ERECTION METHOD OF STANDARD FOUNDATION
FIELD: construction.SUBSTANCE: pile field design is developed in the potential foundation area; after that, load on one pile is calculated; total number of piles of the same configuration with coordinate fixation to locality is determined at each pile sinking point, as well as depth of static sounding and location of static sounding points is determined. Then, static sounding is performed at pile sinking points by indentation of a conical tip of the probe into soil. Parameters characterising resistance of soil on cone and on side surface of the pile at introduction of the probe are recorded every 0.2 m as per TEST-K4 devicea. Calculation of carrying capacity and parameters at check points are recorded and entered to a database. Then, dynamic tests of each driven pile are performed. After the driven pile is kept for 5-35 days, field tests of test piles are performed by means of a static pile test device by static load, thus picking up pile settlement readings from measuring instruments at the specified loads, and values of the pile carrying capacity are determined. Then, correlation of the obtained results with static sounding data and pile sinking forces is performed considering engineering and geological conditions of the construction site. Then, mass sinking of the rest piles is performed. When the specified force on the pile being sunken is achieved, sinking is stopped and the pile is cut on a certain level above the ground surface.EFFECT: improving operating efficiency and reducing prime cost of erection and preliminary work, at erection of the foundation as a whole, at simultaneous improvement of durability and reliability.5 cl, 6 dwg
Заявляемое изобретение относится к области строительства и служит для возведения эталонных свайных фундаментов для строительства сооружений. Для повышения производительности и снижения себестоимости монтажных и подготовительных работ, при возведении фундамента в целом, при одновременном повышении долговечности, надежности на месте предполагаемого фундамента разрабатывали проект свайного поля, после чего рассчитывали нагрузки на одну сваю, определяли общее количество свай одной конфигурации с координатной привязкой к местности в каждой точке погружения свай, глубину статического зондирования и расположение точек статического зондирования. Далее в местах погружения свай выполняли статическое зондирование вдавливанием конического наконечника зонда в грунт , при этом через каждые 0,2 м по устройству «ТЕСТ-К4» фиксировали показатели, характеризующие сопротивление грунта на конус и на боковую поверхность сваи при внедрении зонда. Расчет несущей способности и показатели в контрольных точках фиксировали и заносили в базу данных. Затем проводили динамическое испытание каждой забитой сваи. После выдержки забитой сваи в течение 5-35 суток устройством для статического испытания свай проводили натурные испытания контрольных свай статической нагрузкой, снимая с измерительных приборов показания осадки сваи при заданных нагрузках, и определяли значения несущей способности сваи. Затем проводили корреляцию полученных результатов с данными статического зондирования и усилиями на погружение свай с учетом инженерно-геологических условий строительной площадки. Далее проводили массовое погружение остальных
ERECTION METHOD OF STANDARD FOUNDATION
FIELD: construction.SUBSTANCE: pile field design is developed in the potential foundation area; after that, load on one pile is calculated; total number of piles of the same configuration with coordinate fixation to locality is determined at each pile sinking point, as well as depth of static sounding and location of static sounding points is determined. Then, static sounding is performed at pile sinking points by indentation of a conical tip of the probe into soil. Parameters characterising resistance of soil on cone and on side surface of the pile at introduction of the probe are recorded every 0.2 m as per TEST-K4 devicea. Calculation of carrying capacity and parameters at check points are recorded and entered to a database. Then, dynamic tests of each driven pile are performed. After the driven pile is kept for 5-35 days, field tests of test piles are performed by means of a static pile test device by static load, thus picking up pile settlement readings from measuring instruments at the specified loads, and values of the pile carrying capacity are determined. Then, correlation of the obtained results with static sounding data and pile sinking forces is performed considering engineering and geological conditions of the construction site. Then, mass sinking of the rest piles is performed. When the specified force on the pile being sunken is achieved, sinking is stopped and the pile is cut on a certain level above the ground surface.EFFECT: improving operating efficiency and reducing prime cost of erection and preliminary work, at erection of the foundation as a whole, at simultaneous improvement of durability and reliability.5 cl, 6 dwg
Заявляемое изобретение относится к области строительства и служит для возведения эталонных свайных фундаментов для строительства сооружений. Для повышения производительности и снижения себестоимости монтажных и подготовительных работ, при возведении фундамента в целом, при одновременном повышении долговечности, надежности на месте предполагаемого фундамента разрабатывали проект свайного поля, после чего рассчитывали нагрузки на одну сваю, определяли общее количество свай одной конфигурации с координатной привязкой к местности в каждой точке погружения свай, глубину статического зондирования и расположение точек статического зондирования. Далее в местах погружения свай выполняли статическое зондирование вдавливанием конического наконечника зонда в грунт , при этом через каждые 0,2 м по устройству «ТЕСТ-К4» фиксировали показатели, характеризующие сопротивление грунта на конус и на боковую поверхность сваи при внедрении зонда. Расчет несущей способности и показатели в контрольных точках фиксировали и заносили в базу данных. Затем проводили динамическое испытание каждой забитой сваи. После выдержки забитой сваи в течение 5-35 суток устройством для статического испытания свай проводили натурные испытания контрольных свай статической нагрузкой, снимая с измерительных приборов показания осадки сваи при заданных нагрузках, и определяли значения несущей способности сваи. Затем проводили корреляцию полученных результатов с данными статического зондирования и усилиями на погружение свай с учетом инженерно-геологических условий строительной площадки. Далее проводили массовое погружение остальных
ERECTION METHOD OF STANDARD FOUNDATION
СПОСОБ ВОЗВЕДЕНИЯ ЭТАЛОННОГО ФУНДАМЕНТА
LUZHBIN MIKHAIL DMITRIEVICH (author)
2015-07-20
Patent
Electronic Resource
Russian
IPC:
E02D
FOUNDATIONS
,
Gründungen
METHOD OF ERECTION OF SLAB REINFORCED CONCRETE FOUNDATION
European Patent Office | 2019
|DESIGN AND METHOD FOR ERECTION OF NON-PENETRATABLE FOUNDATION
European Patent Office | 2015
|