A platform for research: civil engineering, architecture and urbanism
FALSEWORK ELEMENT
FIELD: construction.SUBSTANCE: invention relates to a method to sealing holes in a geomembrane, connected to a pile in the field of construction. In the method of the pile (1) sealing in it′s bases (2) in the field of construction a hollow falsework element (3) is used. The method includes the following stages: 1) application of a protective layer (4) on the base (2); 2) introduction of the pile (1) into the base (2), besides, the pile (1) is arranged so that it penetrates via the protective layer (2); 3) application of a hollow element (3) of the falsework along the central longitudinal axis of the pile (1), besides, the hollow element (3) of the falsework surrounds the pile (1); 4) introduction of mineral binding substances (5) into the intermediate space (12) between the pile (1) and the hollow element (3) of the falsework; 5) connection of the protective layer (4) and the hollow element (3) of the falsework. The hollow element (3) of the falsework at the side facing the pile is equipped with a contact layer (6), which contains a composite layer (7) of a porous material and/or a sealant (8). An introduced mineral binder (5) binds substantially firmly with the contact layer and thus prevents the penetration of moisture from the base beyond the hollow element of the falsework. By this method the falsework removal may be excluded, as well as the additional stage of work, because the hollow element of the falsework remains in place as a part of the structure and serves for sealing.EFFECT: invention provides for reliable sealing of the pile and base joint.12 cl, 3 dwg
Изобретение относится к способу герметизации отверстия в геомембране, связанному со сваей в области строительства. В способе герметизации свай (1) в основаниях (2) в области строительства используется пустотелый элемент (3) опалубки. Способ включает следующие этапы: 1) нанесение защитного слоя (4) на основание (2); 2) внедрение сваи (1) в основание (2), причем свая (1) расположена так, чтобы проникать через защитный слой (2); 3) нанесение пустотелого элемента (3) опалубки вдоль центральной продольной оси сваи (1), причем пустотелый элемент (3) опалубки окружает сваю (1); 4) введение минеральных связующих веществ (5) в промежуточное пространство (12) между сваей (1) и пустотелым элементом (3) опалубки; 5) соединение защитного слоя (4) и пустотелого элемента (3) опалубки. Пустотелый элемент (3) опалубки на стороне, обращенной к свае, снабжен контактным слоем (6), который содержит композитный слой (7) пористого материала и/или герметик (8). Введенное минеральное связующее (5) связывается, по существу, прочно с контактным слоем и, таким образом, предотвращает проникновение влаги из основания за пустотелый элемент опалубки. По этому способу можно исключить извлечение опалубки и, таким образом, дополнительный этап работы, поскольку пустотелый элемент опалубки остается на месте как часть конструкции и выполняет функцию герметизации. Технический результат - обеспечение надежной герметизации стыка сваи и основания. 11 з.п. ф-лы, 3 ил.
FALSEWORK ELEMENT
FIELD: construction.SUBSTANCE: invention relates to a method to sealing holes in a geomembrane, connected to a pile in the field of construction. In the method of the pile (1) sealing in it′s bases (2) in the field of construction a hollow falsework element (3) is used. The method includes the following stages: 1) application of a protective layer (4) on the base (2); 2) introduction of the pile (1) into the base (2), besides, the pile (1) is arranged so that it penetrates via the protective layer (2); 3) application of a hollow element (3) of the falsework along the central longitudinal axis of the pile (1), besides, the hollow element (3) of the falsework surrounds the pile (1); 4) introduction of mineral binding substances (5) into the intermediate space (12) between the pile (1) and the hollow element (3) of the falsework; 5) connection of the protective layer (4) and the hollow element (3) of the falsework. The hollow element (3) of the falsework at the side facing the pile is equipped with a contact layer (6), which contains a composite layer (7) of a porous material and/or a sealant (8). An introduced mineral binder (5) binds substantially firmly with the contact layer and thus prevents the penetration of moisture from the base beyond the hollow element of the falsework. By this method the falsework removal may be excluded, as well as the additional stage of work, because the hollow element of the falsework remains in place as a part of the structure and serves for sealing.EFFECT: invention provides for reliable sealing of the pile and base joint.12 cl, 3 dwg
Изобретение относится к способу герметизации отверстия в геомембране, связанному со сваей в области строительства. В способе герметизации свай (1) в основаниях (2) в области строительства используется пустотелый элемент (3) опалубки. Способ включает следующие этапы: 1) нанесение защитного слоя (4) на основание (2); 2) внедрение сваи (1) в основание (2), причем свая (1) расположена так, чтобы проникать через защитный слой (2); 3) нанесение пустотелого элемента (3) опалубки вдоль центральной продольной оси сваи (1), причем пустотелый элемент (3) опалубки окружает сваю (1); 4) введение минеральных связующих веществ (5) в промежуточное пространство (12) между сваей (1) и пустотелым элементом (3) опалубки; 5) соединение защитного слоя (4) и пустотелого элемента (3) опалубки. Пустотелый элемент (3) опалубки на стороне, обращенной к свае, снабжен контактным слоем (6), который содержит композитный слой (7) пористого материала и/или герметик (8). Введенное минеральное связующее (5) связывается, по существу, прочно с контактным слоем и, таким образом, предотвращает проникновение влаги из основания за пустотелый элемент опалубки. По этому способу можно исключить извлечение опалубки и, таким образом, дополнительный этап работы, поскольку пустотелый элемент опалубки остается на месте как часть конструкции и выполняет функцию герметизации. Технический результат - обеспечение надежной герметизации стыка сваи и основания. 11 з.п. ф-лы, 3 ил.
FALSEWORK ELEMENT
ЭЛЕМЕНТ ОПАЛУБКИ
KLOSTER MAGNUS (author) / MEJER KLAUS (author) / VEBER ULRIKH K (author)
2016-04-10
Patent
Electronic Resource
Russian
IPC:
E02D
FOUNDATIONS
,
Gründungen
NTIS | 1971
TIBKAT | 1983
|