A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION DEVICE AND METHOD FOR OFFSHORE WIND TURBINE FOUNDATION WITH PILING PERFORMED LATER
A construction device for an offshore wind turbine foundation with piling performed later. The construction device comprises an offshore wind turbine foundation (1), a pile casing (2) and a sleeve (3). The pile casing (2) is used for the installation of a steel pile (4) and arranged at the bottom of the offshore wind turbine foundation (1). The lower end of the sleeve (3) is detachably connected with the upper end of the pile casing (2). A construction method for an offshore wind turbine foundation with piling performed later is also provided.
CONSTRUCTION DEVICE AND METHOD FOR OFFSHORE WIND TURBINE FOUNDATION WITH PILING PERFORMED LATER
A construction device for an offshore wind turbine foundation with piling performed later. The construction device comprises an offshore wind turbine foundation (1), a pile casing (2) and a sleeve (3). The pile casing (2) is used for the installation of a steel pile (4) and arranged at the bottom of the offshore wind turbine foundation (1). The lower end of the sleeve (3) is detachably connected with the upper end of the pile casing (2). A construction method for an offshore wind turbine foundation with piling performed later is also provided.
CONSTRUCTION DEVICE AND METHOD FOR OFFSHORE WIND TURBINE FOUNDATION WITH PILING PERFORMED LATER
ZHU RONGHUA (author) / TIAN ZHENYA (author)
2018-08-09
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
Construction device and method for offshore wind turbine foundation with piling performed later
European Patent Office | 2019
|Construction device and method for offshore wind turbine foundation with piling performed later
European Patent Office | 2015
|Offshore wind turbine foundation and construction method thereof
European Patent Office | 2022
|