A platform for research: civil engineering, architecture and urbanism
PRE-TENSIONING AND POST-ANCHORING CONSTRUCTION METHOD FOR PRESTRESSED ANTI-FLOATING ANCHOR ROD
The present invention relates to the technical field of prestressed anti-floating anchor rod construction. Disclosed is a pre-tensioning and post-anchoring construction method for a prestressed anti-floating anchor rod, characterized by comprising the following steps: 1) performing prestressed anchor rod construction; forming a drill hole in a soil body by construction, and lowering the prestressed anchor rod into the drill hole, and after lowering the prestressed anchor rod, pouring slurry into the drill hole; 2) the prestressed anchor rod comprising an anchor head and a rod body, the anchor head being located outside the drill hole, and the rod body being located in the drill hole; digging around an outer periphery of the anchor head to form a construction groove, and performing reinforced concrete construction in the construction groove to form an anchor pier; 3) performing tension locking on the prestressed anchor rod; and 4) constructing an underground structure above the soil body, and anchoring the anchor head into the underground structure. In this way, the prestressed anchor rod construction, the anchor pier construction, and the underground structure construction do not interfere with each other, facilitating construction management, facilitating tension locking, and simplifying construction steps; furthermore, a constraining force is generated for the underground structure to prevent the underground structure from floating upward, avoiding deformation of the underground structure due to upward floating, so that the anti-floating effect is enhanced.
La présente invention se rapporte au domaine technique de la construction de tige d'ancrage précontrainte anti-flottaison. L'invention concerne un procédé de construction en pré-tension et en post-ancrage d'une tige d'ancrage précontrainte anti-flottaison, caractérisé en ce qu'il comprend les étapes suivantes consistant à : 1) Réaliser une construction d'une tige d'ancrage précontrainte ; former un trou de forage dans un corps de sol par construction, et faire descendre la tige d'ancrage précontrainte dans le trou de forage, et après descente de la tige d'ancrage précontrainte, injecter un coulis dans le trou de forage ; 2) la tige d'ancrage précontrainte comprenant une tête d'ancrage et un corps de tige, la tête d'ancrage étant située à l'extérieur du trou de forage, et le corps de tige étant situé dans le trou de forage ; creuser autour d'une périphérie externe de la tête d'ancrage pour former une rainure de construction, et réaliser une construction en béton armé dans la rainure de construction pour former un pilier d'ancrage ; 3) réaliser un verrouillage de tension sur la tige d'ancrage précontrainte ; et 4) construire une structure souterraine au-dessus du corps de sol, et ancrer la tête d'ancrage dans la structure souterraine. De cette façon, la construction de tige d'ancrage précontrainte, la construction du pilier d'ancrage et la construction d'une structure souterraine n'interfèrent pas l'une avec l'autre, ce qui permet de faciliter la gestion de construction, le verrouillage de tension, et la simplification des étapes de construction ; en outre, une force de contrainte est générée pour la structure souterraine afin d'empêcher la structure souterraine de flotter vers le haut, évitant ainsi la déformation de la structure souterraine due à la flottaison vers le haut, de telle sorte que l'effet anti-flottaison est amélioré.
本发明涉及预应力抗浮锚杆施工的技术领域,公开了先张拉后锚固式预应力抗浮锚杆施工方法,其特征在于,步骤如下:1)、进行预应力锚杆施工;在土体中施工形成钻孔,预应力锚杆下放钻孔,下放后,钻孔内灌注泥浆;2)、预应力锚杆包括锚头和杆体,锚头处于钻孔外,杆体处于钻孔内;沿锚头外周开挖,形成施工槽,在施工槽内进行钢筋混凝土施工,形成锚墩;3)、对预应力锚杆进行张拉锁定;4)、在土体上方施工地下结构,将锚头锚入地下结构中。这样,预应力锚杆施工和锚墩施工与地下结构施工,互不干扰,便于施工管理;且便于进行张拉锁定,简化施工步骤;且对地下结构产生约束力、阻止其上浮,避免地下结构上浮变形,从而增强抗浮效果。
PRE-TENSIONING AND POST-ANCHORING CONSTRUCTION METHOD FOR PRESTRESSED ANTI-FLOATING ANCHOR ROD
The present invention relates to the technical field of prestressed anti-floating anchor rod construction. Disclosed is a pre-tensioning and post-anchoring construction method for a prestressed anti-floating anchor rod, characterized by comprising the following steps: 1) performing prestressed anchor rod construction; forming a drill hole in a soil body by construction, and lowering the prestressed anchor rod into the drill hole, and after lowering the prestressed anchor rod, pouring slurry into the drill hole; 2) the prestressed anchor rod comprising an anchor head and a rod body, the anchor head being located outside the drill hole, and the rod body being located in the drill hole; digging around an outer periphery of the anchor head to form a construction groove, and performing reinforced concrete construction in the construction groove to form an anchor pier; 3) performing tension locking on the prestressed anchor rod; and 4) constructing an underground structure above the soil body, and anchoring the anchor head into the underground structure. In this way, the prestressed anchor rod construction, the anchor pier construction, and the underground structure construction do not interfere with each other, facilitating construction management, facilitating tension locking, and simplifying construction steps; furthermore, a constraining force is generated for the underground structure to prevent the underground structure from floating upward, avoiding deformation of the underground structure due to upward floating, so that the anti-floating effect is enhanced.
La présente invention se rapporte au domaine technique de la construction de tige d'ancrage précontrainte anti-flottaison. L'invention concerne un procédé de construction en pré-tension et en post-ancrage d'une tige d'ancrage précontrainte anti-flottaison, caractérisé en ce qu'il comprend les étapes suivantes consistant à : 1) Réaliser une construction d'une tige d'ancrage précontrainte ; former un trou de forage dans un corps de sol par construction, et faire descendre la tige d'ancrage précontrainte dans le trou de forage, et après descente de la tige d'ancrage précontrainte, injecter un coulis dans le trou de forage ; 2) la tige d'ancrage précontrainte comprenant une tête d'ancrage et un corps de tige, la tête d'ancrage étant située à l'extérieur du trou de forage, et le corps de tige étant situé dans le trou de forage ; creuser autour d'une périphérie externe de la tête d'ancrage pour former une rainure de construction, et réaliser une construction en béton armé dans la rainure de construction pour former un pilier d'ancrage ; 3) réaliser un verrouillage de tension sur la tige d'ancrage précontrainte ; et 4) construire une structure souterraine au-dessus du corps de sol, et ancrer la tête d'ancrage dans la structure souterraine. De cette façon, la construction de tige d'ancrage précontrainte, la construction du pilier d'ancrage et la construction d'une structure souterraine n'interfèrent pas l'une avec l'autre, ce qui permet de faciliter la gestion de construction, le verrouillage de tension, et la simplification des étapes de construction ; en outre, une force de contrainte est générée pour la structure souterraine afin d'empêcher la structure souterraine de flotter vers le haut, évitant ainsi la déformation de la structure souterraine due à la flottaison vers le haut, de telle sorte que l'effet anti-flottaison est amélioré.
本发明涉及预应力抗浮锚杆施工的技术领域,公开了先张拉后锚固式预应力抗浮锚杆施工方法,其特征在于,步骤如下:1)、进行预应力锚杆施工;在土体中施工形成钻孔,预应力锚杆下放钻孔,下放后,钻孔内灌注泥浆;2)、预应力锚杆包括锚头和杆体,锚头处于钻孔外,杆体处于钻孔内;沿锚头外周开挖,形成施工槽,在施工槽内进行钢筋混凝土施工,形成锚墩;3)、对预应力锚杆进行张拉锁定;4)、在土体上方施工地下结构,将锚头锚入地下结构中。这样,预应力锚杆施工和锚墩施工与地下结构施工,互不干扰,便于施工管理;且便于进行张拉锁定,简化施工步骤;且对地下结构产生约束力、阻止其上浮,避免地下结构上浮变形,从而增强抗浮效果。
PRE-TENSIONING AND POST-ANCHORING CONSTRUCTION METHOD FOR PRESTRESSED ANTI-FLOATING ANCHOR ROD
PROCÉDÉ DE CONSTRUCTION EN PRÉ-TENSION ET EN POST-ANCRAGE D'UNE TIGE D'ANCRAGE PRÉCONTRAINTE ANTI-FLOTTAISON
先张拉后锚固式预应力抗浮锚杆施工方法
FU WENGUANG (author) / WU YIN (author) / LI HONGBO (author) / XIE CHENGQI (author) / LI XINYUAN (author) / DAI JINHONG (author) / GAO SHENGJIAN (author)
2020-08-27
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prestressed anchor cable tensioning construction control system
European Patent Office | 2023
|European Patent Office | 2023
|Anti-floating anchor rod for pre-tensioning method construction
European Patent Office | 2023
|Construction method of prestressed anti-floating anchor rod
European Patent Office | 2024
|European Patent Office | 2024
|