PRECAST CONCRETE COLUMN FOR USED BY CONTINUOUS CONSTRUCTION METHOD
The present invention relates to a method to construct a precast concrete column and a precast concrete beam which are pre-fabricated in a factory before being installed on a site. In particular, in a process in which a precast concrete beam is installed among precast concrete columns, an end portion of a beam connecting reinforcing bar, which is fastened to a beam connecting steel installed at an end portion of the precast concrete beam, is inserted and fixed to the precast concrete columns, and the precast concrete column of an upper layer is installed over the precast concrete column of a lower layer. Moreover, at least one portion of a reinforcing bar protruding to an upper portion of the precast concrete column of the lower layer is fastened to a column connecting steel which is installed at a lower portion of the precast concrete column of the upper layer. Therefore, during the installation process of the precast concrete beam, in a state in which concrete placement at a joint portion and topping concrete placement are not performed, the precast concrete column and the precast concrete beam are constructed. Moreover, the beam connecting steel is a hollow structure with an opened upper surface. The beam connecting reinforcing bar is inserted into a penetration hole formed at an end portion. In a state in which the end portion of the beam connecting reinforcing bar is inserted into the precast concrete columns, a nut is fastened to a screw thread formed on the surface of the beam connecting reinforcing bar such that the beam connecting reinforcing bar and the beam connecting steel can be fastened. Furthermore, the column connecting steel is a structure with the hollow inside and a portion of a side surface opened to an outer surface of the precast concrete columns. An end portion of the reinforcing bar of the precast concrete column at the lower layer is inserted into a penetration hole formed at a lower end. A nut is fastened to a screw thread formed on the surface of the reinforcing bar of the precast concrete column of the lower layer, such that the reinforcing bar of the precast concrete column of the lower layer and the column connecting steel can be fastened to each other.
본 발명은 미리 공장에서 제작되어 현장에서 설치되는 프리캐스트 콘크리트 기둥과 보를 현장에서 시공하는 방법으로서, 프리캐스트 콘크리트 기둥의 사이에 프리캐스트 콘크리트 보를 설치하는 과정에서, 프리캐스트 콘크리트 기둥에 프리캐스트 콘크리트 보의 단부에 설치된 보연결철물에 체결된 보연결철근의 단부를 끼워서 고정하고, 하층의 프리캐스트 콘크리트 기둥의 위에 상층의 프리캐스트 콘크리트 기둥을 설치하는 과정에서, 하층의 프리캐스트 콘크리트 기둥의 상부로 돌출된 철근 중 적어도 일부와 상층의 프리캐스트 콘크리트 기둥의 하부에 설치된 기둥연결철물을 체결함으로써, 프리캐스트 콘크리트 보의 설치과정에서 접합부 콘크리트 타설 및 토핑 콘크리트 타설을 수행하지 않은 상태에서, 프리캐스트 콘크리트 기둥과 프리캐스트 콘크리트 보를 시공하며, 상기 보연결철물은 내부가 비어 있고 상면이 개방된 구조물로서, 단부에 형성된 관통공에 상기 보연결철근이 삽입되고, 상기 보연결철근의 단부가 프리캐스트 콘크리트 기둥에 끼워진 상태에서 상기 보연결철근의 표면에 형성된 나사산에 너트를 체결하여 보연결철근과 보연결철물을 체결하고, 상기 기둥연결철물은 내부가 비어 있고 측면 일부가 프리캐스트 콘크리트 기둥 외면으로 개방된 구조물로서, 하단에 형성된 관통공에 하층의 프리캐스트 콘크리트 기둥의 철근 단부가 삽입되고, 상기 하층의 프리캐스트 콘크리트 기둥의 철근 표면에 형성된 나사산에 너트를 체결하여 하층의 프리캐스트 콘크리트 기둥의 철근과 기둥연결철물을 체결하는 것을 특징으로 한다.
PRECAST CONCRETE COLUMN FOR USED BY CONTINUOUS CONSTRUCTION METHOD
The present invention relates to a method to construct a precast concrete column and a precast concrete beam which are pre-fabricated in a factory before being installed on a site. In particular, in a process in which a precast concrete beam is installed among precast concrete columns, an end portion of a beam connecting reinforcing bar, which is fastened to a beam connecting steel installed at an end portion of the precast concrete beam, is inserted and fixed to the precast concrete columns, and the precast concrete column of an upper layer is installed over the precast concrete column of a lower layer. Moreover, at least one portion of a reinforcing bar protruding to an upper portion of the precast concrete column of the lower layer is fastened to a column connecting steel which is installed at a lower portion of the precast concrete column of the upper layer. Therefore, during the installation process of the precast concrete beam, in a state in which concrete placement at a joint portion and topping concrete placement are not performed, the precast concrete column and the precast concrete beam are constructed. Moreover, the beam connecting steel is a hollow structure with an opened upper surface. The beam connecting reinforcing bar is inserted into a penetration hole formed at an end portion. In a state in which the end portion of the beam connecting reinforcing bar is inserted into the precast concrete columns, a nut is fastened to a screw thread formed on the surface of the beam connecting reinforcing bar such that the beam connecting reinforcing bar and the beam connecting steel can be fastened. Furthermore, the column connecting steel is a structure with the hollow inside and a portion of a side surface opened to an outer surface of the precast concrete columns. An end portion of the reinforcing bar of the precast concrete column at the lower layer is inserted into a penetration hole formed at a lower end. A nut is fastened to a screw thread formed on the surface of the reinforcing bar of the precast concrete column of the lower layer, such that the reinforcing bar of the precast concrete column of the lower layer and the column connecting steel can be fastened to each other.
본 발명은 미리 공장에서 제작되어 현장에서 설치되는 프리캐스트 콘크리트 기둥과 보를 현장에서 시공하는 방법으로서, 프리캐스트 콘크리트 기둥의 사이에 프리캐스트 콘크리트 보를 설치하는 과정에서, 프리캐스트 콘크리트 기둥에 프리캐스트 콘크리트 보의 단부에 설치된 보연결철물에 체결된 보연결철근의 단부를 끼워서 고정하고, 하층의 프리캐스트 콘크리트 기둥의 위에 상층의 프리캐스트 콘크리트 기둥을 설치하는 과정에서, 하층의 프리캐스트 콘크리트 기둥의 상부로 돌출된 철근 중 적어도 일부와 상층의 프리캐스트 콘크리트 기둥의 하부에 설치된 기둥연결철물을 체결함으로써, 프리캐스트 콘크리트 보의 설치과정에서 접합부 콘크리트 타설 및 토핑 콘크리트 타설을 수행하지 않은 상태에서, 프리캐스트 콘크리트 기둥과 프리캐스트 콘크리트 보를 시공하며, 상기 보연결철물은 내부가 비어 있고 상면이 개방된 구조물로서, 단부에 형성된 관통공에 상기 보연결철근이 삽입되고, 상기 보연결철근의 단부가 프리캐스트 콘크리트 기둥에 끼워진 상태에서 상기 보연결철근의 표면에 형성된 나사산에 너트를 체결하여 보연결철근과 보연결철물을 체결하고, 상기 기둥연결철물은 내부가 비어 있고 측면 일부가 프리캐스트 콘크리트 기둥 외면으로 개방된 구조물로서, 하단에 형성된 관통공에 하층의 프리캐스트 콘크리트 기둥의 철근 단부가 삽입되고, 상기 하층의 프리캐스트 콘크리트 기둥의 철근 표면에 형성된 나사산에 너트를 체결하여 하층의 프리캐스트 콘크리트 기둥의 철근과 기둥연결철물을 체결하는 것을 특징으로 한다.
PRECAST CONCRETE COLUMN FOR USED BY CONTINUOUS CONSTRUCTION METHOD
연속 시공을 위한 프리캐스트 콘크리트 기둥
NA KUM OK (author) / YOO JONG WOO (author) / LIM EUN JI (author)
2020-02-20
Patent
Electronic Resource
Korean
PRECAST CONCRETE GIRDER FOR USED BY CONTINUOUS CONSTRUCTION METHOD
European Patent Office | 2021
PRECAST CONCRETE GIRDER FOR USED BY CONTINUOUS CONSTRUCTION METHOD
European Patent Office | 2020
|