A platform for research: civil engineering, architecture and urbanism
TWO-STEP CROSSHEAD OF COMBINED STRUCTURE
FIELD: construction.SUBSTANCE: two-step crosshead includes an entry threshold 1, baffle steps 2, 10 and enclosing side walls 17. At the base of steps 2, 10 gabion mattresses 3, 11 with a thickness of 0.3-0.5 m are laid over the entire area. Cellular rectangular box constructions of reinforced concrete square-section beams are arranged on top of the gabion mattresses 3, 11. At the end of each step 2, 10, the height of the transverse beam is increased to 1.5 m and more for its operation as a baffle wall 7, 15. The baffle wall 7 is combined with a reinforced concrete drainage wall 8 at the end of the first step 2, and the baffle wall 15 is combined with a transverse beam 14 at the end of the second step 10. The box structure cells above the gabion mattresses 3, 11 of each step are loaded with macrofragmental stone material 9, 16 with a thickness of 0.5-1 m. At the same time, in the baffles of each step, the reinforced concrete beams of the box structure are rigidly connected to one another and to the drainage wall and are delimited with side enclosing walls 17 with expansion joints. The proposed two-step crosshead as a coupling structure can be most effectively used to stabilise eroded channel processes on mountain and foothill regulated areas of urbanized zones of small rivers and earth wasteways where the concentrated difference in the channel marks does not exceed 3…3.5 m.EFFECT: effective excess energy dissipation of water flows and operation reliability of the entire structure.2 cl, 4 dwg
Изобретение относится к гидротехническому строительству и может быть использовано в качестве сопрягающего сооружения для регулирования участков малых рек и каналов в земляных руслах на горных и предгорных их участках. Двухступенчатый перепад включает входной порог 1, ступени-гасители энергии 2, 10 и боковые ограждающие стенки 17. В основании ступеней 2, 10 по всей площади уложены габионные тюфяки 3, 11 толщиной 0,3-0,5 м. Сверху габионных тюфяков 3, 11 устроены ячеистые прямоугольные коробчатые конструкции из железобетонных балок квадратного сечения. В конце каждой ступени 2, 10 высота поперечной балки наращена до 1,5 м и более для ее работы в качестве водобойной стенки 7, 15. Водобойная стенка 7 совмещена с железобетонной водосливной стенкой 8 в конце первой ступени 2, а водобойная стенка 15 совмещена с поперечной балкой 14 в конце второй ступени 10. Ячейки коробчатой конструкции над габионными тюфяками 3, 11 каждой ступени загружены крупнообломочным каменным материалом 9, 16 толщиной 0,5-1 м. Вместе с тем в гасителях энергии каждой ступени железобетонные балки коробчатой конструкции жестко связаны между собой и с водосливной стенкой и разграничены с боковыми ограждающими стенками 17 деформационными швами. Наиболее эффективно может быть использован предлагаемый двухступенчатый перепад в качестве сопрягающего сооружения, для стабилизации размываемых русловых процессов на горных и предгорных регулируемых участках урбанизированных зон малых рек и земляных сбросных каналов, где сосредоточенный перепад отметок русел не превышает 3…3.5 м. Обеспечивается эффективное гашение избыточной энергии водных потоков и надежность работы всего сооружения. 1 з.п. ф-лы, 4 ил.
TWO-STEP CROSSHEAD OF COMBINED STRUCTURE
FIELD: construction.SUBSTANCE: two-step crosshead includes an entry threshold 1, baffle steps 2, 10 and enclosing side walls 17. At the base of steps 2, 10 gabion mattresses 3, 11 with a thickness of 0.3-0.5 m are laid over the entire area. Cellular rectangular box constructions of reinforced concrete square-section beams are arranged on top of the gabion mattresses 3, 11. At the end of each step 2, 10, the height of the transverse beam is increased to 1.5 m and more for its operation as a baffle wall 7, 15. The baffle wall 7 is combined with a reinforced concrete drainage wall 8 at the end of the first step 2, and the baffle wall 15 is combined with a transverse beam 14 at the end of the second step 10. The box structure cells above the gabion mattresses 3, 11 of each step are loaded with macrofragmental stone material 9, 16 with a thickness of 0.5-1 m. At the same time, in the baffles of each step, the reinforced concrete beams of the box structure are rigidly connected to one another and to the drainage wall and are delimited with side enclosing walls 17 with expansion joints. The proposed two-step crosshead as a coupling structure can be most effectively used to stabilise eroded channel processes on mountain and foothill regulated areas of urbanized zones of small rivers and earth wasteways where the concentrated difference in the channel marks does not exceed 3…3.5 m.EFFECT: effective excess energy dissipation of water flows and operation reliability of the entire structure.2 cl, 4 dwg
Изобретение относится к гидротехническому строительству и может быть использовано в качестве сопрягающего сооружения для регулирования участков малых рек и каналов в земляных руслах на горных и предгорных их участках. Двухступенчатый перепад включает входной порог 1, ступени-гасители энергии 2, 10 и боковые ограждающие стенки 17. В основании ступеней 2, 10 по всей площади уложены габионные тюфяки 3, 11 толщиной 0,3-0,5 м. Сверху габионных тюфяков 3, 11 устроены ячеистые прямоугольные коробчатые конструкции из железобетонных балок квадратного сечения. В конце каждой ступени 2, 10 высота поперечной балки наращена до 1,5 м и более для ее работы в качестве водобойной стенки 7, 15. Водобойная стенка 7 совмещена с железобетонной водосливной стенкой 8 в конце первой ступени 2, а водобойная стенка 15 совмещена с поперечной балкой 14 в конце второй ступени 10. Ячейки коробчатой конструкции над габионными тюфяками 3, 11 каждой ступени загружены крупнообломочным каменным материалом 9, 16 толщиной 0,5-1 м. Вместе с тем в гасителях энергии каждой ступени железобетонные балки коробчатой конструкции жестко связаны между собой и с водосливной стенкой и разграничены с боковыми ограждающими стенками 17 деформационными швами. Наиболее эффективно может быть использован предлагаемый двухступенчатый перепад в качестве сопрягающего сооружения, для стабилизации размываемых русловых процессов на горных и предгорных регулируемых участках урбанизированных зон малых рек и земляных сбросных каналов, где сосредоточенный перепад отметок русел не превышает 3…3.5 м. Обеспечивается эффективное гашение избыточной энергии водных потоков и надежность работы всего сооружения. 1 з.п. ф-лы, 4 ил.
TWO-STEP CROSSHEAD OF COMBINED STRUCTURE
ДВУХСТУПЕНЧАТЫЙ ПЕРЕПАД КОМБИНИРОВАННОЙ КОНСТРУКЦИИ
KURBANOV SALIGADZHI OMAROVICH (author) / SOZAEV AKHMED ABDULKERIMOVICH (author) / ULBASHEVA SURAT ALIEVNA (author)
2017-10-18
Patent
Electronic Resource
Russian
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
METHOD OF ERECTING TWO-STEP CROSSHEAD OF COMBINED STRUCTURE