A platform for research: civil engineering, architecture and urbanism
UNDERGROUND STRUCTURE CONSTRUCTION METHOD USING SUMP
The present invention provides an underground structure construction method comprising: a perforating step for forming a perforated hole (10); a sump formation step for forming a plurality of sumps (400) in the rear of the perforated hole (10); a perforated hole reaming member insertion step for reaming by inserting a perforated hole reaming member (100) into the perforated hole (10) wherein a front sheathing plate (110) and a rear sheathing plate (120) are detachably coupled to both sides of the reaming member and lower ends of the front sheathing plate (110) and the rear sheathing plate (120) are spaced apart; a perforated hole installation step for installing a plurality of perforated hole reaming members (100) in a row by laterally repeating the perforating step and the perforated hole reaming member insertion step; a sheathing plate support step for an upper end of the front sheathing plate (110) providing frontward support and for an upper end of the rear sheathing plate (120) providing rearward support; a perforated hole reaming member removal step for removing the perforated hole reaming member (100) while the front sheathing plate (110) and the rear sheathing plate (120) are inserted into the perforated hole (10); a reinforcement assembly (200) assembling step for forming a reinforcement assembly (200) by assembling wall reinforcement bars (220, 230 and 240) on a plurality of reinforcement plates (210); a reinforcement assembly insertion step for inserting the reinforcement assembly (200) between the front sheathing plate (110) and the rear sheathing plate (120) so that the plurality of reinforcement plates (210) having a vertically stacked structure can be located in the position of the front sheathing plate (110); a front sheathing plate removal step for removing the front sheathing plate (110); a concrete wall deposition step for depositing concrete in a region between the rear sheathing plate (120) and the reinforcement plates (210) and forming walls (W); a ground floor reinforcement plate (210) removal step for removing reinforcement plates (210a1) located in positions in which a ground floor slab is to be installed and for exposing parts of the wall reinforcement bars (220, 230 and 240); a slab form installation step for installing a ground floor slab form (21) in a region between the walls (W) and for arranging ground floor slab reinforcement bars (310) wherein the slab form is coupled to the exposed wall reinforcement bars (220a); and a slab concrete deposition step for forming a ground floor slab (S1) by depositing concrete in the ground floor slab form (21). The method can thereby facilitate ease of construction and can reduce construction time and cost.
La présente invention concerne un procédé de construction d'une structure souterraine comportant: une étape de perforation consistant à former un trou perforé (10); une étape de formation de puisards consistant à former une pluralité de puisards (400) à l'arrière du trou perforé (10); une étape d'insertion d'organe d'alésage de trou perforé consistant à aléser en insérant un organe (100) d'alésage de trou perforé dans le trou perforé (10), une plaque (110) de gainage avant et une plaque (120) de gainage arrière étant couplées de façon détachable aux deux côtés de l'organe d'alésage et des extrémités inférieures de la plaque (110) de gainage avant et de la plaque (120) de gainage arrière étant espacées; une étape d'installation de trou perforé consistant à installer une pluralité d'organes (100) d'alésage de trou perforé en une rangée en répétant latéralement l'étape de perforation et l'étape d'insertion d'organe d'alésage de trou perforé; une étape de soutien de plaques de gainage consistant à assurer un soutien vers l'avant pour une extrémité supérieure de la plaque (110) de gainage avant et à assurer un soutien vers l'arrière pour une extrémité supérieure de la plaque (120) de gainage arrière; une étape de démontage d'organe d'alésage de trou perforé consistant à démonter l'organe (100) d'alésage de trou perforé tandis que la plaque (110) de gainage avant et la plaque (120) de gainage arrière sont insérées dans le trou perforé (10); une étape de montage d'ensemble (200) de renfort consistant à former un ensemble (200) de renfort en assemblant des barres (220, 230 et 240) de renforcement de murs sur une pluralité de plaques (210) de renfort; une étape d'insertion d'ensemble de renfort consistant à insérer l'ensemble (200) de renfort entre la plaque (110) de gainage avant et la plaque (120) de gainage arrière de telle façon que la pluralité de plaques (210) de renfort présentant une structure empilée verticalement puisse être située dans la position de la plaque (110) de gainage avant; une étape de démontage de plaque de gainage avant consistant à démonter la plaque (110) de gainage avant; une étape de dépôt de béton pour murs consistant à déposer du béton dans une région comprise entre la plaque (120) de gainage arrière et les plaques (210) de renfort et à former des murs (W); une étape de démontage de plaques (210) de renfort de rez-de-chaussée consistant à démonter des plaques (210a1) de renfort situées dans des positions où une dalle de rez-de-chaussée est appelée à être installée, et à découvrir des parties des barres (220, 230 et 240) de renforcement de murs; une étape d'installation de coffrage de dalle consistant à installer un coffrage (21) de dalle de rez-de-chaussée dans une région située entre les murs (W) et à disposer des barres (310) de renfort de dalle de rez-de-chaussée, le coffrage de dalle étant couplé aux barres (220a) de renforcement de murs découvertes; et une étape de dépôt de béton pour dalle consistant à former une dalle (S1) de rez-de-chaussée en déposant du béton dans le coffrage (21) de dalle de rez-de-chaussée. Le procédé peut ainsi faciliter la construction et réduire la durée et le coût de la construction.
본 발명은 지반에 천공 홀(10)을 형성하는 천공단계; 상기 천공 홀(10)의 후방에 다수의 집수정(400)을 형성하는 집수정 형성단계; 양측에 각각 전면 흙막이판(110) 및 후면 흙막이판(120)이 착탈가능하게 결합함과 아울러, 상기 전면 흙막이판(110) 및 후면 흙막이판(120)의 하단은 상호 일정거리를 유지하도록 형성된 천공 홀 확공부재(100)를 상기 천공 홀(10)에 삽입하여 확공하는 천공 홀 확공부재 삽입단계; 상기 천공단계 및 천공 홀 확공부재 삽입단계를 측방으로 반복하여, 다수의 상기 천공 홀 확공부재(100)가 열지어 설치되도록 하는 천공 홀 확공부재 설치단계; 상기 전면 흙막이판(110)의 상단은 전방으로 지지하고, 상기 후면 흙막이판(120)의 상단은 후방으로 지지하는 흙막이판 지지단계; 상기 전면 흙막이판(110) 및 후면 흙막이판(120)은 상기 천공 홀(10)에 삽입된 상태에서, 상기 천공 홀 확공부재(100)를 제거하는 천공 홀 확공부재 제거단계; 복수의 배근판(210)에 벽체 철근(220,230,240)을 조립하여 배근조립체(200)를 형성하는 배근조립체 조립단계; 상기 전면 흙막이판(110) 및 후면 흙막이판(120)의 사이에 상기 배근조립체(200)를 삽입하되, 상기 복수의 배근판(210)이 상하방향 적층구조로서 상기 전면 흙막이판(110)의 위치에 오도록 하는 배근조립체 삽입단계; 상기 전면 흙막이판(110)을 제거하는 전면 흙막이판 제거단계; 상기 후면 흙막이판(120)과 상기 배근판(210)의 사이 영역에 콘크리트를 타설하여 벽체(W)를 형성하는 벽체 콘크리트 타설단계; 상기 복수의 배근판(210) 중 1층 슬래브 설치위치의 배근판(210a1)을 제거하고, 상기 벽체 철근(220,230,240)의 일부를 노출시키는 1층 배근판 제거단계; 상기 벽체(W)의 사이 영역의 지반 위에 1층 슬래브 거푸집(21)을 설치하고, 1층 슬래브 철근(310)을 배근하되, 상기 노출된 벽체 철근(220a)과 결합하는 슬래브 거푸집 설치단계; 상기 1층 슬래브 거푸집(21)에 콘크리트를 타설하여 1층 슬래브(S1)를 형성하는 슬래브 콘크리트 타설단계;를 포함하는 것을 특징으로 하는 지중 구조물 시공방법을 제시함으로써, 시공이 간편하고, 시공의 시간 및 비용을 줄일 수 있도록 한다.
UNDERGROUND STRUCTURE CONSTRUCTION METHOD USING SUMP
The present invention provides an underground structure construction method comprising: a perforating step for forming a perforated hole (10); a sump formation step for forming a plurality of sumps (400) in the rear of the perforated hole (10); a perforated hole reaming member insertion step for reaming by inserting a perforated hole reaming member (100) into the perforated hole (10) wherein a front sheathing plate (110) and a rear sheathing plate (120) are detachably coupled to both sides of the reaming member and lower ends of the front sheathing plate (110) and the rear sheathing plate (120) are spaced apart; a perforated hole installation step for installing a plurality of perforated hole reaming members (100) in a row by laterally repeating the perforating step and the perforated hole reaming member insertion step; a sheathing plate support step for an upper end of the front sheathing plate (110) providing frontward support and for an upper end of the rear sheathing plate (120) providing rearward support; a perforated hole reaming member removal step for removing the perforated hole reaming member (100) while the front sheathing plate (110) and the rear sheathing plate (120) are inserted into the perforated hole (10); a reinforcement assembly (200) assembling step for forming a reinforcement assembly (200) by assembling wall reinforcement bars (220, 230 and 240) on a plurality of reinforcement plates (210); a reinforcement assembly insertion step for inserting the reinforcement assembly (200) between the front sheathing plate (110) and the rear sheathing plate (120) so that the plurality of reinforcement plates (210) having a vertically stacked structure can be located in the position of the front sheathing plate (110); a front sheathing plate removal step for removing the front sheathing plate (110); a concrete wall deposition step for depositing concrete in a region between the rear sheathing plate (120) and the reinforcement plates (210) and forming walls (W); a ground floor reinforcement plate (210) removal step for removing reinforcement plates (210a1) located in positions in which a ground floor slab is to be installed and for exposing parts of the wall reinforcement bars (220, 230 and 240); a slab form installation step for installing a ground floor slab form (21) in a region between the walls (W) and for arranging ground floor slab reinforcement bars (310) wherein the slab form is coupled to the exposed wall reinforcement bars (220a); and a slab concrete deposition step for forming a ground floor slab (S1) by depositing concrete in the ground floor slab form (21). The method can thereby facilitate ease of construction and can reduce construction time and cost.
La présente invention concerne un procédé de construction d'une structure souterraine comportant: une étape de perforation consistant à former un trou perforé (10); une étape de formation de puisards consistant à former une pluralité de puisards (400) à l'arrière du trou perforé (10); une étape d'insertion d'organe d'alésage de trou perforé consistant à aléser en insérant un organe (100) d'alésage de trou perforé dans le trou perforé (10), une plaque (110) de gainage avant et une plaque (120) de gainage arrière étant couplées de façon détachable aux deux côtés de l'organe d'alésage et des extrémités inférieures de la plaque (110) de gainage avant et de la plaque (120) de gainage arrière étant espacées; une étape d'installation de trou perforé consistant à installer une pluralité d'organes (100) d'alésage de trou perforé en une rangée en répétant latéralement l'étape de perforation et l'étape d'insertion d'organe d'alésage de trou perforé; une étape de soutien de plaques de gainage consistant à assurer un soutien vers l'avant pour une extrémité supérieure de la plaque (110) de gainage avant et à assurer un soutien vers l'arrière pour une extrémité supérieure de la plaque (120) de gainage arrière; une étape de démontage d'organe d'alésage de trou perforé consistant à démonter l'organe (100) d'alésage de trou perforé tandis que la plaque (110) de gainage avant et la plaque (120) de gainage arrière sont insérées dans le trou perforé (10); une étape de montage d'ensemble (200) de renfort consistant à former un ensemble (200) de renfort en assemblant des barres (220, 230 et 240) de renforcement de murs sur une pluralité de plaques (210) de renfort; une étape d'insertion d'ensemble de renfort consistant à insérer l'ensemble (200) de renfort entre la plaque (110) de gainage avant et la plaque (120) de gainage arrière de telle façon que la pluralité de plaques (210) de renfort présentant une structure empilée verticalement puisse être située dans la position de la plaque (110) de gainage avant; une étape de démontage de plaque de gainage avant consistant à démonter la plaque (110) de gainage avant; une étape de dépôt de béton pour murs consistant à déposer du béton dans une région comprise entre la plaque (120) de gainage arrière et les plaques (210) de renfort et à former des murs (W); une étape de démontage de plaques (210) de renfort de rez-de-chaussée consistant à démonter des plaques (210a1) de renfort situées dans des positions où une dalle de rez-de-chaussée est appelée à être installée, et à découvrir des parties des barres (220, 230 et 240) de renforcement de murs; une étape d'installation de coffrage de dalle consistant à installer un coffrage (21) de dalle de rez-de-chaussée dans une région située entre les murs (W) et à disposer des barres (310) de renfort de dalle de rez-de-chaussée, le coffrage de dalle étant couplé aux barres (220a) de renforcement de murs découvertes; et une étape de dépôt de béton pour dalle consistant à former une dalle (S1) de rez-de-chaussée en déposant du béton dans le coffrage (21) de dalle de rez-de-chaussée. Le procédé peut ainsi faciliter la construction et réduire la durée et le coût de la construction.
본 발명은 지반에 천공 홀(10)을 형성하는 천공단계; 상기 천공 홀(10)의 후방에 다수의 집수정(400)을 형성하는 집수정 형성단계; 양측에 각각 전면 흙막이판(110) 및 후면 흙막이판(120)이 착탈가능하게 결합함과 아울러, 상기 전면 흙막이판(110) 및 후면 흙막이판(120)의 하단은 상호 일정거리를 유지하도록 형성된 천공 홀 확공부재(100)를 상기 천공 홀(10)에 삽입하여 확공하는 천공 홀 확공부재 삽입단계; 상기 천공단계 및 천공 홀 확공부재 삽입단계를 측방으로 반복하여, 다수의 상기 천공 홀 확공부재(100)가 열지어 설치되도록 하는 천공 홀 확공부재 설치단계; 상기 전면 흙막이판(110)의 상단은 전방으로 지지하고, 상기 후면 흙막이판(120)의 상단은 후방으로 지지하는 흙막이판 지지단계; 상기 전면 흙막이판(110) 및 후면 흙막이판(120)은 상기 천공 홀(10)에 삽입된 상태에서, 상기 천공 홀 확공부재(100)를 제거하는 천공 홀 확공부재 제거단계; 복수의 배근판(210)에 벽체 철근(220,230,240)을 조립하여 배근조립체(200)를 형성하는 배근조립체 조립단계; 상기 전면 흙막이판(110) 및 후면 흙막이판(120)의 사이에 상기 배근조립체(200)를 삽입하되, 상기 복수의 배근판(210)이 상하방향 적층구조로서 상기 전면 흙막이판(110)의 위치에 오도록 하는 배근조립체 삽입단계; 상기 전면 흙막이판(110)을 제거하는 전면 흙막이판 제거단계; 상기 후면 흙막이판(120)과 상기 배근판(210)의 사이 영역에 콘크리트를 타설하여 벽체(W)를 형성하는 벽체 콘크리트 타설단계; 상기 복수의 배근판(210) 중 1층 슬래브 설치위치의 배근판(210a1)을 제거하고, 상기 벽체 철근(220,230,240)의 일부를 노출시키는 1층 배근판 제거단계; 상기 벽체(W)의 사이 영역의 지반 위에 1층 슬래브 거푸집(21)을 설치하고, 1층 슬래브 철근(310)을 배근하되, 상기 노출된 벽체 철근(220a)과 결합하는 슬래브 거푸집 설치단계; 상기 1층 슬래브 거푸집(21)에 콘크리트를 타설하여 1층 슬래브(S1)를 형성하는 슬래브 콘크리트 타설단계;를 포함하는 것을 특징으로 하는 지중 구조물 시공방법을 제시함으로써, 시공이 간편하고, 시공의 시간 및 비용을 줄일 수 있도록 한다.
UNDERGROUND STRUCTURE CONSTRUCTION METHOD USING SUMP
PROCÉDÉ DE CONSTRUCTION D'UNE STRUCTURE SOUTERRAINE À L'AIDE D'UN PUISARD
집수정을 이용한 지중 구조물 시공방법
YUN DONG HYUN (author)
2015-07-16
Patent
Electronic Resource
Korean
IPC:
E02D
FOUNDATIONS
,
Gründungen
Low-disturbance underground sump sludge cleaning device and sump cleaning method
European Patent Office | 2024
|