PC PC PC half-slab construction method for quick construction of precast concrete apartment house
The present invention provides a PC half-slab construction method for quick construction of a PC apartment house, which enables an upper-floor PC half-slab and PC walls to be installed when curing of lower-floor concrete is not completed, thereby shortening the construction period. According to an appropriate embodiment of the present invention, the steps of: (a) installing a lower-floor PC half-slab; (b) lifting lower-floor PC walls to erect and position the same on both ends of the lower-floor PC half-slab, and making the lower-floor PC walls stand on the lower-floor PC half-slab through fixing means; (c) lifting an upper-floor PC half-slab on a floor on top of the corresponding floor to be mounted on top of the lower-floor PC walls; and (d) pouring lower-floor topping concrete on the installed lower-floor PC half-slab, lifting upper-floor PC walls while curing of the lower-floor topping concrete is not completed, to be positioned on top of the lower-floor PC walls, and making the upper-floor PC walls stand on the upper-floor PC half-slab through wall self-standing means, are repeated sequentially up to the number of floors designed for an upper floor, and thus the construction is performed.
본 발명은 하부층 콘크리트의 양생이 완료되지 않은 상태에서 상부층 PC 하프슬래브 및 PC 벽체를 설치할 수 있도록 하여 공기 단축이 가능하도록 한 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법을 제공한다. 본 발명의 적절한 일 실시 형태에 따르면, (a) 하부층 PC 하프슬래브를 설치하는 단계와; (b) 하부층 PC 벽체를 양중하여 하부층 PC 하프슬래브의 양단부에 세워 위치시킨 후, 고정수단을 통해 하부층 PC 벽체를 하부층 PC 하프슬래브에 자립시켜 놓는 단계와; (c) 해당 층의 바로 위층에 상부층 PC 하프슬래브를 양중하여 하부층 PC 벽체의 상단에 거치되도록 설치하는 단계와; (d) 선 설치된 하부층 PC 하프슬래브에 하부층 토핑콘크리트를 타설한 후, 하부층 토핑콘크리트의 양생이 완료되지 않은 상태에서 상부층 PC 벽체를 양중하여 하부층 PC 벽체의 상부에 위치시킨 후, 벽체자립수단을 통해 상부층 PC 벽체를 상부층 PC 하프슬래브에 자립시켜 놓는 단계;를 상층으로 설계된 층수까지 순차적으로 반복하여 시공이 이루어지는 것을 특징으로 한다.
PC PC PC half-slab construction method for quick construction of precast concrete apartment house
The present invention provides a PC half-slab construction method for quick construction of a PC apartment house, which enables an upper-floor PC half-slab and PC walls to be installed when curing of lower-floor concrete is not completed, thereby shortening the construction period. According to an appropriate embodiment of the present invention, the steps of: (a) installing a lower-floor PC half-slab; (b) lifting lower-floor PC walls to erect and position the same on both ends of the lower-floor PC half-slab, and making the lower-floor PC walls stand on the lower-floor PC half-slab through fixing means; (c) lifting an upper-floor PC half-slab on a floor on top of the corresponding floor to be mounted on top of the lower-floor PC walls; and (d) pouring lower-floor topping concrete on the installed lower-floor PC half-slab, lifting upper-floor PC walls while curing of the lower-floor topping concrete is not completed, to be positioned on top of the lower-floor PC walls, and making the upper-floor PC walls stand on the upper-floor PC half-slab through wall self-standing means, are repeated sequentially up to the number of floors designed for an upper floor, and thus the construction is performed.
본 발명은 하부층 콘크리트의 양생이 완료되지 않은 상태에서 상부층 PC 하프슬래브 및 PC 벽체를 설치할 수 있도록 하여 공기 단축이 가능하도록 한 PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법을 제공한다. 본 발명의 적절한 일 실시 형태에 따르면, (a) 하부층 PC 하프슬래브를 설치하는 단계와; (b) 하부층 PC 벽체를 양중하여 하부층 PC 하프슬래브의 양단부에 세워 위치시킨 후, 고정수단을 통해 하부층 PC 벽체를 하부층 PC 하프슬래브에 자립시켜 놓는 단계와; (c) 해당 층의 바로 위층에 상부층 PC 하프슬래브를 양중하여 하부층 PC 벽체의 상단에 거치되도록 설치하는 단계와; (d) 선 설치된 하부층 PC 하프슬래브에 하부층 토핑콘크리트를 타설한 후, 하부층 토핑콘크리트의 양생이 완료되지 않은 상태에서 상부층 PC 벽체를 양중하여 하부층 PC 벽체의 상부에 위치시킨 후, 벽체자립수단을 통해 상부층 PC 벽체를 상부층 PC 하프슬래브에 자립시켜 놓는 단계;를 상층으로 설계된 층수까지 순차적으로 반복하여 시공이 이루어지는 것을 특징으로 한다.
PC PC PC half-slab construction method for quick construction of precast concrete apartment house
PC 공동주택의 급속 시공을 위한 PC 하프슬래브의 시공 방법
LEE JUNE SEONG (author) / JANG YE EUN (author)
2023-07-21
Patent
Electronic Resource
Korean
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
PC PC PC half-slab construction method for quick construction of precast concrete apartment house
European Patent Office | 2024
Precast concrete speeds apartment construction
Engineering Index Backfile | 1965
European Patent Office | 2021
European Patent Office | 2021
|HALF PRECAST MEMBER AND CONSTRUCTION METHOD FOR CONCRETE SLAB
European Patent Office | 2022
|