A platform for research: civil engineering, architecture and urbanism
PREFABRICATED PRECAST PIER AND CONSTRUCTION METHOD THEREOF
The present invention relates to a prefabricated precast pier comprising: a pile (100) installed upwards from the ground surface; a coping bracket (200) including a cap (210) which has a hollow first insertion hole (212) with an open lower side, and a support plate (220) which is formed on a lower end of the cap (210) to protrude towards the outside in a radial direction along an outer circumference of the cap (210); and a coping (300) which has a hollow second insertion hole (310) with an open lower side. An upper end unit of the pile (100) is inserted into the first insertion hole (212), and the cap (210) is inserted into the second insertion hole (310). A lower surface of the coping (300) is settled on the support plate (220). An upper end unit of the pile (100) is inserted into the second insertion hole (310). Accordingly, the coping (300) is supported in a stable manner by a minimum simple configuration such that the manufacturing cost and construction cost of each component can be reduced, and the construction period can be reduced as well.
본 발명은 지면으로부터 상방으로 설치되는 파일(100); 하부가 개방된 중공의 제1삽입홀(212)이 형성되는 캡(210) 및 상기 캡(210)의 하단에 캡(210)의 외주를 따라 반경방향 외측으로 돌출형성되는 지지판(220)을 포함하여 구성되는 코핑브라켓(200); 및 하부가 개방된 중공의 제2삽입홀(310)이 형성되는 코핑(300)을 포함하는, 조립식 프리캐스트 잔교를 제공한다. 상기 제1삽입홀(212)에는 상기 파일(100)의 상단부가 삽입되며 상기 제2삽입홀(310)에는 상기 캡(210)이 삽입되고, 상기 코핑(300)의 하면은 상기 지지판(220)에 안착되고, 상기 파일(100)의 상단부는 상기 제2삽입홀(310)의 내측에 삽입되어 위치한다. 이에, 최소한의 단순한 구성으로 코핑(300)이 안정적으로 지지되므로 각 구성의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.
PREFABRICATED PRECAST PIER AND CONSTRUCTION METHOD THEREOF
The present invention relates to a prefabricated precast pier comprising: a pile (100) installed upwards from the ground surface; a coping bracket (200) including a cap (210) which has a hollow first insertion hole (212) with an open lower side, and a support plate (220) which is formed on a lower end of the cap (210) to protrude towards the outside in a radial direction along an outer circumference of the cap (210); and a coping (300) which has a hollow second insertion hole (310) with an open lower side. An upper end unit of the pile (100) is inserted into the first insertion hole (212), and the cap (210) is inserted into the second insertion hole (310). A lower surface of the coping (300) is settled on the support plate (220). An upper end unit of the pile (100) is inserted into the second insertion hole (310). Accordingly, the coping (300) is supported in a stable manner by a minimum simple configuration such that the manufacturing cost and construction cost of each component can be reduced, and the construction period can be reduced as well.
본 발명은 지면으로부터 상방으로 설치되는 파일(100); 하부가 개방된 중공의 제1삽입홀(212)이 형성되는 캡(210) 및 상기 캡(210)의 하단에 캡(210)의 외주를 따라 반경방향 외측으로 돌출형성되는 지지판(220)을 포함하여 구성되는 코핑브라켓(200); 및 하부가 개방된 중공의 제2삽입홀(310)이 형성되는 코핑(300)을 포함하는, 조립식 프리캐스트 잔교를 제공한다. 상기 제1삽입홀(212)에는 상기 파일(100)의 상단부가 삽입되며 상기 제2삽입홀(310)에는 상기 캡(210)이 삽입되고, 상기 코핑(300)의 하면은 상기 지지판(220)에 안착되고, 상기 파일(100)의 상단부는 상기 제2삽입홀(310)의 내측에 삽입되어 위치한다. 이에, 최소한의 단순한 구성으로 코핑(300)이 안정적으로 지지되므로 각 구성의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.
PREFABRICATED PRECAST PIER AND CONSTRUCTION METHOD THEREOF
조립식 프리캐스트 잔교 및 그 시공방법
JUN HO LEE (author) / DONG HYUCK LEE (author)
2020-10-13
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
PREFABRICATED PRECAST PIER AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2020
|PRECAST PIER AND PRECAST PIER CONSTRUCTION METHOD USING SAME
European Patent Office | 2016
|Prefabricated bridge pier and construction method thereof
European Patent Office | 2023
|