VACUUM CONSOLIDATION DREDGING METHOD, TOWER AIR-TIGHT LOADING CAISSON, AND DEDICATED WORK SHIP
For large-scale dredging construction work, vacuum consolidation methods for the seabed floor are expanded and vacuum consolidation and dredging using an air-tight loading caisson with an opened bottom box-shape are performed by a series of steps. Dredged soil generation decreases with the progress of consolidation settlement. Conversely, drains clog resulting from the consolidation process and pushing out packed seabed soil from the air-tight loading caisson becomes difficult. In particular, the problem of floating mud causing long consolidation time and clogging is significant. The present invention easily solves the problems of drain clogging and pushing out the packed seabed soil by way of an air pressure control system configured from three air passages. In addition, rapid consolidation of floating mud is achieved by way of a consolidation system to suction a consolidation discharge face (boundary face) of the air-tight loading caisson and reverse a repulsive force.
Pour le travail de construction à dragage à grande échelle, des procédés de consolidation sous vide pour le fond marin sont étendus et une consolidation et un dragage sous vide à l'aide d'un caisson de chargement étanche à l'air ayant une forme en boîte à fond ouvert sont effectués en une série d'étapes. La génération de sol dragué diminue avec la progression du tassement dû à la consolidation. À l'inverse, un colmatage de drains résultant du processus de consolidation et de l'extraction de sol de fond marin aggloméré du caisson de chargement étanche à l'air entraîne des difficultés. En particulier, un problème important est dû à la boue flottante provoquant un temps long de consolidation et un colmatage. La présente invention résout facilement les problèmes de colmatage de drain et d'extraction du sol de fond marin aggloméré au moyen d'un système de commande de pression d'air conçu à partir de trois passages d'air. De plus, une consolidation rapide de boue flottante est obtenue au moyen d'un système de consolidation destiné à aspirer une face d'évacuation de consolidation (face limite) du caisson de chargement étanche à l'air et à inverser une force de répulsion.
大規模浚渫工事において、海底地盤の真空圧密工法を発展させて底面開口の箱型の気密載荷函体を使い真空圧密と浚渫を一連の工程で実施する。圧密沈下が進行すれば浚渫土の発生が減少する。反面、圧密過程のドレーンの目詰まり、気密載荷函体からの中詰海底土の押し出しが難しくなる。特に浮泥は圧密時間が長く目詰まりの課題が顕著である。本発明は3つの空気経路から構成される空圧制御システムによってドレーンの目詰まり、中詰海底土の押し出しの課題を簡便に解消した。また、気密載荷函体の圧密排水面(境界面)の吸引,斥力反転の圧密システムにより、浮泥の急速圧密を実現した。
VACUUM CONSOLIDATION DREDGING METHOD, TOWER AIR-TIGHT LOADING CAISSON, AND DEDICATED WORK SHIP
For large-scale dredging construction work, vacuum consolidation methods for the seabed floor are expanded and vacuum consolidation and dredging using an air-tight loading caisson with an opened bottom box-shape are performed by a series of steps. Dredged soil generation decreases with the progress of consolidation settlement. Conversely, drains clog resulting from the consolidation process and pushing out packed seabed soil from the air-tight loading caisson becomes difficult. In particular, the problem of floating mud causing long consolidation time and clogging is significant. The present invention easily solves the problems of drain clogging and pushing out the packed seabed soil by way of an air pressure control system configured from three air passages. In addition, rapid consolidation of floating mud is achieved by way of a consolidation system to suction a consolidation discharge face (boundary face) of the air-tight loading caisson and reverse a repulsive force.
Pour le travail de construction à dragage à grande échelle, des procédés de consolidation sous vide pour le fond marin sont étendus et une consolidation et un dragage sous vide à l'aide d'un caisson de chargement étanche à l'air ayant une forme en boîte à fond ouvert sont effectués en une série d'étapes. La génération de sol dragué diminue avec la progression du tassement dû à la consolidation. À l'inverse, un colmatage de drains résultant du processus de consolidation et de l'extraction de sol de fond marin aggloméré du caisson de chargement étanche à l'air entraîne des difficultés. En particulier, un problème important est dû à la boue flottante provoquant un temps long de consolidation et un colmatage. La présente invention résout facilement les problèmes de colmatage de drain et d'extraction du sol de fond marin aggloméré au moyen d'un système de commande de pression d'air conçu à partir de trois passages d'air. De plus, une consolidation rapide de boue flottante est obtenue au moyen d'un système de consolidation destiné à aspirer une face d'évacuation de consolidation (face limite) du caisson de chargement étanche à l'air et à inverser une force de répulsion.
大規模浚渫工事において、海底地盤の真空圧密工法を発展させて底面開口の箱型の気密載荷函体を使い真空圧密と浚渫を一連の工程で実施する。圧密沈下が進行すれば浚渫土の発生が減少する。反面、圧密過程のドレーンの目詰まり、気密載荷函体からの中詰海底土の押し出しが難しくなる。特に浮泥は圧密時間が長く目詰まりの課題が顕著である。本発明は3つの空気経路から構成される空圧制御システムによってドレーンの目詰まり、中詰海底土の押し出しの課題を簡便に解消した。また、気密載荷函体の圧密排水面(境界面)の吸引,斥力反転の圧密システムにより、浮泥の急速圧密を実現した。
VACUUM CONSOLIDATION DREDGING METHOD, TOWER AIR-TIGHT LOADING CAISSON, AND DEDICATED WORK SHIP
PROCÉDÉ DE DRAGAGE ET DE CONSOLIDATION SOUS VIDE, CAISSON DE CHARGEMENT ÉTANCHE À L'AIR DE TYPE TOUR, ET NAVIRE DE TRAVAIL DÉDIÉ
真空圧密浚渫工法とタワー式気密載荷函体及び専用作業船
KONDO TADAYOSI (author)
2019-10-03
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
VACUUM CONSOLIDATION DREDGING METHOD, TOWER AIR-TIGHT LOADING CAISSON, AND DEDICATED WORK SHIP
European Patent Office | 2019
|European Patent Office | 2017
|European Patent Office | 2022
|VACUUM CONSOLIDATION DREDGING METHOD, AIRTIGHT LOADING BOX, AND VACUUM CONSOLIDATION DREDGER
European Patent Office | 2021
|VACUUM CONSOLIDATION METHOD, VACUUM CONSOLIDATION DREDGING METHOD, AND VERTICAL DRAIN
European Patent Office | 2021
|