A platform for research: civil engineering, architecture and urbanism
METHOD OF ERECTING TWO-STEP CROSSHEAD OF COMBINED STRUCTURE
FIELD: construction.SUBSTANCE: method of erecting a two-step crosshead includes making an inlet overflow weir, baffle steps and side walls of reinforced concrete. At the base of each baffle step, a gabion mattress with a thickness of 0.3-0.5 mis laid. Above the gabion mattress of each step, a cellular rectangular box-shaped structure of reinforced concrete beams square in section is arranged. At the end of each step, the height of the transverse beam is increased to 1.5 m and more for its operation as a baffle wall. The box structure cells above the gabion mattresses of each step are loaded with macrofragmental stone material with the thickness of 0.5-1 m. In the baffles of each step, the reinforced concrete beams of the box-shaped structure are rigidly connected to one another and to the baffle wall and delimited with side enclosing walls by means of expansion joints. The method of erecting a two-step crosshead of a combined structure is intended to stabilise eroded channel processes on mountain and foothill regulated areas of urbanized zones of small rivers and earth wasteways, where the concentrated difference in the channel marks does not exceed 3-3.5 m.EFFECT: effective excess energy dissipation of water flows and operation reliability of the entire structure.2 cl, 4 dwg
Изобретение относится к гидротехническому строительству и может быть использовано в качестве сопрягающего сооружения для регулирования участков малых рек и каналов в земляных руслах на горных и предгорных их участках. Способ возведения двухступенчатого перепада включает выполнение входного водосливного порога, ступеней-гасителей энергии и боковых стенок из железобетона. В основании каждой ступени-гасителя энергии по всей площади укладывают габионный тюфяк толщиной 0,3-0,5 м. Сверху габионного тюфяка каждой ступени устраивают ячеистую прямоугольную коробчатую конструкцию из железобетонных балок квадратного сечения. В конце каждой ступени высоту поперечной балки наращивают до 1,5 м и более для ее работы в качестве водобойной стенки. Ячейки коробчатой конструкции над габионными тюфяками каждой ступени загружают крупнообломочным каменным материалом толщиной 0,5-1 м. В гасителях энергии каждой ступени железобетонные балки коробчатой конструкции жестко связывают между собой и с водосливной стенкой и разграничивают с боковыми ограждающими стенками с помощью деформационных швов. Способ возведения двухступенчатого перепада комбинированной конструкции предназначен для стабилизации размываемых русловых процессов на горных и предгорных регулируемых участках урбанизированных зон малых рек и земляных сбросных каналов, где сосредоточенный перепад отметок русел не превышает 3-3.5 м. Обеспечивается эффективное гашение избыточной энергии водных потоков и надежность работы всего сооружения. 1 з.п. ф-лы, 4 ил.
METHOD OF ERECTING TWO-STEP CROSSHEAD OF COMBINED STRUCTURE
FIELD: construction.SUBSTANCE: method of erecting a two-step crosshead includes making an inlet overflow weir, baffle steps and side walls of reinforced concrete. At the base of each baffle step, a gabion mattress with a thickness of 0.3-0.5 mis laid. Above the gabion mattress of each step, a cellular rectangular box-shaped structure of reinforced concrete beams square in section is arranged. At the end of each step, the height of the transverse beam is increased to 1.5 m and more for its operation as a baffle wall. The box structure cells above the gabion mattresses of each step are loaded with macrofragmental stone material with the thickness of 0.5-1 m. In the baffles of each step, the reinforced concrete beams of the box-shaped structure are rigidly connected to one another and to the baffle wall and delimited with side enclosing walls by means of expansion joints. The method of erecting a two-step crosshead of a combined structure is intended to stabilise eroded channel processes on mountain and foothill regulated areas of urbanized zones of small rivers and earth wasteways, where the concentrated difference in the channel marks does not exceed 3-3.5 m.EFFECT: effective excess energy dissipation of water flows and operation reliability of the entire structure.2 cl, 4 dwg
Изобретение относится к гидротехническому строительству и может быть использовано в качестве сопрягающего сооружения для регулирования участков малых рек и каналов в земляных руслах на горных и предгорных их участках. Способ возведения двухступенчатого перепада включает выполнение входного водосливного порога, ступеней-гасителей энергии и боковых стенок из железобетона. В основании каждой ступени-гасителя энергии по всей площади укладывают габионный тюфяк толщиной 0,3-0,5 м. Сверху габионного тюфяка каждой ступени устраивают ячеистую прямоугольную коробчатую конструкцию из железобетонных балок квадратного сечения. В конце каждой ступени высоту поперечной балки наращивают до 1,5 м и более для ее работы в качестве водобойной стенки. Ячейки коробчатой конструкции над габионными тюфяками каждой ступени загружают крупнообломочным каменным материалом толщиной 0,5-1 м. В гасителях энергии каждой ступени железобетонные балки коробчатой конструкции жестко связывают между собой и с водосливной стенкой и разграничивают с боковыми ограждающими стенками с помощью деформационных швов. Способ возведения двухступенчатого перепада комбинированной конструкции предназначен для стабилизации размываемых русловых процессов на горных и предгорных регулируемых участках урбанизированных зон малых рек и земляных сбросных каналов, где сосредоточенный перепад отметок русел не превышает 3-3.5 м. Обеспечивается эффективное гашение избыточной энергии водных потоков и надежность работы всего сооружения. 1 з.п. ф-лы, 4 ил.
METHOD OF ERECTING TWO-STEP CROSSHEAD OF COMBINED STRUCTURE
СПОСОБ ВОЗВЕДЕНИЯ ДВУХСТУПЕНЧАТОГО ПЕРЕПАДА КОМБИНИРОВАННОЙ КОНСТРУКЦИИ
KURBANOV SALIGADZHI OMAROVICH (author) / SOZAEV AKHMED ABDULKERIMOVICH (author) / KHASANOV MUSSA MAGOMETOVICH (author)
2017-10-18
Patent
Electronic Resource
Russian
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau