A platform for research: civil engineering, architecture and urbanism
PREFABRICATED DOUBLE COMPOSITE PLATE GIRDER BRIDGE AND CONSTRUCTION METHOD THEREFOR
The present invention relates to a prefabricated double composite plate girder bridge and a construction method therefor and, more specifically, to a prefabricated double composite plate girder bridge and a construction method therefor, the girder bridge allowing a reinforcing concrete to be combined with the center portion of a plate girder at which a large negative moment is generated, so as to enable stiffness of the center portion of the plate girder to be improved, thereby reducing the depth and weight of the plate girder, preventing distortion of the plate girder, and enabling even a cross beam to be removed from the center portion of the plate girder and, in addition, applies a precast deck so as to enable rapid construction.
La présente invention concerne un pont de poutre en plaque composite double préfabriqué et son procédé de construction, le pont de poutre permettant à un béton d'armature d'être combiné avec la partie centrale d'une poutre de plaque à laquelle un grand moment négatif est généré, de façon à permettre d'améliorer la rigidité de la partie centrale de la poutre de plaque, ce qui permet de réduire la profondeur et le poids de la poutre de plaque, empêchant ainsi la déformation de la poutre de plaque, et permettant même à une traverse d'être retirée de la partie centrale de la poutre de plaque et, en outre, applique un pont préfabriqué de façon à permettre une construction rapide.
본 발명은 조립식 이중합성 플레이트 거더교 및 그 시공방법에 관한것으로써, 더욱 상세하게는 부모멘트가 크게 발생하는 플레이트 거더의 중앙 지점부에 보강 콘크리트를 합성함으로써, 플레이트 거더의 중앙 지점부 강성을 향상할 수 있고, 이로인해 플레이트 거더의 형고 및 중량을 감소함과 아울러 플레이트 거더의 비틀림을 방지하고 플레이트 거더의 중앙 지점부에 가로보도 생략할 수 있으며, 또한 프리캐스트 바닥판을 적용하여 급속 시공이 가능한 조립식 이중합성 플레이트 거더교 및 그 시공방법에 관한 것이다.
PREFABRICATED DOUBLE COMPOSITE PLATE GIRDER BRIDGE AND CONSTRUCTION METHOD THEREFOR
The present invention relates to a prefabricated double composite plate girder bridge and a construction method therefor and, more specifically, to a prefabricated double composite plate girder bridge and a construction method therefor, the girder bridge allowing a reinforcing concrete to be combined with the center portion of a plate girder at which a large negative moment is generated, so as to enable stiffness of the center portion of the plate girder to be improved, thereby reducing the depth and weight of the plate girder, preventing distortion of the plate girder, and enabling even a cross beam to be removed from the center portion of the plate girder and, in addition, applies a precast deck so as to enable rapid construction.
La présente invention concerne un pont de poutre en plaque composite double préfabriqué et son procédé de construction, le pont de poutre permettant à un béton d'armature d'être combiné avec la partie centrale d'une poutre de plaque à laquelle un grand moment négatif est généré, de façon à permettre d'améliorer la rigidité de la partie centrale de la poutre de plaque, ce qui permet de réduire la profondeur et le poids de la poutre de plaque, empêchant ainsi la déformation de la poutre de plaque, et permettant même à une traverse d'être retirée de la partie centrale de la poutre de plaque et, en outre, applique un pont préfabriqué de façon à permettre une construction rapide.
본 발명은 조립식 이중합성 플레이트 거더교 및 그 시공방법에 관한것으로써, 더욱 상세하게는 부모멘트가 크게 발생하는 플레이트 거더의 중앙 지점부에 보강 콘크리트를 합성함으로써, 플레이트 거더의 중앙 지점부 강성을 향상할 수 있고, 이로인해 플레이트 거더의 형고 및 중량을 감소함과 아울러 플레이트 거더의 비틀림을 방지하고 플레이트 거더의 중앙 지점부에 가로보도 생략할 수 있으며, 또한 프리캐스트 바닥판을 적용하여 급속 시공이 가능한 조립식 이중합성 플레이트 거더교 및 그 시공방법에 관한 것이다.
PREFABRICATED DOUBLE COMPOSITE PLATE GIRDER BRIDGE AND CONSTRUCTION METHOD THEREFOR
PONT DE POUTRE EN PLAQUE COMPOSITE DOUBLE PRÉFABRIQUÉ ET SON PROCÉDÉ DE CONSTRUCTION
조립식 이중합성 플레이트 거더교 및 그 시공방법
KIM KEUN TAEK (author)
2018-10-18
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
Prefabricated double composite plate girder bridge and its construction method
European Patent Office | 2017
|Construction method for erecting double-layer prefabricated box girder bridge
European Patent Office | 2024
|Prefabricated assembly type suspension bridge girder and construction method
European Patent Office | 2021
|