A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR CLOSED PARALLEL TUNNEL AND CLOSED PARALLEL TUNNEL USING THE SAME
The present invention provides an environmentally friendly construction method for a closest parallel tunnel, which can minimize a topographic loss and can reduce construction periods, and a closest parallel tunnel using the same. According to the present invention, the construction method for a closest parallel tunnel includes: an excavation groove construction step of excavating a first ground to be excavated and forming an excavation groove between a first tunnel and a second tunnel, wherein the closest parallel tunnel comprising a first tunnel and a second tunnel close to each other is constructed on the first ground to be excavated; a single wall construction step of continuously embedding multiple column support members in the excavation groove and placing and curing a curable fixing agent in the excavation groove to form a single wall with the column support member; a tunnel excavation step of excavating a second ground to be excavated in the longitudinal direction to form the first tunnel and the second tunnel; and a passage construction step of forming a frame in order for the passage of the first tunnel and the second tunnel to be constructed as a ceiling support member is connected to the column support member. The excavation step and the passage construction step are repeatedly constructed in the longitudinal direction of the first tunnel and the second tunnel in order.
본 발명의 초근접병렬터널의 시공방법 및 이를 이용한 초근접병렬터널은 서로 근접한 제1터널과 제2터널로 이루어진 근접병렬터널이 시공되는 제1굴착대상지반을 굴착하여 제1터널과 제2터널 사이에 굴착홈이 형성되는 굴착홈시공단계, 상기 굴착홈에 다수의 기둥지보재를 연속적으로 매설하고, 상기 기둥지보재와 함께 단일벽이 형성되도록 상기 굴착홈에 경화성 고착제를 타설 및 양생하는 단일벽시공단계, 상기 제1터널 및 상기 제2터널이 형성되도록 길이방향을 따라 제2굴착대상지반을 굴착하는 터널굴착단계, 상기 기둥지보재에 천정지보재가 결합되어 상기 제1터널 및 상기 제2터널의 통로가 시공되도록 골조를 형성하는 통로시공단계를 포함하며, 상기 굴착단계 및 상기 통로시공단계는, 상기 제1터널 및 상기 제2터널의 길이방향을 따라 순차적으로 반복하여 시공되는 초근접병렬터널의 시공방법 및 이를 이용한 초근접병렬터널을 개시한다.
CONSTRUCTION METHOD FOR CLOSED PARALLEL TUNNEL AND CLOSED PARALLEL TUNNEL USING THE SAME
The present invention provides an environmentally friendly construction method for a closest parallel tunnel, which can minimize a topographic loss and can reduce construction periods, and a closest parallel tunnel using the same. According to the present invention, the construction method for a closest parallel tunnel includes: an excavation groove construction step of excavating a first ground to be excavated and forming an excavation groove between a first tunnel and a second tunnel, wherein the closest parallel tunnel comprising a first tunnel and a second tunnel close to each other is constructed on the first ground to be excavated; a single wall construction step of continuously embedding multiple column support members in the excavation groove and placing and curing a curable fixing agent in the excavation groove to form a single wall with the column support member; a tunnel excavation step of excavating a second ground to be excavated in the longitudinal direction to form the first tunnel and the second tunnel; and a passage construction step of forming a frame in order for the passage of the first tunnel and the second tunnel to be constructed as a ceiling support member is connected to the column support member. The excavation step and the passage construction step are repeatedly constructed in the longitudinal direction of the first tunnel and the second tunnel in order.
본 발명의 초근접병렬터널의 시공방법 및 이를 이용한 초근접병렬터널은 서로 근접한 제1터널과 제2터널로 이루어진 근접병렬터널이 시공되는 제1굴착대상지반을 굴착하여 제1터널과 제2터널 사이에 굴착홈이 형성되는 굴착홈시공단계, 상기 굴착홈에 다수의 기둥지보재를 연속적으로 매설하고, 상기 기둥지보재와 함께 단일벽이 형성되도록 상기 굴착홈에 경화성 고착제를 타설 및 양생하는 단일벽시공단계, 상기 제1터널 및 상기 제2터널이 형성되도록 길이방향을 따라 제2굴착대상지반을 굴착하는 터널굴착단계, 상기 기둥지보재에 천정지보재가 결합되어 상기 제1터널 및 상기 제2터널의 통로가 시공되도록 골조를 형성하는 통로시공단계를 포함하며, 상기 굴착단계 및 상기 통로시공단계는, 상기 제1터널 및 상기 제2터널의 길이방향을 따라 순차적으로 반복하여 시공되는 초근접병렬터널의 시공방법 및 이를 이용한 초근접병렬터널을 개시한다.
CONSTRUCTION METHOD FOR CLOSED PARALLEL TUNNEL AND CLOSED PARALLEL TUNNEL USING THE SAME
초근접병렬터널의 시공방법 및 이를 이용한 초근접병렬터널
PARK JAE HYUN (author) / PARK JIN (author) / YUN ILJOONG (author)
2018-01-24
Patent
Electronic Resource
Korean
Synchronous lining construction method and parallel construction method of hydraulic tunnel
European Patent Office | 2024
|Design studies for closed-jet water tunnel
Engineering Index Backfile | 1951
|GROUND IMPROVEMENT PARALLEL CONCRETE BOX CONSTRUCTION METHOD FOR TUNNEL CONSTRUCTING
European Patent Office | 2023
|Low-speed Closed Circuit Wind Tunnel, Kanpur, India
British Library Online Contents | 2002
|The Fort Lawton Parallel Tunnel
British Library Conference Proceedings | 1993
|