A platform for research: civil engineering, architecture and urbanism
Controlling backflow from drilling with hollow rebar and grouting
Backflow during installation of a ground anchor is controlled using a preventer, and the preventer is removed during curing of grout and backflow. A cylinder may be inserted at least partially into a structure, and the preventer placed or attached atop the cylinder. A hollow bar may be extended through the preventer and cylinder into one or more layers of materials beyond the cylinder. Grout may be delivered to the layer(s) through the hollow bar, which may cause a viscous backflow to flow into the cylinder and preventer. During application of the grout, the preventer may be used to control a rate of backflow. After application of the grout, the preventer may put into an open position, and a seal assembly forced down the hollow bar, through an interior cavity of the preventer, to a position below the preventer, after which the preventer may be removed while the grout and backflow cure.
Controlling backflow from drilling with hollow rebar and grouting
Backflow during installation of a ground anchor is controlled using a preventer, and the preventer is removed during curing of grout and backflow. A cylinder may be inserted at least partially into a structure, and the preventer placed or attached atop the cylinder. A hollow bar may be extended through the preventer and cylinder into one or more layers of materials beyond the cylinder. Grout may be delivered to the layer(s) through the hollow bar, which may cause a viscous backflow to flow into the cylinder and preventer. During application of the grout, the preventer may be used to control a rate of backflow. After application of the grout, the preventer may put into an open position, and a seal assembly forced down the hollow bar, through an interior cavity of the preventer, to a position below the preventer, after which the preventer may be removed while the grout and backflow cure.
Controlling backflow from drilling with hollow rebar and grouting
ASCHENBROICH HORST K (author)
2021-04-27
Patent
Electronic Resource
English
CONTROLLING BACKFLOW FROM DRILLING WITH HOLLOW REBAR AND GROUTING
European Patent Office | 2020
|CONTROLLING BACKFLOW FROM DRILLING WITH HOLLOW REBAR AND GROUTING
European Patent Office | 2022
|HOLLOW REBAR FOR POST-GROUTING THE BASE OF REINFORCED CONCRETE DRILLED SHAFTS
European Patent Office | 2022
|