A platform for research: civil engineering, architecture and urbanism
A interception wall for pouring the concrete
The present invention relates to a concrete deposition blocker and, more specifically, to a concrete deposition blocker to prevent deposited concrete from spilling when determining a deposition range by temporarily dividing into surface areas at a site where concrete is deposited in a wide area, and depositing the concrete from the divided range. Through holes (13) penetrated by fastening bars (20) are drilled on an upper plate (11) and a lower plate (12) of a deposition blocker frame (10), and the fastening bars (20) with finishing caps (21) inserted into the upper ends thereof penetrate. The concrete deposition blocker (100) fastens a thick foam pipe (40) from below. A problem where the assembled foam pipe (40) is easily detached in transport, storage, etc. is alleviated. The foam pipe (40) is easily assembled on the deposition blocker frame (10), and is prevented from being detached.
본 발명은 콘크리트 타설막이에 관한 것으로, 더욱 상세하게는 넓은 구역에 콘크리트 타설하는 현장에서 일시적으로 면적으로 나누어 타설 범위를 정하고, 그 나눈 범위로부터 콘크리트를 타설할 때 타설되는 콘크리트가 유출되는 것을 방지하기 위한 콘크리트 타설막이에 관한 것으로 본 발명은 타설막이 프레임(10)의 상부판(11)과 하부판(12)에 체결봉(20)이 관통하는 통공(13)을 각각 뚫고, 상단에 마감캡(21)이 끼워지는 체결봉(20)을 관통시켜 하부에서 두꺼운 발포관(40)을 체결하는 콘크리트 타설막이(100)에서 조립된 발포관(40)을 운반, 보관등에서 쉽게 이탈되는 문제를 개선하고 발포관(40)을 타설막이 프레임(10)에 쉽게 조립하고 이탈되지 않도록 함을 특징으로 하는 것이다.
A interception wall for pouring the concrete
The present invention relates to a concrete deposition blocker and, more specifically, to a concrete deposition blocker to prevent deposited concrete from spilling when determining a deposition range by temporarily dividing into surface areas at a site where concrete is deposited in a wide area, and depositing the concrete from the divided range. Through holes (13) penetrated by fastening bars (20) are drilled on an upper plate (11) and a lower plate (12) of a deposition blocker frame (10), and the fastening bars (20) with finishing caps (21) inserted into the upper ends thereof penetrate. The concrete deposition blocker (100) fastens a thick foam pipe (40) from below. A problem where the assembled foam pipe (40) is easily detached in transport, storage, etc. is alleviated. The foam pipe (40) is easily assembled on the deposition blocker frame (10), and is prevented from being detached.
본 발명은 콘크리트 타설막이에 관한 것으로, 더욱 상세하게는 넓은 구역에 콘크리트 타설하는 현장에서 일시적으로 면적으로 나누어 타설 범위를 정하고, 그 나눈 범위로부터 콘크리트를 타설할 때 타설되는 콘크리트가 유출되는 것을 방지하기 위한 콘크리트 타설막이에 관한 것으로 본 발명은 타설막이 프레임(10)의 상부판(11)과 하부판(12)에 체결봉(20)이 관통하는 통공(13)을 각각 뚫고, 상단에 마감캡(21)이 끼워지는 체결봉(20)을 관통시켜 하부에서 두꺼운 발포관(40)을 체결하는 콘크리트 타설막이(100)에서 조립된 발포관(40)을 운반, 보관등에서 쉽게 이탈되는 문제를 개선하고 발포관(40)을 타설막이 프레임(10)에 쉽게 조립하고 이탈되지 않도록 함을 특징으로 하는 것이다.
A interception wall for pouring the concrete
콘크리트 타설막이
KIM GI CHAN (author)
2020-09-07
Patent
Electronic Resource
Korean
IPC:
E04G
SCAFFOLDING
,
Baugerüste