A platform for research: civil engineering, architecture and urbanism
Work machine and system including work machine
Work contents by a work implement are more accurately distinguished. Work contents by the work implement include at least two of dozing, piling, and excavation and loading. A controller distinguishes work contents by the work implement. The controller identifies work contents during a period from start of the works until end of the works based on a result of distinction between at least two temporally distant work contents in work records during the period from the start of the works until the end of the works.
Work machine and system including work machine
Work contents by a work implement are more accurately distinguished. Work contents by the work implement include at least two of dozing, piling, and excavation and loading. A controller distinguishes work contents by the work implement. The controller identifies work contents during a period from start of the works until end of the works based on a result of distinction between at least two temporally distant work contents in work records during the period from the start of the works until the end of the works.
Work machine and system including work machine
DAIMON MASAKI (author)
2022-06-28
Patent
Electronic Resource
English