A platform for research: civil engineering, architecture and urbanism
Method for tamping a track by means of asynchronously moved tamping units
For tamping two adjacent sleepers (9) of a track (3), the joint lowering of two adjoining tamping units (2) takes place with a time delay. As a result, the immersion in particular of immediately adjacent inner tamping tines (20) plunging into a common sleeper crib (18) is facilitated.
Method for tamping a track by means of asynchronously moved tamping units
For tamping two adjacent sleepers (9) of a track (3), the joint lowering of two adjoining tamping units (2) takes place with a time delay. As a result, the immersion in particular of immediately adjacent inner tamping tines (20) plunging into a common sleeper crib (18) is facilitated.
Method for tamping a track by means of asynchronously moved tamping units
SPRINGER HEINZ (author)
2017-01-17
Patent
Electronic Resource
English
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
METHOD FOR TAMPING A TRACK BY MEANS OF ASYNCHRONOUSLY MOVED TAMPING UNITS
European Patent Office | 2015
|Method for underfilling a track by means of asynchronously moved tamping units
European Patent Office | 2015
|