A platform for research: civil engineering, architecture and urbanism
CRANE BEAM
FIELD: construction.SUBSTANCE: invention relates to construction, namely, to crane girders. Crane girder consists of upper belt (1) in form of steel pipe (2), filled with concrete (3), brake structure (4), posts (5) with end (6) and tightening (7), passed through end (6) in posts (5) and fixed on support sections (8) of upper belt (1). Pins (9) are horizontally fitted through section of upper belt (1), to which clamps (10) for attachment of crane rail (11) are attached. Walls of steel pipe (2) of upper belt (1) have perforations (12). Brake structure (4) consists of steel horizontal truss (13) and steel beam (14). Stands (5) made of steel pipes uniformly arranged along the length of upper belt (1), have variable length f, increasing from support sections (8) to middle span of beam L. Tightening (7), made in form of reinforcement rods or ropes, located along the span of the beam L in accordance with the envelope curve of the bending moment in the beam. Support sections (8) are made as composite of sheet steel and rigidly fixed to steel pipe (2) of upper belt (1).EFFECT: reduced material consumption of crane girder.3 cl, 3 dwg
Изобретение относится к строительству, а именно к подкрановым балкам. Подкрановая балка состоит из верхнего пояса (1) в виде стальной трубы (2), заполненной бетоном (3), тормозной конструкции (4), стоек (5) с концевиками (6) и затяжки (7), пропущенной через концевики (6) в стойках (5) и закрепленной на опорных участках (8) верхнего пояса (1). Через сечение верхнего пояса (1) горизонтально устанавливаются шпильки (9), к которым прикрепляются зажимы (10) для крепления кранового рельса (11). Стенки стальной трубы (2) верхнего пояса (1) имеют перфорации (12). Тормозная конструкция (4) состоит из стальной горизонтальной фермы (13) и стальной балки (14). Стойки (5), выполняемые из стальных труб, равномерно располагаемые по длине верхнего пояса (1), имеют переменную длину f, увеличивающуюся от опорных участков (8) к середине пролета балки L. Затяжка (7), выполняемая в виде арматурных стержней или канатов, располагается по пролету балки L в соответствии с огибающей эпюрой изгибающего момента в балке. Опорные участки (8) выполняются составными из листовой стали и жестко закрепляются к стальной трубе (2) верхнего пояса (1). Достигается снижение материалоемкости подкрановой балки. 2 з.п. ф-лы, 3 ил.
CRANE BEAM
FIELD: construction.SUBSTANCE: invention relates to construction, namely, to crane girders. Crane girder consists of upper belt (1) in form of steel pipe (2), filled with concrete (3), brake structure (4), posts (5) with end (6) and tightening (7), passed through end (6) in posts (5) and fixed on support sections (8) of upper belt (1). Pins (9) are horizontally fitted through section of upper belt (1), to which clamps (10) for attachment of crane rail (11) are attached. Walls of steel pipe (2) of upper belt (1) have perforations (12). Brake structure (4) consists of steel horizontal truss (13) and steel beam (14). Stands (5) made of steel pipes uniformly arranged along the length of upper belt (1), have variable length f, increasing from support sections (8) to middle span of beam L. Tightening (7), made in form of reinforcement rods or ropes, located along the span of the beam L in accordance with the envelope curve of the bending moment in the beam. Support sections (8) are made as composite of sheet steel and rigidly fixed to steel pipe (2) of upper belt (1).EFFECT: reduced material consumption of crane girder.3 cl, 3 dwg
Изобретение относится к строительству, а именно к подкрановым балкам. Подкрановая балка состоит из верхнего пояса (1) в виде стальной трубы (2), заполненной бетоном (3), тормозной конструкции (4), стоек (5) с концевиками (6) и затяжки (7), пропущенной через концевики (6) в стойках (5) и закрепленной на опорных участках (8) верхнего пояса (1). Через сечение верхнего пояса (1) горизонтально устанавливаются шпильки (9), к которым прикрепляются зажимы (10) для крепления кранового рельса (11). Стенки стальной трубы (2) верхнего пояса (1) имеют перфорации (12). Тормозная конструкция (4) состоит из стальной горизонтальной фермы (13) и стальной балки (14). Стойки (5), выполняемые из стальных труб, равномерно располагаемые по длине верхнего пояса (1), имеют переменную длину f, увеличивающуюся от опорных участков (8) к середине пролета балки L. Затяжка (7), выполняемая в виде арматурных стержней или канатов, располагается по пролету балки L в соответствии с огибающей эпюрой изгибающего момента в балке. Опорные участки (8) выполняются составными из листовой стали и жестко закрепляются к стальной трубе (2) верхнего пояса (1). Достигается снижение материалоемкости подкрановой балки. 2 з.п. ф-лы, 3 ил.
CRANE BEAM
Подкрановая балка
VESELOV VITALIJ VLADISLAVOVICH (author) / PERMINOVA TATYANA ANDREEVNA (author)
2021-01-15
Patent
Electronic Resource
Russian
Construction method for gate dam portal crane beam and gate dam portal crane beam structure
European Patent Office | 2021
|Crane beam for steel structure workshop and construction method and mounting method of crane beam
European Patent Office | 2021
|