PRECAST CONCRETE GIRDER FOR USED BY CONTINUOUS CONSTRUCTION METHOD
The present invention relates to a method of constructing precast concrete pillars and beams installed on the site after being manufactured in a factory previously. In a process of installing the precast concrete beams between the precast concrete pillars, an end unit of a beam connecting rebar fastened with a beam connecting ironwork installed on an end unit of the precast concrete beams is inserted into and fixed in the precast concrete pillars. In a process of installing the precast concrete pillars on an upper layer on the precast concrete pillars on a lower layer, at least some of the rebars protruding towards an upper side of the precast concrete pillars on a lower layer are fastened with the pillar connecting ironwork installed on a lower side of the precast concrete pillars on an upper layer. The precast concrete pillars and the precast concrete beams are constructed without performing the bonding unit concrete placement and the topping concrete placement in the process of installing the precast concrete beams. The beam connecting ironwork is a structure with an empty inside and an opened upper surface, and the beam connecting rebar is inserted into the penetrating hole formed on an end unit. With an end unit of the beam connecting rebar inserted into the precast concrete pillars, a nut is fastened with a screw thread formed on a surface of the beam connecting rebar, thereby fastening the beam connecting rebar with the beam connecting rebar. The pillar connecting ironwork is a structure with an empty inside and a part of its side surface opened towards an external surface of the precast concrete pillars. An end unit of the rebar of the precast concrete pillars on a lower layer is inserted into the penetrating hole formed on a lower end. A nut is fastened with a screw thread formed on a surface of the rebar of the precast concrete pillars on a lower layer, thereby fastening the rebar of the precast concrete pillars on a lower layer with the pillar connecting ironwork. According to the present invention, the time for placement and curing of concrete is greatly reduced, thereby reducing the whole process time.
본 발명은 미리 공장에서 제작되어 현장에서 설치되는 프리캐스트 콘크리트 기둥과 보를 현장에서 시공하는 방법으로서, 프리캐스트 콘크리트 기둥의 사이에 프리캐스트 콘크리트 보를 설치하는 과정에서, 프리캐스트 콘크리트 기둥에 프리캐스트 콘크리트 보의 단부에 설치된 보연결철물에 체결된 보연결철근의 단부를 끼워서 고정하고, 하층의 프리캐스트 콘크리트 기둥의 위에 상층의 프리캐스트 콘크리트 기둥을 설치하는 과정에서, 하층의 프리캐스트 콘크리트 기둥의 상부로 돌출된 철근 중 적어도 일부와 상층의 프리캐스트 콘크리트 기둥의 하부에 설치된 기둥연결철물을 체결함으로써, 프리캐스트 콘크리트 보의 설치과정에서 접합부 콘크리트 타설 및 토핑 콘크리트 타설을 수행하지 않은 상태에서, 프리캐스트 콘크리트 기둥과 프리캐스트 콘크리트 보를 시공하며, 상기 보연결철물은 내부가 비어 있고 상면이 개방된 구조물로서, 단부에 형성된 관통공에 상기 보연결철근이 삽입되고, 상기 보연결철근의 단부가 프리캐스트 콘크리트 기둥에 끼워진 상태에서 상기 보연결철근의 표면에 형성된 나사산에 너트를 체결하여 보연결철근과 보연결철물을 체결하고, 상기 기둥연결철물은 내부가 비어 있고 측면 일부가 프리캐스트 콘크리트 기둥 외면으로 개방된 구조물로서, 하단에 형성된 관통공에 하층의 프리캐스트 콘크리트 기둥의 철근 단부가 삽입되고, 상기 하층의 프리캐스트 콘크리트 기둥의 철근 표면에 형성된 나사산에 너트를 체결하여 하층의 프리캐스트 콘크리트 기둥의 철근과 기둥연결철물을 체결하는 것을 특징으로 한다.
PRECAST CONCRETE GIRDER FOR USED BY CONTINUOUS CONSTRUCTION METHOD
The present invention relates to a method of constructing precast concrete pillars and beams installed on the site after being manufactured in a factory previously. In a process of installing the precast concrete beams between the precast concrete pillars, an end unit of a beam connecting rebar fastened with a beam connecting ironwork installed on an end unit of the precast concrete beams is inserted into and fixed in the precast concrete pillars. In a process of installing the precast concrete pillars on an upper layer on the precast concrete pillars on a lower layer, at least some of the rebars protruding towards an upper side of the precast concrete pillars on a lower layer are fastened with the pillar connecting ironwork installed on a lower side of the precast concrete pillars on an upper layer. The precast concrete pillars and the precast concrete beams are constructed without performing the bonding unit concrete placement and the topping concrete placement in the process of installing the precast concrete beams. The beam connecting ironwork is a structure with an empty inside and an opened upper surface, and the beam connecting rebar is inserted into the penetrating hole formed on an end unit. With an end unit of the beam connecting rebar inserted into the precast concrete pillars, a nut is fastened with a screw thread formed on a surface of the beam connecting rebar, thereby fastening the beam connecting rebar with the beam connecting rebar. The pillar connecting ironwork is a structure with an empty inside and a part of its side surface opened towards an external surface of the precast concrete pillars. An end unit of the rebar of the precast concrete pillars on a lower layer is inserted into the penetrating hole formed on a lower end. A nut is fastened with a screw thread formed on a surface of the rebar of the precast concrete pillars on a lower layer, thereby fastening the rebar of the precast concrete pillars on a lower layer with the pillar connecting ironwork. According to the present invention, the time for placement and curing of concrete is greatly reduced, thereby reducing the whole process time.
본 발명은 미리 공장에서 제작되어 현장에서 설치되는 프리캐스트 콘크리트 기둥과 보를 현장에서 시공하는 방법으로서, 프리캐스트 콘크리트 기둥의 사이에 프리캐스트 콘크리트 보를 설치하는 과정에서, 프리캐스트 콘크리트 기둥에 프리캐스트 콘크리트 보의 단부에 설치된 보연결철물에 체결된 보연결철근의 단부를 끼워서 고정하고, 하층의 프리캐스트 콘크리트 기둥의 위에 상층의 프리캐스트 콘크리트 기둥을 설치하는 과정에서, 하층의 프리캐스트 콘크리트 기둥의 상부로 돌출된 철근 중 적어도 일부와 상층의 프리캐스트 콘크리트 기둥의 하부에 설치된 기둥연결철물을 체결함으로써, 프리캐스트 콘크리트 보의 설치과정에서 접합부 콘크리트 타설 및 토핑 콘크리트 타설을 수행하지 않은 상태에서, 프리캐스트 콘크리트 기둥과 프리캐스트 콘크리트 보를 시공하며, 상기 보연결철물은 내부가 비어 있고 상면이 개방된 구조물로서, 단부에 형성된 관통공에 상기 보연결철근이 삽입되고, 상기 보연결철근의 단부가 프리캐스트 콘크리트 기둥에 끼워진 상태에서 상기 보연결철근의 표면에 형성된 나사산에 너트를 체결하여 보연결철근과 보연결철물을 체결하고, 상기 기둥연결철물은 내부가 비어 있고 측면 일부가 프리캐스트 콘크리트 기둥 외면으로 개방된 구조물로서, 하단에 형성된 관통공에 하층의 프리캐스트 콘크리트 기둥의 철근 단부가 삽입되고, 상기 하층의 프리캐스트 콘크리트 기둥의 철근 표면에 형성된 나사산에 너트를 체결하여 하층의 프리캐스트 콘크리트 기둥의 철근과 기둥연결철물을 체결하는 것을 특징으로 한다.
PRECAST CONCRETE GIRDER FOR USED BY CONTINUOUS CONSTRUCTION METHOD
연속 시공을 위한 프리캐스트 콘크리트 보
NA KUM OK (author) / YOO JONG WOO (author) / LIM EUN JI (author)
2020-09-23
Patent
Electronic Resource
Korean
PRECAST CONCRETE GIRDER FOR USED BY CONTINUOUS CONSTRUCTION METHOD
European Patent Office | 2021
PREFABRICATED PRECAST CONCRETE GIRDER FOR BUILDING CONSTRUCTION
European Patent Office | 2015
|PREFABRICATED PRECAST CONCRETE GIRDER FOR BUILDING CONSTRUCTION
European Patent Office | 2015
|PRECAST CONCRETE STRUCTURES CONSTRUCTION METHODS FOR GIRDER SYNTHESIS
European Patent Office | 2015
|PRECAST CONCRETE COLUMN FOR USED BY CONTINUOUS CONSTRUCTION METHOD
European Patent Office | 2020
|