A platform for research: civil engineering, architecture and urbanism
METHOD OF WATERPROOFING MINE WORKINGS OF POTASSIUM MINES
FIELD: mining.SUBSTANCE: invention relates to the field of mining, namely to the underground mining of potash deposits. Method of waterproofing the mine workings of potash mines includes penetration of the cut-off stone under the concrete lintel, covering the surface of the cut with a waterproofing material and erecting the concrete lintel body. In the development of a possible brine, dry bulk waterproofing materials are placed to increase the viscosity of the brine, and then they create barriers from the filtering fabric to keep waterproofing materials from being washed away by the brine flow. Waterproofing materials are placed across the entire working width to a height equal to about 2/3 of the working height. If necessary, waterproofing materials are placed immediately in several workings with different absolute elevations, this creates the conditions for the creation of simultaneous brine from all workings.EFFECT: method allows to increase the reliability of the waterproofing construction and to extend its service life by preventing the walls of the mine from dissolving and the possibility of brine penetration through the pores and cracks of the surrounding rocks.4 cl, 1 dwg
Изобретение относится к области горного дела, а именно к подземной разработке месторождений калийных солей. Способ гидроизоляции горных выработок калийных рудников включает в себя проходку вруба под бетонную перемычку, покрытие поверхности вруба гидроизоляционным материалом и возведение бетонного тела перемычки. В выработке со стороны возможного рассолопритока размещают сухие сыпучие гидроизоляционные материалы, увеличивающие вязкость рассола, а затем создают преграды из фильтрующей ткани для удержания гидроизоляционных материалов от их размыва потоком рассола. Гидроизоляционные материалы размещают по всей ширине выработки на высоту, равную около 2/3 высоты выработки. При необходимости гидроизоляционные материалы размещаются сразу в нескольких выработках с разными абсолютными высотными отметками, при этом создаются условия для создания одновременного подпора рассола со стороны всех выработок. Способ позволяет повысить надежность гидроизоляционного сооружения и продлить срок его службы за счет предотвращения растворения стенок выработки и возможности проникновения рассола по порам и трещинам вмещающих пород. 3 з.п. ф-лы, 1 ил.
METHOD OF WATERPROOFING MINE WORKINGS OF POTASSIUM MINES
FIELD: mining.SUBSTANCE: invention relates to the field of mining, namely to the underground mining of potash deposits. Method of waterproofing the mine workings of potash mines includes penetration of the cut-off stone under the concrete lintel, covering the surface of the cut with a waterproofing material and erecting the concrete lintel body. In the development of a possible brine, dry bulk waterproofing materials are placed to increase the viscosity of the brine, and then they create barriers from the filtering fabric to keep waterproofing materials from being washed away by the brine flow. Waterproofing materials are placed across the entire working width to a height equal to about 2/3 of the working height. If necessary, waterproofing materials are placed immediately in several workings with different absolute elevations, this creates the conditions for the creation of simultaneous brine from all workings.EFFECT: method allows to increase the reliability of the waterproofing construction and to extend its service life by preventing the walls of the mine from dissolving and the possibility of brine penetration through the pores and cracks of the surrounding rocks.4 cl, 1 dwg
Изобретение относится к области горного дела, а именно к подземной разработке месторождений калийных солей. Способ гидроизоляции горных выработок калийных рудников включает в себя проходку вруба под бетонную перемычку, покрытие поверхности вруба гидроизоляционным материалом и возведение бетонного тела перемычки. В выработке со стороны возможного рассолопритока размещают сухие сыпучие гидроизоляционные материалы, увеличивающие вязкость рассола, а затем создают преграды из фильтрующей ткани для удержания гидроизоляционных материалов от их размыва потоком рассола. Гидроизоляционные материалы размещают по всей ширине выработки на высоту, равную около 2/3 высоты выработки. При необходимости гидроизоляционные материалы размещаются сразу в нескольких выработках с разными абсолютными высотными отметками, при этом создаются условия для создания одновременного подпора рассола со стороны всех выработок. Способ позволяет повысить надежность гидроизоляционного сооружения и продлить срок его службы за счет предотвращения растворения стенок выработки и возможности проникновения рассола по порам и трещинам вмещающих пород. 3 з.п. ф-лы, 1 ил.
METHOD OF WATERPROOFING MINE WORKINGS OF POTASSIUM MINES
Способ гидроизоляции горных выработок калийных рудников
RUSAKOV MIKHAIL ILICH (author) / ALYMENKO DANIIL NIKOLAEVICH (author)
2019-03-12
Patent
Electronic Resource
Russian
IPC:
E21C
Bergbau oder Steinbruchbetrieb
,
MINING OR QUARRYING
/
E02D
FOUNDATIONS
,
Gründungen
/
E21D
SHAFTS
,
Schächte
/
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
Abandoned mine workings manual
TIBKAT | 2019
|Construction Over Abandoned Mine Workings
NTIS | 1984
|Construction over abandoned mine workings
TIBKAT | 2002
|Stabilising mine workings with pfa grouts
British Library Online Contents | 2006
|Water flow into undersea mine workings
Online Contents | 1983
|