A platform for research: civil engineering, architecture and urbanism
A foundation lifting method includes the steps of cutting an existing concrete pile below the building foundation, inserting two sleeve portions over ends of the cut pile, placing a lifting device, such as a jack, between the ends of the cut pile and jacking vertically within the cut out section, and then fixing the two sleeve portions to reinforce the cut area. The method can be performed simultaneously or consecutively on plural existing concrete piles below the building foundation. The sleeve portion couples the lower pile portion with the upper pile portion to resist vertical and transverse loads. A computerized interface can coordinate the actuation scheme for multiple piles.
A foundation lifting method includes the steps of cutting an existing concrete pile below the building foundation, inserting two sleeve portions over ends of the cut pile, placing a lifting device, such as a jack, between the ends of the cut pile and jacking vertically within the cut out section, and then fixing the two sleeve portions to reinforce the cut area. The method can be performed simultaneously or consecutively on plural existing concrete piles below the building foundation. The sleeve portion couples the lower pile portion with the upper pile portion to resist vertical and transverse loads. A computerized interface can coordinate the actuation scheme for multiple piles.
Foundation Repair Method
HODGE MALCOLM H (author)
2021-12-02
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
GrĂ¼ndungen
PILE FOUNDATION REPAIR METHOD, PILE FOUNDATION REPAIR KIT, AND PILE FOUNDATION STRUCTURE
European Patent Office | 2016
|British Library Conference Proceedings | 2003
|TIBKAT | 1999
|