile floor flattening step (200) comprising a gap sealing step (210) and a floor grinding step (220); a tile floor designing step (300) comprising a floor pretreating step (310) and a floor decorating step (320); and a tile floor finishing step (400) comprising a fixation step (410) and a coating step (420). The method for constructing an existing tile floor can reduce construction waste and can provide the floor visually excellent. The method for constructing an existing tile floor can remarkably reduce usage of water and can be environmentally friendly. Moreover, the method for constructing an existing tile floor can improve durability.
본 발명은 기존 타일바닥을 재시공하기 위한 방법을 제시하는 것으로서, 돌출부분 정리단계(110), 물고임 상태 확인 후 조치단계(120) 및 단차 부분 확인 단계(130)로 구성된 타일바닥 정리단계(100); 공백실링단계(210) 및 바닥연마단계(220)로 구성된 타일바닥 평탄화단계(200); 바닥의 전처리 단계(310) 및 바닥의 장식화 단계(320)로 구성된 타일바닥 도안화단계(300); 고착화 단계(410) 및 코팅 단계(420)로 구성된 타일바닥 마감단계(400); 로 구성되며, 건설폐기물이 감소, 시각적으로도 뛰어난 바닥을 제공할 수 있으며, 물의 사용량이 현저히 감소하게 되며, 환경친화적이 되며, 내구성이 더 향상되는 장점을 갖는 타일 시공방법에 관한 것이다.
METHOD FOR CONSTRUCTING TILE
타일 시공 방법
JUNG CHOONG LAE (author)
2017-12-05
Patent
Electronic Resource
Korean
TILE UNIT, STRUCTURE, AND METHOD FOR CONSTRUCTING TILE UNIT
European Patent Office | 2024
|