A platform for research: civil engineering, architecture and urbanism
CONNECTING STRUCTURE, CONCRETE-FILLED STEEL PIPE COLUMN, AND CONSTRUCTION METHOD
A concrete-filled steel pipe column connecting structure, a concrete-filled steel pipe column, and a construction method, the concrete-filled steel pipe column connecting structure (1) comprising a core positioning sleeve (101) used for connecting two exposed steel pipes at opposite positions, a plurality of longitudinal rib sleeves (104) used for connecting two exposed longitudinal ribs at opposite positions, a hoop restraint sleeve (105) used for restraining the core positioning sleeve (101) and the longitudinal rib sleeves (104), and an external sealing sleeve (107) used for sealing the space between a first split concrete-filled steel pipe column (2) and a second split concrete-filled steel pipe column (3); the concrete-filled steel pipe column comprises the first split concrete-filled steel pipe column (2), the second split concrete-filled steel pipe column (3), and the concrete-filled steel pipe column connecting structure (1); and the construction method for the concrete-filled steel pipe column comprises the following steps: assembling the concrete-filled steel pipe column connecting structure (1), respectively connecting the concrete-filled steel pipe column connecting structure (1) to the first split concrete-filled steel pipe column (2) and the second split concrete-filled steel pipe column (3), and grouting. The present concrete-filled steel pipe column connecting structure (1) connects the first split concrete-filled steel pipe column (2) and the second split concrete-filled steel pipe column (3), and enables the connecting nodes to be arranged in the concrete-filled steel pipe columns whilst ensuring the strength of the connection.
L'invention concerne une structure de raccordement de colonnes de tubes d'acier remplie de béton, une colonne de tubes d'acier remplie de béton et un procédé de construction. La structure de raccordement de colonnes de tubes d'acier remplie de béton (1) comprend un manchon de positionnement de noyau (101) permettant de relier deux tubes d'acier exposés à des positions opposées, une pluralité de manchons de nervures longitudinales (104) servant à relier deux nervures longitudinales exposées à des positions opposées, un manchon de retenue d'arceau (105) permettant de retenir le manchon de positionnement de noyau (101) et les manchons de nervures longitudinales (104), et un manchon d'étanchéité externe (107) destiné à sceller l'espace entre une première colonne de tubes d'acier remplie de béton fendue (2) et une seconde colonne de tubes d'acier remplie de béton fendue (3). La colonne de tubes d'acier remplie de béton comprend la première colonne de tubes d'acier remplie de béton fendue (2), la seconde colonne de tubes d'acier remplie de béton fendue (3) et la structure de raccordement de colonnes de tubes d'acier remplie de béton (1). Le procédé de construction de la colonne de tubes d'acier remplie de béton comprend les étapes suivantes : l'assemblage de la structure de raccordement de colonnes de tubes d'acier remplie de béton (1), le raccordement respectif de la structure de raccordement de colonnes de tubes d'acier remplie de béton (1) à la première colonne de tubes d'acier remplie de béton fendu (2) et à la seconde colonne de tubes d'acier remplie de béton fendu (3), et l'injection de coulis. La présente structure de raccordement de colonnes de tubes d'acier remplie de béton (1) relie la première colonne de tubes d'acier remplie de béton fendue (2) et la seconde colonne de tubes d'acier remplie de béton fendue (3), et permet aux nœuds de raccordement d'être disposés dans les colonnes de tubes d'acier remplies de béton tout en assurant la résistance du raccordement.
一种钢管混凝土叠合柱连接结构、钢管混凝土叠合柱及其施工方法,其中,钢管混凝土叠合柱连接结构(1)包括用于连接两个位置相对的外露钢管的核心定位套筒(101)、多个用于连接两个位置相对的外露纵筋的纵筋套筒(104)、用于约束核心定位套筒(101)和纵筋套筒(104)的环箍约束套筒(105)、用于密封第一分体钢管混凝土叠合柱(2)与第二分体钢管混凝土叠合柱(3)之间空间的外部密封套筒(107);钢管混凝土叠合柱包括第一分体钢管混凝土叠合柱(2)、第二分体钢管混凝土叠合柱(3)以及该钢管混凝土叠合柱连接结构(1);钢管混凝土叠合柱的施工方法包括以下步骤:组装钢管混凝土叠合柱连接结构(1),将钢管混凝土叠合柱连接结构(1)分别与第一分体钢管混凝土叠合柱(2)和第二分体钢管混凝土叠合柱(3)连接,注浆。该钢管混凝土叠合柱连接结构(1)连接第一分体钢管混凝土叠合柱(2)、第二分体钢管混凝土叠合柱(3),能够在保证连接强度的情况下使连接节点设置在钢管混凝土叠合柱中。
CONNECTING STRUCTURE, CONCRETE-FILLED STEEL PIPE COLUMN, AND CONSTRUCTION METHOD
A concrete-filled steel pipe column connecting structure, a concrete-filled steel pipe column, and a construction method, the concrete-filled steel pipe column connecting structure (1) comprising a core positioning sleeve (101) used for connecting two exposed steel pipes at opposite positions, a plurality of longitudinal rib sleeves (104) used for connecting two exposed longitudinal ribs at opposite positions, a hoop restraint sleeve (105) used for restraining the core positioning sleeve (101) and the longitudinal rib sleeves (104), and an external sealing sleeve (107) used for sealing the space between a first split concrete-filled steel pipe column (2) and a second split concrete-filled steel pipe column (3); the concrete-filled steel pipe column comprises the first split concrete-filled steel pipe column (2), the second split concrete-filled steel pipe column (3), and the concrete-filled steel pipe column connecting structure (1); and the construction method for the concrete-filled steel pipe column comprises the following steps: assembling the concrete-filled steel pipe column connecting structure (1), respectively connecting the concrete-filled steel pipe column connecting structure (1) to the first split concrete-filled steel pipe column (2) and the second split concrete-filled steel pipe column (3), and grouting. The present concrete-filled steel pipe column connecting structure (1) connects the first split concrete-filled steel pipe column (2) and the second split concrete-filled steel pipe column (3), and enables the connecting nodes to be arranged in the concrete-filled steel pipe columns whilst ensuring the strength of the connection.
L'invention concerne une structure de raccordement de colonnes de tubes d'acier remplie de béton, une colonne de tubes d'acier remplie de béton et un procédé de construction. La structure de raccordement de colonnes de tubes d'acier remplie de béton (1) comprend un manchon de positionnement de noyau (101) permettant de relier deux tubes d'acier exposés à des positions opposées, une pluralité de manchons de nervures longitudinales (104) servant à relier deux nervures longitudinales exposées à des positions opposées, un manchon de retenue d'arceau (105) permettant de retenir le manchon de positionnement de noyau (101) et les manchons de nervures longitudinales (104), et un manchon d'étanchéité externe (107) destiné à sceller l'espace entre une première colonne de tubes d'acier remplie de béton fendue (2) et une seconde colonne de tubes d'acier remplie de béton fendue (3). La colonne de tubes d'acier remplie de béton comprend la première colonne de tubes d'acier remplie de béton fendue (2), la seconde colonne de tubes d'acier remplie de béton fendue (3) et la structure de raccordement de colonnes de tubes d'acier remplie de béton (1). Le procédé de construction de la colonne de tubes d'acier remplie de béton comprend les étapes suivantes : l'assemblage de la structure de raccordement de colonnes de tubes d'acier remplie de béton (1), le raccordement respectif de la structure de raccordement de colonnes de tubes d'acier remplie de béton (1) à la première colonne de tubes d'acier remplie de béton fendu (2) et à la seconde colonne de tubes d'acier remplie de béton fendu (3), et l'injection de coulis. La présente structure de raccordement de colonnes de tubes d'acier remplie de béton (1) relie la première colonne de tubes d'acier remplie de béton fendue (2) et la seconde colonne de tubes d'acier remplie de béton fendue (3), et permet aux nœuds de raccordement d'être disposés dans les colonnes de tubes d'acier remplies de béton tout en assurant la résistance du raccordement.
一种钢管混凝土叠合柱连接结构、钢管混凝土叠合柱及其施工方法,其中,钢管混凝土叠合柱连接结构(1)包括用于连接两个位置相对的外露钢管的核心定位套筒(101)、多个用于连接两个位置相对的外露纵筋的纵筋套筒(104)、用于约束核心定位套筒(101)和纵筋套筒(104)的环箍约束套筒(105)、用于密封第一分体钢管混凝土叠合柱(2)与第二分体钢管混凝土叠合柱(3)之间空间的外部密封套筒(107);钢管混凝土叠合柱包括第一分体钢管混凝土叠合柱(2)、第二分体钢管混凝土叠合柱(3)以及该钢管混凝土叠合柱连接结构(1);钢管混凝土叠合柱的施工方法包括以下步骤:组装钢管混凝土叠合柱连接结构(1),将钢管混凝土叠合柱连接结构(1)分别与第一分体钢管混凝土叠合柱(2)和第二分体钢管混凝土叠合柱(3)连接,注浆。该钢管混凝土叠合柱连接结构(1)连接第一分体钢管混凝土叠合柱(2)、第二分体钢管混凝土叠合柱(3),能够在保证连接强度的情况下使连接节点设置在钢管混凝土叠合柱中。
CONNECTING STRUCTURE, CONCRETE-FILLED STEEL PIPE COLUMN, AND CONSTRUCTION METHOD
STRUCTURE DE RACCORDEMENT, COLONNE DE TUBES D'ACIER REMPLIE DE BÉTON ET PROCÉDÉ DE CONSTRUCTION
连接结构、钢管混凝土叠合柱及施工方法
CHEN JIANWEI (author) / WANG ZHANWEN (author) / SONG XIAOQING (author) / YANG TAO (author) / YAO JIUSHUN (author)
2020-12-24
Patent
Electronic Resource
Chinese
European Patent Office | 2019
|CONSTRUCTION METHOD OF CONCRETE FILLED STEEL-PIPE COLUMN
European Patent Office | 2020
|European Patent Office | 2022
|Connecting structure of concrete filled steel tubular column
European Patent Office | 2023
|