A platform for research: civil engineering, architecture and urbanism
A method of assembling a wind turbine comprising placing a tower base in an upright position. The tower base includes a tower base guide rail and a carriage. The carriage is movable along the tower base guide rail and includes a crane attached thereto. The method further comprises connecting a first tower body member to the tower base to form a turbine tower. The first tower body member includes a first tower body guide rail and is connected to the tower base in a manner such that the tower base guide rail axially aligns with the first tower body guide rail to collectively form a rail track. The carriage is movable up and down the turbine tower along the rail track.
A method of assembling a wind turbine comprising placing a tower base in an upright position. The tower base includes a tower base guide rail and a carriage. The carriage is movable along the tower base guide rail and includes a crane attached thereto. The method further comprises connecting a first tower body member to the tower base to form a turbine tower. The first tower body member includes a first tower body guide rail and is connected to the tower base in a manner such that the tower base guide rail axially aligns with the first tower body guide rail to collectively form a rail track. The carriage is movable up and down the turbine tower along the rail track.
METHOD OF ASSEMBLING A WIND TURBINE
DAVIS DANIEL E (author)
2016-12-22
Patent
Electronic Resource
English
WIND TURBINE TOWER AND WIND TURBINE AND METHOD FOR ASSEMBLING WIND TURBINE TOWER
European Patent Office | 2018
|