A platform for research: civil engineering, architecture and urbanism
The present invention relates to the technical filed of construction underground engineering, and provided thereby is a wall sinking construction method which allows a wall body to sink in a controlled manner. The wall sinking construction method is characterized in that retaining structures (1) are first formed on two sides, corresponding to a groove body, of the wall body (2); then a section of wall body of a certain height is produced on the ground, and jacks (4) and a supporting pile body (6) are installed on the two sides of the bottom of the wall body (2), which may reinforce the rock and soil mass under the supporting pile body (6). The wall body (2) is supported by the jacks (4) and the supporting pile body (6), the bottom of the wall body is suspended to form an excavation working space with a certain height; in the space, an underwater excavator is controlled remotely to excavate rock and soil in the groove body layer by layer; an elastic support (7) having rollers is sandwiched between the retaining structures (1) on the two sides of the wall body (2) and the groove body to transfer and balance rock and soil pressure, and thus wall sinking frictional resistance is controllable; and under the control of the jacks, a section of the wall body sinks and is connected to a higher section on the ground. When the described construction method is used for foundation pit supporting, the outer wall of a basement and a spatial steel support may be sunken and put in place at the same time to form a safe and economical foundation pit supporting system; the construction method also may be used for building side slope retaining walls and underground diaphragm walls.
La présente invention se rapporte au domaine technique de l'ingénierie souterraine de construction, et concerne ainsi un procédé de construction de fonçage de paroi qui permet à un corps de paroi de s'enfoncer de manière contrôlée Le procédé de construction de fonçage de paroi est caractérisé en ce que des structures de retenue (1) soient d'abord formées sur deux côtés, correspondant à un corps de rainure, du corps de paroi (2); puis une section de corps de paroi d'une certaine hauteur soit fabriquée sur le sol, et des vérins (4) et un corps de pieu de support (6) soient installés sur les deux côtés du fond du corps de paroi (2), ce qui peut renforcer la masse de roche et de sol sous le corps de pieu de support (6). Le corps de paroi (2) est supporté par les vérins (4) et le corps de pieu de support (6), le fond du corps de paroi est suspendu pour former un espace de travail d'excavation avec une certaine hauteur; dans l'espace, une excavatrice sous-marine est commandée à distance pour excaver la roche et le sol dans le corps de rainure couche par couche; un support élastique (7) ayant des rouleaux est pris en sandwich entre les structures de retenue (1) sur les deux côtés du corps de paroi (2) et du corps de rainure pour transférer et équilibrer la pression de roche et de sol, et par conséquent la résistance au frottement de fonçage de paroi peut être contrôlée; et sous la commande des vérins, une section du corps de paroi s'enfonce et est reliée à une section supérieure sur le sol. Lorsque le procédé de construction décrit est utilisé pour supporter une fosse de fondation, la paroi extérieure d'un sous-sol et un support d'acier spatial peuvent être enfoncés et mis en place en même temps pour former un système de support de fosse de fondation sûr et économique; le procédé de construction peut également être utilisé pour construire des parois de retenue de pente latérale et des parois moulées souterraines.
一种沉墙施工法,使墙体受控下沉,属于土木建筑地下工程技术领域,其特点为:在墙体(2)对应槽体两侧先形成挡土结构(1),然后在地面制作一段高度墙体,在墙体(2)底部两侧安装千斤顶(4)及支撑桩体(6),可加固支撑桩体(6)下岩土体,墙体(2)由千斤顶(4)和支撑桩体(6)支撑,墙体底部悬空,形成具有一定高度的挖掘作业空间,在该空间内远程遥控水下挖掘机逐层挖除槽体内岩土;墙体(2)与槽体两侧挡土结构(1)间夹入带滚轮的弹性支撑杆(7),传递平衡岩土压力,使墙体下沉摩阻力可控;墙体在千斤顶控制下下沉一段,在地面接高一段。该施工法用于基坑支护时,可将地下室外墙和空间钢支撑同时下沉就位,形成安全经济的基坑支护体系;该施工法也可用于边坡挡墙和地下防渗墙的修筑。
The present invention relates to the technical filed of construction underground engineering, and provided thereby is a wall sinking construction method which allows a wall body to sink in a controlled manner. The wall sinking construction method is characterized in that retaining structures (1) are first formed on two sides, corresponding to a groove body, of the wall body (2); then a section of wall body of a certain height is produced on the ground, and jacks (4) and a supporting pile body (6) are installed on the two sides of the bottom of the wall body (2), which may reinforce the rock and soil mass under the supporting pile body (6). The wall body (2) is supported by the jacks (4) and the supporting pile body (6), the bottom of the wall body is suspended to form an excavation working space with a certain height; in the space, an underwater excavator is controlled remotely to excavate rock and soil in the groove body layer by layer; an elastic support (7) having rollers is sandwiched between the retaining structures (1) on the two sides of the wall body (2) and the groove body to transfer and balance rock and soil pressure, and thus wall sinking frictional resistance is controllable; and under the control of the jacks, a section of the wall body sinks and is connected to a higher section on the ground. When the described construction method is used for foundation pit supporting, the outer wall of a basement and a spatial steel support may be sunken and put in place at the same time to form a safe and economical foundation pit supporting system; the construction method also may be used for building side slope retaining walls and underground diaphragm walls.
La présente invention se rapporte au domaine technique de l'ingénierie souterraine de construction, et concerne ainsi un procédé de construction de fonçage de paroi qui permet à un corps de paroi de s'enfoncer de manière contrôlée Le procédé de construction de fonçage de paroi est caractérisé en ce que des structures de retenue (1) soient d'abord formées sur deux côtés, correspondant à un corps de rainure, du corps de paroi (2); puis une section de corps de paroi d'une certaine hauteur soit fabriquée sur le sol, et des vérins (4) et un corps de pieu de support (6) soient installés sur les deux côtés du fond du corps de paroi (2), ce qui peut renforcer la masse de roche et de sol sous le corps de pieu de support (6). Le corps de paroi (2) est supporté par les vérins (4) et le corps de pieu de support (6), le fond du corps de paroi est suspendu pour former un espace de travail d'excavation avec une certaine hauteur; dans l'espace, une excavatrice sous-marine est commandée à distance pour excaver la roche et le sol dans le corps de rainure couche par couche; un support élastique (7) ayant des rouleaux est pris en sandwich entre les structures de retenue (1) sur les deux côtés du corps de paroi (2) et du corps de rainure pour transférer et équilibrer la pression de roche et de sol, et par conséquent la résistance au frottement de fonçage de paroi peut être contrôlée; et sous la commande des vérins, une section du corps de paroi s'enfonce et est reliée à une section supérieure sur le sol. Lorsque le procédé de construction décrit est utilisé pour supporter une fosse de fondation, la paroi extérieure d'un sous-sol et un support d'acier spatial peuvent être enfoncés et mis en place en même temps pour former un système de support de fosse de fondation sûr et économique; le procédé de construction peut également être utilisé pour construire des parois de retenue de pente latérale et des parois moulées souterraines.
一种沉墙施工法,使墙体受控下沉,属于土木建筑地下工程技术领域,其特点为:在墙体(2)对应槽体两侧先形成挡土结构(1),然后在地面制作一段高度墙体,在墙体(2)底部两侧安装千斤顶(4)及支撑桩体(6),可加固支撑桩体(6)下岩土体,墙体(2)由千斤顶(4)和支撑桩体(6)支撑,墙体底部悬空,形成具有一定高度的挖掘作业空间,在该空间内远程遥控水下挖掘机逐层挖除槽体内岩土;墙体(2)与槽体两侧挡土结构(1)间夹入带滚轮的弹性支撑杆(7),传递平衡岩土压力,使墙体下沉摩阻力可控;墙体在千斤顶控制下下沉一段,在地面接高一段。该施工法用于基坑支护时,可将地下室外墙和空间钢支撑同时下沉就位,形成安全经济的基坑支护体系;该施工法也可用于边坡挡墙和地下防渗墙的修筑。
WALL SINKING CONSTRUCTION METHOD
PROCÉDÉ DE CONSTRUCTION DE FONÇAGE DE PAROI
一种沉墙施工法
WEN YANXU (author)
2020-10-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen