A platform for research: civil engineering, architecture and urbanism
Method for underfilling a track by means of asynchronously moved tamping units
For underfilling two adjacent sleepers (9) of a rail (3), two adjoining tamping units (2) are lowered, jointly, with a time delay. Thus in particular the dipping of directly adjacent internal tamping tines (20) into a common sleeper bay (18) is simplified.
Method for underfilling a track by means of asynchronously moved tamping units
For underfilling two adjacent sleepers (9) of a rail (3), two adjoining tamping units (2) are lowered, jointly, with a time delay. Thus in particular the dipping of directly adjacent internal tamping tines (20) into a common sleeper bay (18) is simplified.
Method for underfilling a track by means of asynchronously moved tamping units
SPRINGER HEINZ (author)
2015-09-02
Patent
Electronic Resource
English
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Method for tamping a track by means of asynchronously moved tamping units
European Patent Office | 2017
|METHOD FOR TAMPING A TRACK BY MEANS OF ASYNCHRONOUSLY MOVED TAMPING UNITS
European Patent Office | 2015
|