A platform for research: civil engineering, architecture and urbanism
GROUND IMPROVEMENT BODY AND CONSTRUCTION METHOD THEREFOR
A ground improvement body comprising: a group of short cylindrical columns 11 that are formed from a first level L1 to a second level L2 by a column construction machine 30 that rotates on a horizontal plane, where the first level L1, the second level L2, a third level L3, and a fourth level L4 are set in order from the deepest to the shallowest in soft ground; and a slab 20 that is supported by the group of short cylindrical columns 11. The slab 20 comprises: a slab body 21 that is formed by a vertical slab construction machine 40 that rotates in the vertical direction and that is formed from the third level L3 to the fourth level L4 by the vertical slab construction machine 40; and a beam 22 that is provided between the top 11b of the group of short cylindrical columns 11 and the bottom of the slab body 21. The slab demonstrates a T-shape in the perpendicular cross-sectional view.
Corps d'amélioration de sol qui comprend : un groupe de courts poteaux cylindriques (11) qui sont formés d'un premier niveau L1 à un second niveau L2 par une machine de construction de poteau (30) qui tourne sur un plan horizontal, le premier niveau L1, le deuxième niveau L2, un troisième niveau L3 et un quatrième niveau L4 étant définis dans l'ordre depuis le plus profond jusqu'au niveau le plus bas dans le sol tendre; et une dalle (20) qui est supportée par le groupe de courts poteaux cylindriques (11). La dalle (20) comprend : un corps de dalle (21) qui est formé par une machine de construction de dalle verticale (40) qui tourne dans la direction verticale et qui est formé à partir du troisième niveau L3 jusqu'au quatrième niveau L4 par la machine de construction de dalle verticale (40); et une poutre (22) qui est disposée entre le sommet (11b) du groupe de courts poteaux cylindriques (11) et le fond du corps de dalle (21). La plaque présente une forme en T dans la vue en coupe transversale perpendiculaire.
軟弱地盤内において深い方から浅い方へ向けて、第1レベルL1、第2レベルL2、第3レベルL3及び第4レベルL4をこの順に設定し、第1レベルL1から第2レベルL2までに至り、水平面内で回転するコラム施工機30により形成される複数の円柱短尺コラム11群と、円柱短尺コラム11群に支持されるスラブ体20とを備える地盤改良体である。スラブ体20は、鉛直方向に回転する縦型スラブ施工機40により形成され、第3レベルL3から第4レベルL4に至り、縦型スラブ施工機40により形成されるスラブ本体21と、円柱短尺コラム11群の頂部11bとスラブ本体21の底部との間に設けられる梁部22とを備え、垂直断面視においてT字状をなす。
GROUND IMPROVEMENT BODY AND CONSTRUCTION METHOD THEREFOR
A ground improvement body comprising: a group of short cylindrical columns 11 that are formed from a first level L1 to a second level L2 by a column construction machine 30 that rotates on a horizontal plane, where the first level L1, the second level L2, a third level L3, and a fourth level L4 are set in order from the deepest to the shallowest in soft ground; and a slab 20 that is supported by the group of short cylindrical columns 11. The slab 20 comprises: a slab body 21 that is formed by a vertical slab construction machine 40 that rotates in the vertical direction and that is formed from the third level L3 to the fourth level L4 by the vertical slab construction machine 40; and a beam 22 that is provided between the top 11b of the group of short cylindrical columns 11 and the bottom of the slab body 21. The slab demonstrates a T-shape in the perpendicular cross-sectional view.
Corps d'amélioration de sol qui comprend : un groupe de courts poteaux cylindriques (11) qui sont formés d'un premier niveau L1 à un second niveau L2 par une machine de construction de poteau (30) qui tourne sur un plan horizontal, le premier niveau L1, le deuxième niveau L2, un troisième niveau L3 et un quatrième niveau L4 étant définis dans l'ordre depuis le plus profond jusqu'au niveau le plus bas dans le sol tendre; et une dalle (20) qui est supportée par le groupe de courts poteaux cylindriques (11). La dalle (20) comprend : un corps de dalle (21) qui est formé par une machine de construction de dalle verticale (40) qui tourne dans la direction verticale et qui est formé à partir du troisième niveau L3 jusqu'au quatrième niveau L4 par la machine de construction de dalle verticale (40); et une poutre (22) qui est disposée entre le sommet (11b) du groupe de courts poteaux cylindriques (11) et le fond du corps de dalle (21). La plaque présente une forme en T dans la vue en coupe transversale perpendiculaire.
軟弱地盤内において深い方から浅い方へ向けて、第1レベルL1、第2レベルL2、第3レベルL3及び第4レベルL4をこの順に設定し、第1レベルL1から第2レベルL2までに至り、水平面内で回転するコラム施工機30により形成される複数の円柱短尺コラム11群と、円柱短尺コラム11群に支持されるスラブ体20とを備える地盤改良体である。スラブ体20は、鉛直方向に回転する縦型スラブ施工機40により形成され、第3レベルL3から第4レベルL4に至り、縦型スラブ施工機40により形成されるスラブ本体21と、円柱短尺コラム11群の頂部11bとスラブ本体21の底部との間に設けられる梁部22とを備え、垂直断面視においてT字状をなす。
GROUND IMPROVEMENT BODY AND CONSTRUCTION METHOD THEREFOR
CORPS D'AMÉLIORATION DE SOL ET SON PROCÉDÉ DE CONSTRUCTION
地盤改良体及びその構築方法
MIURA NORIHIKO (author) / USUI HIROFUMI (author) / KOMAKI TAKAHIRO (author)
2020-07-02
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
GROUND IMPROVEMENT BODY AND CONSTRUCTION METHOD THEREFOR
European Patent Office | 2021
|European Patent Office | 2021
|GROUND IMPROVEMENT BODY CREATING DEVICE, GROUND IMPROVEMENT CONSTRUCTION METHOD
European Patent Office | 2023
|WEAK GROUND IMPROVEMENT BODY, AND CONSTRUCTION METHOD OF WEAK GROUND IMPROVEMENT BODY
European Patent Office | 2022
|