The present invention provides a wall to block deposited concrete, fixing a deposition range to perform a concrete deposition work by each divided section, allowing frames (10, 10-1) of a predetermined size to be continuously connected as a wall to block deposited concrete to prevent the deposited concrete from flowing out, and facilitating manufacturing due to a simple configuration thereof. Such configuration provides a frame connection means by convenience to simply connect a fastening hole (13), which is perforated in a frame (10-1) to connect the frame (10, 10-1) to be connected to a fastening piece (32) formed in a connection member (30) with an identical shape; and a characteristic capable of being connected by a straight line, a right angle, or a diagonal, etc., since the connection member (30) to connect the frame (10, 10-1) is improved. Since a blocking rod (20) penetrating a through-hole (11) perforated by upper and lower pieces (12) of the frame (10, 10-1) forms a head part (21) with a bent top part and a foam pipe (40) is inserted into a lower long steel rod member (22), provided are effects of lowering manufacturing costs and efficiently improving functions since a wall to block deposited concrete as the foam pipe (40) corrects the space between the blocking rods (20).
본 발명은 콘크리트 타설막이 작업에서 구역별로 분할시켜 콘크리트 타설작업을 할 수 있도록 타설 범위를 정하고, 타설되는 콘크리트가 유출되는 것을 방지하기 위한 콘크리트 타설막이로서 일정한 크기의 프레임(10,10-1)을 연속적으로 연결 가능하도록 함과 함께 그 구성이 간단하여 제작이 용이한 콘크리트 타설막이를 제공한다. 이러한 구성은 연결할 프레임(10,10-1)을 동일형태의 연결부재(30)에 형성된 체결편(32)에 연결할 프레임(10-1)에 뚫린 체결공(13)을 간단히 연결하는 편리성에 의한 프레임연결수단과, 그리고 상기 프레임(10,10-1)을 연결하는 연결부재(30)를 간단히 개선하여 직선, 직각 또는 대각 등으로 연결할 수 있는 특징과, 상기 프레임(10,10-1)의 상하편(12)에 뚫린 관통공(11)에 관통되는 차단봉(20)은 상단부가 절곡된 머리부(21)를 형성하고 하부의 기다란 철봉재(22)에는 발포관(40)을 끼워 구성함으로써 저렴한 원가로 제조 가능함과 함께 발포관(40)은 차단봉(20) 사이 공간을 보정하여 콘크리트 타설막이(100)로서 효율적 기능향상의 효과를 발휘하는 것이다.
The present invention provides a wall to block deposited concrete, fixing a deposition range to perform a concrete deposition work by each divided section, allowing frames (10, 10-1) of a predetermined size to be continuously connected as a wall to block deposited concrete to prevent the deposited concrete from flowing out, and facilitating manufacturing due to a simple configuration thereof. Such configuration provides a frame connection means by convenience to simply connect a fastening hole (13), which is perforated in a frame (10-1) to connect the frame (10, 10-1) to be connected to a fastening piece (32) formed in a connection member (30) with an identical shape; and a characteristic capable of being connected by a straight line, a right angle, or a diagonal, etc., since the connection member (30) to connect the frame (10, 10-1) is improved. Since a blocking rod (20) penetrating a through-hole (11) perforated by upper and lower pieces (12) of the frame (10, 10-1) forms a head part (21) with a bent top part and a foam pipe (40) is inserted into a lower long steel rod member (22), provided are effects of lowering manufacturing costs and efficiently improving functions since a wall to block deposited concrete as the foam pipe (40) corrects the space between the blocking rods (20).
본 발명은 콘크리트 타설막이 작업에서 구역별로 분할시켜 콘크리트 타설작업을 할 수 있도록 타설 범위를 정하고, 타설되는 콘크리트가 유출되는 것을 방지하기 위한 콘크리트 타설막이로서 일정한 크기의 프레임(10,10-1)을 연속적으로 연결 가능하도록 함과 함께 그 구성이 간단하여 제작이 용이한 콘크리트 타설막이를 제공한다. 이러한 구성은 연결할 프레임(10,10-1)을 동일형태의 연결부재(30)에 형성된 체결편(32)에 연결할 프레임(10-1)에 뚫린 체결공(13)을 간단히 연결하는 편리성에 의한 프레임연결수단과, 그리고 상기 프레임(10,10-1)을 연결하는 연결부재(30)를 간단히 개선하여 직선, 직각 또는 대각 등으로 연결할 수 있는 특징과, 상기 프레임(10,10-1)의 상하편(12)에 뚫린 관통공(11)에 관통되는 차단봉(20)은 상단부가 절곡된 머리부(21)를 형성하고 하부의 기다란 철봉재(22)에는 발포관(40)을 끼워 구성함으로써 저렴한 원가로 제조 가능함과 함께 발포관(40)은 차단봉(20) 사이 공간을 보정하여 콘크리트 타설막이(100)로서 효율적 기능향상의 효과를 발휘하는 것이다.
A interception wall for pouring the concrete
콘크리트 타설막이
JO JIN KYU (author)
2018-03-07
Patent
Electronic Resource
Korean
IPC:
E04G
SCAFFOLDING
,
Baugerüste