A platform for research: civil engineering, architecture and urbanism
CIP CIP waterproof reinforcement method
The present invention relates to a cast-in-place pile (CIP) waterproof reinforcement method. More specifically, in construction of a CIP method, which is a soil retaining method for installing a soil retaining wall to prevent soil from flowing down or prevent ground from being collapsed during underground excavation and road extension constructions for constructing or installing a building structure, when performing a work for perforating a column installation hole (110) at a predetermined interval to install a casing (200) or installing an H-beam (300) or a rebar (400) in the casing (200) after the casing is installed simultaneously perforation, and filling the casing with mortar including cement, gravel, sand, and the like, to solidify the mortar, the method insets and installs an arched water blocking plate (500) having a connection means formed on both side ends to the outside in the inner part of the casing (200) and each arched water blocking plate (500) is connected and installed by the connection member (600) after removal of the casing. Accordingly, a prevention wall to prevent soil from flowing down or prevent ground from being collapsed by a support column (310) and rebar concrete columns (410) is completely constructed and the water blocking wall is simultaneously formed by the arched water blocking plate (500) and the connection members (600), which are made of a PVC material or a thin metal plate, thereby providing a complete water blocking function. Accordingly, various civil engineering constructions, such as underground excavation construction for constructing or installing a building structure and road extension construction, can be easily performed.
본 발명은 CIP 차수 보강 공법에 관한 것으로, 더욱 상세하게는 건축물을 건설하거나 구축물을 설치하기 위한 지하 터파기공사와 도로확장 공사시 토사가 흘러내리거나 지반이 무너지는 것을 방지하기 위하여 토류벽을 설치하는 흙막이 공법인 CIP공법 시공시 소정 간격으로 기둥설치공(110)을 뚫어 케이싱(200)을 설치하거나 또는 천공과 동시에 케이싱(200)을 설치한 후 케이싱(200) 내부에 H빔(300) 또는 철근(400)을 설치한 후 시멘트, 자갈, 모래 등으로 된 몰타르를 충진시켜 기둥으로 고형화시키는 작업 수행시 케이싱(200) 내부 외측으로 양측단에 연결수단이 구비된 원호형 차수판(500)을 삽입설치하고, 케이싱(200) 제거 후 각각의 원호형 차수판(500)을 연결부재(600)로 연결설치함으로써, 지지기둥(310) 및 철근콘크리트 기둥(410)들에 의해 토사가 흘러내리거나 지반이 무너지는 것이 방지되는 방호벽이 완벽하게 구축되는 것은 물론, 여기에 더불어 PVC재질이나 얇은 금속판으로 구성되는 원호형 차수판(500) 및 연결부재(600)들에 의해 차수벽이 동시에 형성되는 것이어서 완벽한 차수기능이 발휘되는 것이어서 건축물을 건설하거나 구축물을 설치하기 위한 지하 터파기공사와 도로를 확장하는 공사 등과 같은 각종 토목공사를 용이하게 실시할 수 있도록 한 것에 그 특징이 있는 것이다.
CIP CIP waterproof reinforcement method
The present invention relates to a cast-in-place pile (CIP) waterproof reinforcement method. More specifically, in construction of a CIP method, which is a soil retaining method for installing a soil retaining wall to prevent soil from flowing down or prevent ground from being collapsed during underground excavation and road extension constructions for constructing or installing a building structure, when performing a work for perforating a column installation hole (110) at a predetermined interval to install a casing (200) or installing an H-beam (300) or a rebar (400) in the casing (200) after the casing is installed simultaneously perforation, and filling the casing with mortar including cement, gravel, sand, and the like, to solidify the mortar, the method insets and installs an arched water blocking plate (500) having a connection means formed on both side ends to the outside in the inner part of the casing (200) and each arched water blocking plate (500) is connected and installed by the connection member (600) after removal of the casing. Accordingly, a prevention wall to prevent soil from flowing down or prevent ground from being collapsed by a support column (310) and rebar concrete columns (410) is completely constructed and the water blocking wall is simultaneously formed by the arched water blocking plate (500) and the connection members (600), which are made of a PVC material or a thin metal plate, thereby providing a complete water blocking function. Accordingly, various civil engineering constructions, such as underground excavation construction for constructing or installing a building structure and road extension construction, can be easily performed.
본 발명은 CIP 차수 보강 공법에 관한 것으로, 더욱 상세하게는 건축물을 건설하거나 구축물을 설치하기 위한 지하 터파기공사와 도로확장 공사시 토사가 흘러내리거나 지반이 무너지는 것을 방지하기 위하여 토류벽을 설치하는 흙막이 공법인 CIP공법 시공시 소정 간격으로 기둥설치공(110)을 뚫어 케이싱(200)을 설치하거나 또는 천공과 동시에 케이싱(200)을 설치한 후 케이싱(200) 내부에 H빔(300) 또는 철근(400)을 설치한 후 시멘트, 자갈, 모래 등으로 된 몰타르를 충진시켜 기둥으로 고형화시키는 작업 수행시 케이싱(200) 내부 외측으로 양측단에 연결수단이 구비된 원호형 차수판(500)을 삽입설치하고, 케이싱(200) 제거 후 각각의 원호형 차수판(500)을 연결부재(600)로 연결설치함으로써, 지지기둥(310) 및 철근콘크리트 기둥(410)들에 의해 토사가 흘러내리거나 지반이 무너지는 것이 방지되는 방호벽이 완벽하게 구축되는 것은 물론, 여기에 더불어 PVC재질이나 얇은 금속판으로 구성되는 원호형 차수판(500) 및 연결부재(600)들에 의해 차수벽이 동시에 형성되는 것이어서 완벽한 차수기능이 발휘되는 것이어서 건축물을 건설하거나 구축물을 설치하기 위한 지하 터파기공사와 도로를 확장하는 공사 등과 같은 각종 토목공사를 용이하게 실시할 수 있도록 한 것에 그 특징이 있는 것이다.
CIP CIP waterproof reinforcement method
CIP 차수 보강 공법
PARK JOUNG GUN (author)
2019-05-15
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|Underground engineering waterproof board reinforcement method
European Patent Office | 2022
|WATERPROOF ROOF STRUCTURE, REPAIR METHOD OF WATERPROOF ROOF STRUCTURE AND SEAL REINFORCEMENT MEMBER