A platform for research: civil engineering, architecture and urbanism
Monitoring and optimisation of water consumption
A water meter includes a valve, or first means for communicating with a valve, and a processing unit arranged for: analysing the measurements of the water consumption to produce predefined parameter measurements relating to water consumption, and detecting, from said predefined parameter measurements, operating phases of at least one predetermined system of the installation; for each predetermined system, during each phase of operation of said predetermined system. The water consumption exceeds a predetermined threshold associated with said predetermined system, at least partially close the valve for a predetermined time to limit a current water flow rate of water supplied to the installation.
Monitoring and optimisation of water consumption
A water meter includes a valve, or first means for communicating with a valve, and a processing unit arranged for: analysing the measurements of the water consumption to produce predefined parameter measurements relating to water consumption, and detecting, from said predefined parameter measurements, operating phases of at least one predetermined system of the installation; for each predetermined system, during each phase of operation of said predetermined system. The water consumption exceeds a predetermined threshold associated with said predetermined system, at least partially close the valve for a predetermined time to limit a current water flow rate of water supplied to the installation.
Monitoring and optimisation of water consumption
TEBOULLE HENRI (author)
2024-04-04
Patent
Electronic Resource
English
IPC:
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
/
G01F
Messen des Volumens, des Durchflussvolumens, des Massendurchflusses oder des Füllstandes
,
MEASURING VOLUME, VOLUME FLOW, MASS FLOW, OR LIQUID LEVEL
Tema Archive | 1986
|Combined peak reduction and self-consumption using proximal policy optimisation
DOAJ | 2024
|Production optimisation through advanced condition monitoring
British Library Online Contents | 2008
Intelligent fire hydrant with water consumption monitoring function
European Patent Office | 2023
|