Construction method of small-calibre sewer pipe using steel pipe working hole and precast concrete slab into flimsy ground
The present invention relates to a method to reinforce a soft ground for a small diameter sewer pipe using a steel pipe working hole and a precast bottom plate, capable of largely reducing a construct period. According to the present invention, the method to reinforce a soft ground for a small diameter sewer pipe using a steel pipe working hole and a precast bottom plate comprises: a step (a) of inserting a steel pipe; a step (b) of excavating the inside of the steel pipe to form a working hole; a step (c) of discharging infiltrating water in the working hole to the outside; a step (d) of installing an entrance; a step (e) of penetrating a plurality of lead pipes into the entrance to propel the lead pipes toward a manhole; a step (f) of sequentially disassembling the lead pipes coming out of the manhole; a step (g) of sequentially disassembling an auger; a step (h) of disassembling a front end pipe; a step (i) of removing a propeller; a step (j) of installing aggregates on the bottom of the working hole; and a step (k) of installing a connection pipe to a main pipe of a working hole side and installing a manhole in the working hole.
본 발명의 적절한 실시 형태에 따른 강관작업구와 프리캐스트 바닥판을 이용한 소구경 하수관 연약지반 부설공법은, (a) 지상에서 시작 지점에 강관 압입기를 설치한 후, 강관을 강관 압입기에 거치하여 지반에 소요 깊이만큼 압입시켜 놓는 단계와; (b) 상기 강관의 내부를 굴착하여 작업구를 형성시키는 단계; (c) 작업구와 동일 단면의 프리캐스트 콘크리트로 이루어지며 수직방향으로 관통하여 1개 이상의 배출구가 형성되는 프리캐스트 바닥판을 작업구의 내부로 삽입하고, 배출구를 통하여 배수관을 삽입하여 작업구 내부의 침투수를 외부로 배출시키도록 하는 단계; (d) 상기 작업구의 내부로 왕복 운동하는 추진체와 정역 회전하는 회전축을 갖는 추진기를 도입하여 상기 강관에 고정되게 설치한 후, 강관에 종료지점인 맨홀을 향하여 투입구를 형성한 후, 그 투입구에 선두관(또는 본관)이나 리드관의 관입을 위해 엔트런스를 설치하는 단계와; (e) 상기 추진기의 회전축에 하수관 구간에 설치될 다수개의 리드관을 순차적으로 연결해가면서 선두에 위치된 최초 리드관이 맨홀에 도달될 때까지 상기 엔트런스를 통과시켜 맨홀을 향하여 추진시키는 단계와; (f) 상기 추진기의 추진체를 원위치로 복귀시킨 후 추진체와 회전축에 각기 다수개의 선두관과 오거를 순차적으로 연결해나가면서 최초 선두관이 맨홀에 도달될 때까지 추진을 반복하고, 이와 동시에 추진이 정지될 때마다 맨홀로 빠져나오는 리드관을 순차적으로 해체하는 단계와; (g) 상기 추진기의 회전축을 회전시키면서 오거를 역추진 방향으로 인출해내면서 작업구에서 하나씩 연결 부분을 풀어 순차적으로 해체시키는 단계와; (h) 상기 추진기를 사용하여 본관의 연결 및 추진을 반복하고 동시에 본관에서 밀려 맨홀에 도달하여 나타나는 선두관을 본관의 연결시마다 선두관을 해체하는 단계와; (i) 최초 본관이 맨홀에 도달되면, 추진기를 강관에서 해체한 후 인양하여 작업구에서 제거하는 단계와; (j) 작업구내 잔토를 처리하고, 본관의 갱구부를 면정리 한 후, 작업구의 바닥에 골재를 포설하는 단계; 및 (k) 작업구측 본관에 연결관을 부설하고, 작업구 내에 맨홀을 설치하는 단계;를 포함하여 시공되는 것을 특징으로 한다.
Construction method of small-calibre sewer pipe using steel pipe working hole and precast concrete slab into flimsy ground
The present invention relates to a method to reinforce a soft ground for a small diameter sewer pipe using a steel pipe working hole and a precast bottom plate, capable of largely reducing a construct period. According to the present invention, the method to reinforce a soft ground for a small diameter sewer pipe using a steel pipe working hole and a precast bottom plate comprises: a step (a) of inserting a steel pipe; a step (b) of excavating the inside of the steel pipe to form a working hole; a step (c) of discharging infiltrating water in the working hole to the outside; a step (d) of installing an entrance; a step (e) of penetrating a plurality of lead pipes into the entrance to propel the lead pipes toward a manhole; a step (f) of sequentially disassembling the lead pipes coming out of the manhole; a step (g) of sequentially disassembling an auger; a step (h) of disassembling a front end pipe; a step (i) of removing a propeller; a step (j) of installing aggregates on the bottom of the working hole; and a step (k) of installing a connection pipe to a main pipe of a working hole side and installing a manhole in the working hole.
본 발명의 적절한 실시 형태에 따른 강관작업구와 프리캐스트 바닥판을 이용한 소구경 하수관 연약지반 부설공법은, (a) 지상에서 시작 지점에 강관 압입기를 설치한 후, 강관을 강관 압입기에 거치하여 지반에 소요 깊이만큼 압입시켜 놓는 단계와; (b) 상기 강관의 내부를 굴착하여 작업구를 형성시키는 단계; (c) 작업구와 동일 단면의 프리캐스트 콘크리트로 이루어지며 수직방향으로 관통하여 1개 이상의 배출구가 형성되는 프리캐스트 바닥판을 작업구의 내부로 삽입하고, 배출구를 통하여 배수관을 삽입하여 작업구 내부의 침투수를 외부로 배출시키도록 하는 단계; (d) 상기 작업구의 내부로 왕복 운동하는 추진체와 정역 회전하는 회전축을 갖는 추진기를 도입하여 상기 강관에 고정되게 설치한 후, 강관에 종료지점인 맨홀을 향하여 투입구를 형성한 후, 그 투입구에 선두관(또는 본관)이나 리드관의 관입을 위해 엔트런스를 설치하는 단계와; (e) 상기 추진기의 회전축에 하수관 구간에 설치될 다수개의 리드관을 순차적으로 연결해가면서 선두에 위치된 최초 리드관이 맨홀에 도달될 때까지 상기 엔트런스를 통과시켜 맨홀을 향하여 추진시키는 단계와; (f) 상기 추진기의 추진체를 원위치로 복귀시킨 후 추진체와 회전축에 각기 다수개의 선두관과 오거를 순차적으로 연결해나가면서 최초 선두관이 맨홀에 도달될 때까지 추진을 반복하고, 이와 동시에 추진이 정지될 때마다 맨홀로 빠져나오는 리드관을 순차적으로 해체하는 단계와; (g) 상기 추진기의 회전축을 회전시키면서 오거를 역추진 방향으로 인출해내면서 작업구에서 하나씩 연결 부분을 풀어 순차적으로 해체시키는 단계와; (h) 상기 추진기를 사용하여 본관의 연결 및 추진을 반복하고 동시에 본관에서 밀려 맨홀에 도달하여 나타나는 선두관을 본관의 연결시마다 선두관을 해체하는 단계와; (i) 최초 본관이 맨홀에 도달되면, 추진기를 강관에서 해체한 후 인양하여 작업구에서 제거하는 단계와; (j) 작업구내 잔토를 처리하고, 본관의 갱구부를 면정리 한 후, 작업구의 바닥에 골재를 포설하는 단계; 및 (k) 작업구측 본관에 연결관을 부설하고, 작업구 내에 맨홀을 설치하는 단계;를 포함하여 시공되는 것을 특징으로 한다.
Construction method of small-calibre sewer pipe using steel pipe working hole and precast concrete slab into flimsy ground
강관작업구와 프리캐스트 바닥판을 이용한 소구경 하수관 연약지반 부설공법
LEE YONG TAEK (author) / KIM TAE HOON (author) / KIM JONG KWON (author) / LEE SUN BOK (author) / HAN BYUM SEOK (author) / LEE DAE HYOUNG (author) / RYU BUM SOO (author) / KIM HO SEOP (author)
2018-12-27
Patent
Electronic Resource
Korean
European Patent Office | 2019
British Library Conference Proceedings | 1997
|European Patent Office | 2019
|Electromechanical tube well precast slab casing pipe positioning construction method
European Patent Office | 2022
|